The document provided is a Scope of Work for the Gaylord Field Office -Facelift Project in Otsego County, Michigan. The project intent is to update the Gaylord Field Office exterior with durable, energy-efficient, and low-maintenance exterior products to reduce future repair needs. The contractor shall provide all labor, materials, and equipment to side the entire building with Variform Camden Pointe double .044 mil siding in a sandy tan color, install aluminum soffit and fascia, replace all windows with vinyl frame, low-E insulated glass units, replace two south-side entrance doors with commercial-grade steel doors, install matching metal roofing on existing entrance awnings, and install Owens-Corning Cultured stone veneer or corrugated metal panels around exterior water connections.
The related state and local contract opportunity is named 751/19302. AGY; Gaylord Field Office - Siding, and the bid documents must be uploaded to SIGMA VSS. Vendors are advised to contact the SIGMA Help Desk if they have any questions or experience issues with their electronic submission. The document does not provide information about pricing terms, set asides, incumbents, funding requirements, or award dates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications 19302.pdf | ||
| Advertisement 19302.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20190522
Scope of Work
Gaylord FRD Field Office -Facelift Project
Siding, Doors, Windows, Soffit, Fascia, Trim
Project intent is to update the Gaylord Field Office exterior with durable, energy efficient and low maintenance exterior products that will reduce future repair needs.
Contractor Shall provide all labor, materials, equipment for below projects:
• Side entire building with Variform Camden Pointe double .044 mil in sandy tan color (or equivalent with .044 mil or greater thickness). Exact color choice to come from standard palate choices.
o Building is approximately 36’x214’ with 10’ sidewalls. The south side of the facility has 9 - 12’x10’ garage doors.
o Repair current siding as necessary to provide secure nailing base for new siding.
• Install aluminum soffit and fascia for entire building. This includes main structure, back porch area and two front entrance awning areas.
o Current soffit structure may require removal or opening to achieve airflow to attic spaces in heated portions of the building.
o Repair/replace current wood soffit/fascia as needed to provide solid nailing surfaces o White or brown, owner to select o Entrance awnings must be fully covered with metal or siding materials, to include supports and gable face.
• Provide durable, weatherproof, maintenance-free solution garage trim. This may be, but not limited to, wrapping door trim with woodgrain PVC product.
• Replace all windows with Vinyl frame, low E insulated glass, with same operation as exists (casement – casement, double hung- double hung)with screens. Simonton, Pella or other approved equal vinyl replacement window. Proposed new units are not to decrease glass size by more than 1” in any direction. Contractor is responsible for measuring each window for replacement size.
• Replace 2 south side entrance doors in office/garage area with 36” commercial grade steel door (brown in color), with half lite door. Owner to make final selection. Door hardware to be installed, door closer, kick plate on direction of travel side (stainless steel) , lever handle lockset keyed to match existing , Install PVC/Vinyl brickmould and wrap jambs with aluminum to match other trims.
• Install matching (brown) metal roofing on existing entrance awnings.
• Install Owens-Corning Cultured stone veneer CSV2084 Earth River Rock or approved equivalent around exterior water connections. Area to be protected is approximately
6’x4’ located at the north and south side of the building.
o Option 2 Install ribbed or corrugated metal panels in dark brown to match other trim.
20190522
Contractor shall provide owner representative with submittals of building materials specificed and colors (Doors, windows, siding, soffit/facia) for approval before ordering.
Daily clean up of construction materials is required. Extra care shall be taken for nail/screw cleanup around doors, walkways and driveway areas. Contractor must keep area clean in front of emergency equipment to the extent possible, to include dumpsters, vehicles etc.
Contractor is responsible for offsite disposal of all construction waste. Contractor shall not utilize onsite DNR dumpster.
Contractor shall inform department representative of day’s planned garage door blockages to ensure fire equipment is not blocked from emergency response.
All work is to be performed to meet Michigan Building Code. All applicable permits and inspections are through the State of Michigan LARA and are the responsibility of the contractor.