Scope Documents -Narrative SOW 5-22-2024 (002).pdf
PDF 12 MB Posted
- Solicitation number
- BPM044930
- Issued by
- Caroline County, Deer Park Town, Maryland
About this file
The document provided is a Scope of Work for the CAROLINE COUNTY DEPARTMENT OF PUBLIC WORKS YARD PIPE REPLACEMENT project, a state and local contract opportunity issued by Caroline County, Maryland. The project involves the removal of existing pipes and installation of new pipes at the Department of Public Works facility located in Denton, Maryland. A mandatory pre-bid meeting will be held on July 1, 2024, at 8:00 am, and questions are due by July 10, 2024. Bids must be submitted by July 25, 2024, at 10:00 am, where they will be publicly opened and read aloud. The County Commissioners reserve the right to reject any or all bids, and certified minority business enterprises are encouraged to respond.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information beyond the project scope and timeline. The contract opportunity is limited to the removal and installation of pipes at the Caroline County Department of Public Works facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-WORKS CONSTRUCTION CORPORATION
Date: May 22, 2024
Scope Narrative and Documents
Project: Denton Public Pipe Replacement
Subject: Scope Narrative
Anticipated Project Site: Caroline County Public Works – 520 Wilmuth Street, Denton, MD
I. Scope Narrative
a. Project is located at Caroline County Public Works building, 520 Wilmuth
Street, Denton MD. The building property holds multiple buildings utilized for county maintenance. These buildings, roughly, sit across from each other, with a surface lot between. There is existing stormwater infrastructure- 54” diameter Cast Iron Pipe (CIP) that is installed length of parking lot, estimated 245 feet, that spilt this parking lot. It has been estimated the first
30 to 40 feet of inlet/ outlet sides have been replaced with concrete structures in past projects. This pipe directs local stream underneath parking lot.
b. CCPW is currently experiencing “small” sinkholes in parking lot. CCPW investigated and determined the remaining CIP has started to ‘deteriorate.
This project is to remove & replace the remaining Cast-Iron Pipe (CIP).
c. Reference attached documentation- Attached Documents: SD-01.A, SD-01.B, SD-01.C, SD-02.A, SD-02.B, SD-03, SD-04, SD-05, SD-06
II. Brief Scope of Work
1. Remove and replace pipe infrastructure. Estimated 245ft length. 54” Diameter CIP
a. Phase excavation of existing pipe to allow maintenance staff to utilize parking lot.
b. Add additional manhole structure towards outlet end.
c. Replace surface parking lot drain inlet.
2. Remove and haul off spoils.
a. No storage of spoils.
3. Backfill excavation with suitable soils.
4. Replace surface lot with Crush & Run fill AS SUBGRADE (Final Grade by others).
5. Include shoring for life cycle of excavation.
6. Follow all local permits, codes, and regulations for construction.
a. For example, necessary erosion control.
Prepared by: Ben Nickey 5/22/2024.
Project: Denton Public Works Pipe Replacement Client: Caroline County
Overrall Site Plan
Proposed LOD
Address: 520 Wilmuth Street, Denton, MD 21629
5-21-2024
SD-01.A
Overall Site Plan
Plan South
Plan North
Plan East Plan West
245 F eet
30 Feet
Estimated Limits of disturbance:
- 245ft Length
- 30ft Width
Existing Pipe:
- Assume Finished Floor (Subgrade) = 0.00 ft
- Top of pipe = 15Ft BFF
- Pipe is 54inch DIA
5-21-2024
Manhole cover is end point Phase Two
30 ft
Start Point Phase One - Approx. 30' inward foot from outlet
Flow direction of stream
Flow direction of stream
SD-03
SD-04
SD-05
SD-01.B
#01 Project Site
#02 Entrance/ Access
#01
North 6th street
520 Wilmuth Street, Denton, MD 21629
#02
EGRESS PLAN
#02
SD-01.C
Egress Plan
5-21-2024
#01 First Phasing Construction
#02 PUBLIC WORKS Vehicle Access
#03 Closed Egress
#04 Active sinkhole
#01
#03
#02
Estimated Start point for replacement
#02
#02
Phase One Construction
#04
SD-02.A
Phase Plan
SD1.B Scope Document Phase Plan
Phase Two Construction
SCOPE OF WORK:
#01 Second Phasing Construction
#02 PUBLIC WORKS Vehicle Access
#03 Closed Egress
#04 Active Sink hole
#01
#03 #02
#02
#02
Estimated Phase Two Start point for replacement
#04
SD-02.B
Phase Plan
Existing to remain manhole & Structure
SD-03
Trailer
SCOPE OF WORK
#01 Remove & replace 54" D pipe- starting at manhole structure
#02 Phase Two Start or End Point: Connect to existing concrete man hole structure
#03 Remove & replace estimated 20ft of guardrail for excavation
#04 Active Sink hole
#02
#01
#03
Connect to existing storm line- Reference Detail 3/SD-05
Trailer
SCOPE OF WORK
#01 Remove & replace 54" D pipe- starting at manhole structure
#02 Phase One Start or End Point: Connect to existing concrete man hole structure
#03
#04 Active Sink hole
SD-04
#05 Add man hole structure for maintenance to line
#01
#04
#05
#02
SCOPE OF WORK
#01 Remove & replace 54" D pipe-starting at manhole structure
#02 Phase One Start or End Point:
Connect to existing concrete man hole structure- Reference Detail #01/
SD-05
#03 Estimated 30 ft of storm line from inlet replaced prior, and is new- Make connection per #02
#04 Approx. location of connection to existing storm outlet
#01
#01
#02
#03 #02
Trailer
Dumpster
Dumpster
SD-05DETAIL #01/ SD-05
Looking Plan South according to Overall Site Plan
Looking Plan North according to Overall Site Plan
SD-06
*Reference document - "SD1.A Overall Site Plan" Page #01 for plan North/ South*
File details come from the government source that posted it. Updated .