Scope Arc Flash Survey - Broome Bldgs. 3, 4 & 5 8-11-26.docx

DOCX document 66 KB Posted

Attached to
BM26077 Arc Flash Survey
Solicitation number
2140558
Issued by
Broome County, New York

About this file

This is a Scope of Work document for an Arc Flash Survey project issued by OPWDD's Broome Developmental Disabilities Service Office (DDSO) in Binghamton, New York. The project involves conducting a comprehensive arc flash survey at the Broome DDSO Campus located at 249 Glenwood Road, Binghamton, NY, specifically for Buildings 3, 4, and 5. A mandatory site visit is scheduled for November 12, 2026 at 8:00 AM, and vendors must attend this visit prior to submitting quotes. Quotes must be submitted using the Official Bid Form to brm.bids@opwdd.ny.gov no later than 5:00 PM on November 19, 2026. The contract term is 60 days from the date of award, and this is a Request for Quotes (RFQ) process where the contract will be awarded to the most responsible and responsive vendor providing the lowest cost while meeting all requirements outlined in the scope of work.

This is a Public Works project requiring all vendors and subcontractors to be registered with the New York State Department of Labor and to comply with prevailing wage requirements. A copy of the vendor's NYS Department of Labor certificate must be submitted with the quote. The awarded vendor must provide certificates of Liability Insurance and Worker's Compensation Insurance, complete Lobbying Law Forms, and submit a signed Appendix A prior to contract execution. The Broome DDSO reserves the right to reject all quotes and makes no concessions to vendors for misunderstandings regarding project specifications or conditions.

View the file

Other files

File Type Posted
BRM RFQ Form 25-27.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE

Facility: Broome DDSOO Main Campus

Facility Address: 249 Glenwood Rd, Binghamton NY 13905

Point of Contact: Dan Blair Plant Superintendent

Contact Phone Number: 607-793-7071

Project Title: Arc Flash Survey

Summary of Work: Perform Arc Flash survey from primary switches in Bldg.3 out to the 4 & 5 Bldgs.

DESCRIPTION:

Arc Flash Survey. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to this scope of work and architectural drawings if supplied. Upon completion of Arc Flash Survey, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with the Maintenance Supervisor.

SCOPE OF WORK:

Perform Arc Flash survey from primary switches in the Bldg.3 Power Plant out to include all of Bldgs. 4 & 5.

Review existing single-line diagrams, panel schedules, and previous electrical studies (if available). Deliver revised, accurate electric one-line diagrams of the modeled electrical system. Hard and digital copies, upon completion.

The study shall cover the electrical distribution system starting from [Utility Source / Medium Voltage service 34,500v] down to the 480V, 208V 3 phase, and 120V panels, omitting smaller 120V/240V single-phase loads unless specifically required.

Infra-red scanning and pictures for transformers, panels, switches and contactors as required by code.

Provide a signed and sealed (by a professional engineer) a report detailing methodology, assumptions, short circuit results, arc flash calculations and recommendations for hazard reduction.

Provide practical engineering or operational recommendations (e.g., adjusting breaker instantaneous settings, modifying fuse sizes) to reduce high incident energy levels below standard threshold limits where feasible.

Supply & install durable, high-adhesion, industrial-grade, UV resistant arc flash labels for all evaluated equipment. Labels shall display Nominal system voltage, arc flash boundary distance. Including Required PPE level, and shock protection boundaries. (Limited & Restricted).

48 Notice will be given to the facility prior to any planned power outages.

Contractor shall warrantee work for a period of one year from date of payment for job. Warrantee shall be for parts and labor.

Work shall conform to all applicable codes, be done according to manufacturers’ instructions as applicable, and follow industry best practices.

GENERAL REQUIREMENTS:

0. All Bidders must have DOL Article 8 Certification Prior to bidding, per NYS Labor Law 220-i. Effective December 30, 2024.

0. Virtual participation is acceptable; however, the party present must ensure that it is conducted in such a way as not to disturb attendees physically present. Absolutely no recording will be permitted, only a live-stream in which the party present is responsible for retaining all information presented during the site visit. Details will not be repeated nor will extra time on site be permitted due to any technical limitations imposed by virtual participation. Under no circumstance shall any OPWDD staff or individuals be filmed during these virtual site visits.

0. Bid price is to include all materials, labor, disposal of materials fees, third party inspections, and site clean-up. Vendor must demonstrate a track record of completing job or otherwise show that they are competent to do the job in order to be awarded the work.

0. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. Failure to complete the job satisfactorily will impact a vendor’s ability to bid on future OPWDD jobs.

0. Press style fittings are not allowed on any OPWDD gas piping.

0. Push to Connect plumbing fittings are not allowed to be used on OPWDD facilities or homes. Standard “Fernco” type couplings are not allowed, you must use one with a full metal sleeve such as “Pro-Flex” type.

0. OPWDD is a self-permitting agency per 19 NYCRR, Section 1201.2(d)(1). As such most required inspections are performed by state employees. But where the work being done requires third party inspection (such as electrical work) hiring and paying for the third-party inspector shall be the responsibility of the vendor. In the case of inspections to be performed by the State, Contractor shall notify the inspector at least two working days in advance of when the inspections are needed. If there are any questions about what inspections are required for this job, discussed with the point of contact listed above. Job shall not be considered complete until proof of all required inspections is provided by vendor.

0. This is a NYS Public Works project, and prevailing wages are to be paid.

0. Quote shall include a start time expressed in days post issuance of a PO.

Work is to be done between the hours of 7AM and 7PM, Monday through Friday unless otherwise arraigned with Maintenance Supervisor in advance.

Work must be completed within 60 days of receiving the purchase order. Jobs outstanding past the 60-day period will cause bids on other Broome DDSOO jobs to be rejected until the backlog is resolved. Exceptions will be made for those jobs whether vendor can demonstrate to OPWDD that the delay is due to supply chain issues or issues that are the responsibility of OPWDD.

All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday in a manner acceptable to Maintenance Supervisor/Safety Department.

Any unforeseen conditions that may alter the established price are to be reported to the Facility Contact listed above immediately upon discovery.

Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.

At least one week prior to the commencement of the work, there shall be a meeting with local OPWDD Office of Property Supports and Emergency Services staff to discuss specific safety requirements needed to be adhered to during the work period and to review and sign the work safety plan.

Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.

All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. No suspected/possible ACM materials shall be disturbed unless there is a written testing report showing that it is clean.

Lawn Damage/Property Damage: If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn. Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job. Please protect Curbs & Sidewalks.

Continuity of Work/Communication/Scheduling: Once the job has begun, it is to be worked on continuously until completed. If there are any delays, even if due to inclement weather, a Work Control Representative MUST be contacted.

Deliveries: No deliveries shall be received by OPWDD. If you plan to have deliveries made to the Campus, you must be here to receive them, or they will be turned away by OPWDD.

Facility Safety: The Facility will be occupied during the job. For this reason, the contractor must take all reasonable care to safeguard building occupants. At no time can any exhaust or appliance vent outlet or air inlet be blocked without shutting off that equipment. If you create a Carbon Monoxide event in an occupied house because you fail to properly plan for your work, you will be financially responsible for all responding agencies and staff invoices and costs. The contractor shall ensure all tools, materials and other items are picked up, removed, or stored and are safely secured at the end of each workday. Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the Maintenance Supervisor at the end of the day. Vehicles should remain locked when unattended. Exterior doors are not to be propped open and left unattended. The work as indicated above shall be scheduled as not to interfered with other functions of the facility unless arranged and approved at least one week in advance.

All work performed as part of this job is to be coordinated with the Facility Contact listed above.

SITE VISIT

The site visit is mandatory, Wednesday November 11th at 8am. if you do not attend this visit your bid will not be accepted. Meet in the Lobby inside the main entrance.