This is a Scope of Work document from Escambia County's Neighborhood Enterprise Division (NED) for a SHIP Housing Repair project located at 6813 Gulley Lane, Pensacola, Florida. The primary service requested is the complete replacement of the septic system for an owner-occupied, single-family residence, including yard restoration, topsoil grading, grass seeding, straw application, drain tie-ins, and soil pipe extension to above the roof line. The project aims to make the home safer, more energy efficient, and more accessible in compliance with federal, state, and county laws and the SHIP repair program. A mandatory on-site walkthrough is scheduled for November 12, 2025, at 1:00 pm, with quotes due electronically via the OpenGov portal by November 20, 2025, at 1:00 pm. Quote review and opening will occur on November 21, 2025, at 11:30 am at 221 Palafox Place, Pensacola, Florida 32502, with all interested members of the public invited to attend. The project has a firm 60-day completion deadline from the contract start date.
Payment will be rendered as a lump sum at project completion for projects under $15,000, while projects exceeding $15,000 are eligible for a 40% draw upon 50% work completion, followed by a substantial completion draw at 150% less incomplete line items, with final payment contingent upon scope completion, building inspections, homeowner acceptance, contractor affidavit submission, warranty documentation, debris removal, and RRP checklist submission. Liquidated damages of $150 per day apply for work exceeding the contract period. Contractors must be licensed, insured, and in good standing with the county, with current W-9, Sunbiz registration, worker's compensation or exemption, and commercial general liability insurance with $1,000,000 coverage naming Escambia County as certificate holder. For projects valued at $25,000 or higher, 100% performance and payment bonds are required prior to the Notice to Proceed. The project is funded through the SHIP Housing Repair Program with no federal funding, and the county reserves the right to award line items separately for emergency services and delete items if total project costs exceed available budgeted funds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NED-Home_Rehab_-_6813_Gulley_Ln.pdf | ||
| SCOPE_-_6813_Gulley_Ln_-_Moultrie_GJ.docx | DOCX document | |
| PERMIT_-_6813_Gulley_Ln_-_Moultrie_GJ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ESCAMBIA COUNTY NEIGHBORHOOD ENTERPRISE DIVISION
SHIP Housing Repair – SCOPE OF WORK
| OWNER: |
| Gabriel & Jessica Moultrie |
| JOB NUMBER: |
| NED-S-6813-110325 |
| ADDRESS: |
| 6813 Gulley Ln. |
| DATE PREPARED: |
| 11-03-2025 |
Pensacola, FL 32505
| WALK DATE: |
| 11-12-2025 1:00 pm |
| PHONE: |
| 850.940.5250 |
| QUOTES DUE: |
| 11-20-2025 1:00 pm |
| QUOTE REVIEW: |
| 11-21-2025 11:30 am |
I/(we) certify that I/(we) have carefully examined the Housing Repair Specifications and Contractor Requirements related to the above referenced job, as furnished by Escambia County, and I/(we) have also examined the site on which the proposed work is to be performed. Based on these examinations, I propose to furnish all materials, tools, machinery and labor necessary to complete the work in a professional, workmanship manner and to complete the work at the prices listed.
TOTAL JOB COST
CONTRACTOR’S SIGNATURE
TITLE
QUOTE REVIEW:
FIRM
| |_| ACCEPTED |
| |_| REJECTED |
FIRM PHONE NUMBER
QUOTE REPRESENTATIVE
Escambia County Building Code
REQUIRED PERMITS AND INSPECTIONS:
By signing this document, you are certifying that your firm is not currently suspended, debarred, or in any way disqualified from participating in any state or federal funded housing rehabilitation programs.
All measurements are for reference only and should be confirmed by the bidder.
Mandatory ON-SITE walk-through: November 12, 2025, at 1PM
INSTRUCTIONS TO BIDDERS
Complete and submit the cover sheet and all numbered pages on this Scope of Work with a signature of the contractor, the total cost, and the completed itemized pricing table. Quote submissions will only be accepted online, via the OpenGov portal. Hand delivered email or fax submissions will NOT be accepted. All quotes must be received by the published “Quotes Due” deadline.
The quotes will be opened by a quote committee and awarded to the lowest, most responsive, and most responsible quoter. The opening of these quotes or the “Quote Review” will be held at 221 Palafox Place, Pensacola, FL 32502 on November 21, 2025, at 1130A. All interested members of the public are invited to attend. Should the total cost of this project exceed the funds available, then a removal of one or more of the pricing tables line items may be deleted in order to maintain the program’s budgetary restrictions.
CONTRACTOR’S RESPONSIBILITIES AND OBLIGATIONS
All repair work performed must be inspected, rough-ins and finals, and conform to state laws, and the Escambia County building codes and ordinances. The contractor is responsible for proper reattachment/hook-up of any/all of the following that apply, appliances, existing coaxial cable, telephone and interface, electric, water, and sewage. The contractor will only assist in moving the larger furniture and the contractor is not responsible for the removal of the homeowner’s trash, discarded belongings or furnishings. Labor, overhead, permits, insurance, and profit must be included into each itemized price and not listed as a separate itemized price or listed under “miscellaneous.” Non-compliance will result in rejection of bid. Review the “Bid Scope Materials List” for product lines and or their equivalents.
HOMEOWNER’S RESPONSIBILITIES AND OBLIGATIONS
The homeowner is responsible for maintaining existing utilities for the Contractor’s use during the rehabilitation period and for the removal of all belongings of furnishings from the designated work areas prior to the start date. The homeowner is also to be given options when selecting colors and styles of the products being replaced.
PAYMENT SCHEDULE
The payment will be lump sum payment at the project completion for bids and under $15,000. For bids over $15,000, the contractor will be eligible for a 40% draw once the NED confirms that 50% of the work has been completed as determined by line-item costs. Within 20 business days after the initial draw the contractor will be eligible for a substantial completion draw which is to be 150% less of any line-item costs that are not complete. The contractor will be eligible for final payment after the following conditions have been fulfilled:
*Completion of the Scope of Work
| *Inspection/Sign-off by Building Inspections and/or Health Department |
| *Acceptance by the Homeowner (Homeowner’s Release & Warranty) |
| *Contractor’s Final Affidavit |
| *Warranty Paper provided to the Homeowner |
| *Premises free from all construction debris |
| *Submission of RRP Checklist Form |
| *Original Invoice from Contractor |
*Surety’s Consent to Final Payment (if applicable)
COMPLETION DATE
There is a 60-day time limit on this rehabilitation project. For every day worked more than the contract period, liquidated damages of ONE HUNDRED and FIFTY DOLLAR ($150.00) per day will be assessed. During this timeline the homeowner is not to begin any new rehabilitation projects.
ESCAMBIA COUNTY NEIGHBORHOOD ENTERPRISE DIVISION
HOUSING REPAIR PROGRAMS
CONTRACTOR REQUIREMENTS
If your firm is awarded the bid for housing repair (SHIP or HUD programs), the following items must be current and on file to issue a Purchase Order.
| *Current W9 and Sunbiz registration (less than one year old). |
| *County Vendor Information sheet (less than one year old). |
| *Worker’s Compensation as required by State Law OR exemption form. |
| *Commercial General Liability, Automobile Liability and Pollution Liability at |
($1,000,000 coverage) listing Escambia County as a certificate holder and additional insured.
*Commercial General Liability, Automobile Liability and Pollution Liability certificates must state the following under additional Interest:
Escambia County C/O Neighborhood Enterprise Division 221 Palafox Place Suite 304 Pensacola, FL 32502-5844
All correspondence should be directed to the Neighborhood Enterprise Division, 221 Palafox Place, Suite 304, Pensacola, FL 32502 for review.
*For jobs valued at $25,000 or higher, a 100% Performance and Payment Bonds will be needed prior to the Notice to Proceed date. If the Bond is not filed within 10 days after the contract is signed, then a letter of insurability will be required. A Consent of Surety will be required before final payment. The contractor will be responsible for the recording of all bonds with Pam Childers, Clerk of The Circuit Court of Escambia County Florida.
Refer to BCC Office of Purchasing Risk Management Guidelines Procedure No: PP-180 (Performance and Payment Bonds) and PP-185 (Risk Management Guidelines) for further details. [http://www.myescambia.com/business/purchasing-policies-and-procedures]
Additionally, the Neighborhood Enterprise Division will maintain the following info in the contractor’s file:
*www.sam.gov Contractor may not be federally debarred and participate in this program
| *State registered or State Certified Contractor License |
| *Escambia County Competency Board License |
| *Escambia County Business/Occupational License |
| *EPA RRP Renovator and Firm Certifications |
Firms quoting Lead Based Paint Abatement jobs must also submit proof of Lead Abatement firm certification.
All information must be current at the time of the award. IF INFORMATION CANNOT BE PRODUCED IN A TIMELY MANNER, THE COUNTY RESERVES THE RIGHT TO AWARD THE BID TO THE NEXT MOST RESPONSIVE BIDDER.
SHIP Housing Repair Program Specifications PAGE 1
Gabriel & Jessica Moultrie 6813 Gulley Ln.
Pensacola, FL 32505 850.940.5250
SCOPE OF WORK
The rehabilitation of this owner-occupied, single-family, residence is to make the home safer, more energy efficient, and easier to access within the provisions of federal, state, and county laws and ordinances and the SHIP repair program. The rehabilitation of this home will include the following tasks as outlined below and the repaired areas are to match as close as possible to their existing surroundings. If additional tasks beyond those included in this scope are discovered, then additional funds may be allocated. Before any additional work is performed, written county approval will be needed. There is no federal funding for this project.
1. SEPTIC:
Replace the entire septic system as per the Florida Department of Environmental Protection permit specifications. All damage to the yard, created by men and equipment is to be restored and filled to the original grade with topsoil. These graded areas are to be uniform and in a smooth condition. Apply grass seed and straw for stabilization. If it is necessary to remove any part of the fence or landscaping, it is also to be restored to its original condition prior to the beginning of said repairs. Tie-in all drains to the new system and extend soil pipe to above the roof line, then attach to dwelling as required. The contractor is to return one time after the completion of said work and during the warranty period to repair any areas that have settled. If additional repairs are necessary, re-grade and re-seed.
Septic total $____________
Review the “Bid Scope Materials List” for product lines and or their equivalents.
File details come from the government source that posted it. Updated .