SCO-DPS-NGFortLiberty-RTI Pavilion (Dec-2024) RE-ADVERTISEMENT.pdf
PDF 139 KB Posted
- Attached to
- NC Department of Public Safety - NC National Guard (NCNG) – Construction Facilities Management Office (CFMO)
- Solicitation number
- 13-SCO-DPS-NGFortLiberty-RTI Pavilion (Dec-2024) (RE-ADVERTISEMENT)
- Issued by
- Graham County, North Carolina
About this file
This is a design services solicitation from the NC Department of Public Safety - NC National Guard (NCNG) Construction Facilities Management Office for the Fort Liberty RTI Pavilion project. The scope involves designing a 48' x 60' Regional Training Institute pavilion on a concrete pad with power, lighting, and water at 4595 Butner Road, Fort Liberty, NC. The pavilion will serve as an outdoor classroom for the 139th Regiment Military Academy and requires electrical outlets, lighting, trash receptacles, and modular outdoor seating and storage. Investigative services are needed to locate underground utilities, assess elevation changes, and analyze three potential construction areas. Letters of Interest are due by January 31, 2025, with three copies required along with SF-254 forms to be submitted to the NCNG-CFMO-DCM office in Raleigh.
The total project budget is $800,000, funded 100% through federal funds (OC-25 #202570920545). Initial design funds are secured for 100% design through Construction Documents, while bidding, construction administration, and closeout phases are contingent on receiving additional federal funding. The project must follow both state and federal guidelines, including NC State Construction Manual and various Army/DoD facility criteria. Proposing firms must be licensed to practice Architecture, Engineering, or Landscape Architecture in North Carolina. Previous submissions from the original advertisement remain valid and do not require resubmission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department/Agency NC Department of Public Safety - NC National Guard (NCNG) – Construction Facilities Management Office (CFMO)
Project Title Fort Liberty - RTI Pavilion (RE-ADVERTISEMENT)
Design Services Architecture/Engineering
Scope of Work
RE-ADVERTISEMENT
The objective of this project is to design a RTI (Regional Training Institute) pavilion measuring 48 feet by 60 feet on a concrete pad with power, lighting, and water. This pavilion will serve as an outdoor classroom to facilitate training at the 139th Regiment Military Academy. The structure will need to include electrical outlets, lighting, trash receptacles, and modular outdoor seating and storage options for the classroom. To determine the best location for the pavilion at 4595 Butner Road, Fort Liberty, NC, investigative services are required. These services will involve locating underground utilities, assessing elevation changes, and providing other assistance necessary for cost estimates and feasibility analyses for construction in three potential areas.
This project’s construction is contingent upon receipt of Federal funds.
Initial Design funds are fully funded. These funds will support 100% Design, through Construction Documents (CD).
Proceeding with Bidding, Construction Administration, and Closeout will be contingent upon receipt of Federal funding.
The NCNG will provide, planning documents, and other related program documents that detail potential future force structure and work activities on the complex for the Designer to Develop and Evaluate Alternatives.
As a federally funded, state executed project this project will follow both State and Federal guidelines. The design team should use the following references as basis for design and construction requirements:
a) NC State Construction Manual
b) Army Regulation 420-1, Army Facilities Management, Chapter 10
c) NGR 415-5, Military Construction Program Execution
d) NGR 420-10, Construction & Facilities Management Office Operations
e) NG Pamphlet 415-12, Army National Guard Facilities Allowances
f) ARNG Design Guide 415-5, General Facilities Information Design Guide
g) Unified Facilities Criteria (UFC) 1-200-1, DoD Building Code w/ Change 3
h) Unified Facilities Criteria (UFC) 2-100-01, Installation Master Planning with Change 3
NOTE:
All Letters of Interest received in response to the previous advertisement for design services will still be considered and remain valid for this Re-Advertisement. No additional response to this Re- Advertisement is required for any design firm that submitted a Letter of Interest in response to the previous advertisement for design services.
Please contact Spencer N. Colburn (spencer.n.colburn.nfg@army.mil) if you would like to confirm that your previously submitted Letter of Interest package was received.
Contact Spencer N. Colburn
Telephone 984-664-7711
Email spencer.n.colburn.nfg@army.mil
Total Project Budget $800,000 mailto:spencer.n.colburn.nfg@army.mil mailto:spencer.n.colburn.nfg@army.mil
Source of Funds 100% Federal Funds
Approved OC-25 # #202570920545
Publish Date January 15, 2025
Closing Date Friday - January 31, 2025
Submit THREE (3) Copies of Letter of Interest and SF-254 (Mailing Address):
North Carolina National Guard–CFMO–DCM Attn: Gail Simms 1636 Gold Star Drive Raleigh, NC 27607
Physical Location for Fed Ex/UPS Delivery (Delivery Address):
North Carolina National Guard–CFMO–DCM Attn: Gail Simms 1636 Gold Star Drive Raleigh, NC 27607
NC Licensing Statement
To offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. More information on the North Carolina state boards may be found at the following websites:
NC Board of Architecture: (http://www.ncbarch.org) NC Board of Examiners for Engineers & Surveyors: (http://www.ncbels.org) NC Board of Landscape Architects: (http://www.ncbola.org)
STATE BUILDING COMMISSION - SELECTING CRITERIA
In selecting designers, the selection committee should take into consideration qualification information including such factors as:
1. Specialized or appropriate expertise in the type of project.
2. Past performance on similar projects.
3. Adequate staff and proposed design or consultant team for the project.
4. Current workload and State projects awarded.
5. Proposed design approach for the project including design team and consultants.
6. Recent experience with project costs and schedules.
7. Construction administration capabilities.
8. Proximity to and familiarity with the area where the project is located.
9. Record of successfully completed projects without major legal or technical problems.
10. Other factors which may be appropriate for the project.
STATE BUILDING COMMISSION - SUBMITTAL CRITERIA
Proposing firms must submit THREE (3) copies of the Letter of Interest and THREE (3) copies of your current Standard Form 254 (SF 254) with the information package. The current SF 254 template is located at http://ncadmin.nc.gov/businesses/construction/forms-documents which is the State Building Commission approved form.
In the interest of cost-savings to the designers, consistency of the submittals and more efficient use of time by the pre-selection committee, the submitted information package should not include any notebooks, binders, tab, clips, etc. The format should be 8-1/2" x 11" pages stapled in the upper left-hand corner. The Letter of Interest should not exceed ten (10) single-sided pages or five (5) double-sided pages plus the SF 254.
E-mail and Fax submittals will not be accepted.
http://www.ncbarch.org/ http://www.ncbels.org/ http://www.ncbola.org/ http://ncadmin.nc.gov/businesses/construction/forms-documents
File details come from the government source that posted it. Updated .