SCO-22-25242-01C-Add#2.pdf

PDF 2 MB Posted

Attached to
NC Department of Pulic Safety
Solicitation number
SCO-22-25242-01C-Add#2
Issued by
Mecklenburg County, Biscoe Town, North Carolina

About this file

This is Addendum 2 issued by Smith Sinnett Architecture for the North Carolina Department of Public Safety's Samarcand Training Academy Hazardous Materials Abatement project (SCO# 22-25242-01C) in Biscoe, NC. The base bid work involves hazardous materials abatement within the existing 72,697 sq ft Main Building, including removal of asbestos floor tile, mastic, and ceiling tile, along with related demolition of casework, temporary walls, and disconnection of utilities. Sealed bids from Single Prime Contractors are due March 11, 2025 at 2:00 PM at the Administration Building Conference Room in Jackson Springs, NC. A mandatory pre-bid meeting was held February 26, 2025, and only contractors who attended may submit bids. The project duration is 90 consecutive calendar days from Notice to Proceed.

The project includes Alternate No. 1 for hazardous materials abatement in the adjacent 16,414 sq ft classroom building, Allowance No. 1 for removal of 2,500 sq ft of asbestos floor tile and mastic, and Unit Price No. 1 for additional asbestos floor tile and mastic removal per square foot. Liquidated damages are set at $250 per calendar day beyond completion. The contractor must provide performance and payment bonds for 100% of the contract amount. The owner will contract separately for asbestos air monitoring and clearance testing, though the contractor is responsible for costs of any failed tests. The building will remain occupied during construction and coordination with ongoing roof replacement work will be required.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4600 Lake Boone Trail, Suite 205 | Raleigh, NC 27607 | 919.781.8582 | HUB Certified | www.smithsinnett.com

ADDENDUM 2

ADDENDUM DATE: February 28, 2025

PROJECT: Samarcand Training Academy Hazardous Materials Abatement – SCO# 22-25242-01C 157 Eagle Lane Biscoe, NC 27209

OWNER: North Carolina Department of Public Safety 512 N. Salisbury Street Raleigh, NC 27604

ARCHITECT: Smith Sinnett Architecture, P.A.

4600 Lake Boone Trail, Suite 205 Raleigh, North Carolina 27607

BIDS DUE: March 11, 2025 at 2:00pm Samarcand Training Academy

Administration Building 3600 Samarcand Road Jackson Springs, NC 27281

Please note: Project Documents, Addenda, and Contractors list are available at www.smithsinnett.com under the ‘Documents’ icon on the navigation bar.

Among other items, this Addendum addresses issues raised in the Pre-Bid Meeting held on February 26, 2025 at 11:00 a.m.

Pre-Bid Agenda notes and Sign In sheet of those that attended are attached.

This Addendum shall be included in the contract for the above referenced project. All General, Supplementary and Special Conditions, etc., as originally specified or as modified below shall apply to these items.

GENERAL

1. REVISION: The Pre-Bid Meeting was Mandatory. Only Prime General Contractors that attended the Pre-Bid Meeting will be allowed to submit a bid.

2. GENERAL: Refer to the Attached Pre-Bid Meeting Agenda and Notes.

3. GENERAL: Pre-Bid Meeting Sign In Sheet is attached.

ARCHITECTURAL DRAWINGS

1. REVISION: Replace Sheet A0-01 in its entirety with the revised A0-01 Sheet included in this Addendum.

Modifications has been “clouded”.

http://www.smithsinnett.com/

4600 Lake Boone Trail, Suite 205 | Raleigh, NC 27607 | 919.781.8582 | HUB Certified | www.smithsinnett.com

End of Addendum 2

Attached:

Pre-Bid Conference Agenda, (4 Pages) Pre-Bid Meeting Sign-In Sheet (1 Page) Revised Drawing A0-01 (1 Page)

Smith Sinnett Architecture, P.A. | 4600 Lake Boone Trail, Suite 205, Raleigh, North Carolina 27607 | HUB Certified 1

PRE-BID CONFERENCE AGENDA

SAMARCAND TRAINING ACADEMY SIMULATION BUILDING

HAZARDOUS MATERIALS ABATEMENT

Date: February 26, 2025 | 11:00 am

Location: 157 Eagle Lane, Biscoe, North Carolina 27209

Owner: NC Department of Public Safety 512 N. Salisbury Street Raleigh, NC 27604

Architect: Smith Sinnett Architecture, P.A.

4600 Lake Boone Trail, Suite 205 Raleigh, NC 27607 Phone: (919) 781-8582

Robert Carmac, AIA - Project Architect

On behalf of the Owner and Smith Sinnett Architecture, we would like to thank you for your interest and attendance at this Pre-Bid Conference.

I Prebid Meeting is Mandatory for Prime Contractors

II Bid:

Sealed Bids from Single Prime Contractors will be received and publicly opened at:

2:00 p.m. on March 11, 2025 Administration Building Conference Room

3600 Samarcand Road Jackson Springs, NC 27281

III Bid Day Documents:

1. PROPOSAL FORM (Pages 1-4)

a. Page 1 – Provide Subcontractor information: Plumbing Subcontractor, Mechanical

Subcontractor, Electrical Subcontractor.

b. Page 2 – Fill out all Alternates. Acknowledge that Allowance amount has been included in the Base Bid. Fill out Unit Price amount. The amount shall be for unit amount indicated.

c. Page 3 – Provide the appropriate Affidavit A or Affidavit B.

d. Page 4 – Completely fill out. Ensure that Corporate seal is provided. Acknowledge that

Addendums have been received and incorporated into the bid.

2. Minority Business Participation Form and/or Affidavit

a. Identification of HUB Certified / Minority Business Participation Form Required.

i. Name on Form must be the exact name as provided to the NC Office for HUB

3. Form of Bid Bond (5%) or Certified Check (5%) – Use Provided Form in the Project Manual.

Note AIA Bid Bond Form will not be accepted.

4. Bid envelope should be sealed with the following information listed on the outside of the envelope.

a. Bidder’s Name and Address

b. North Carolina Contractor’s License Number

c. Name of Project

Smith Sinnett Architecture, P.A. | 4600 Lake Boone Trail, Suite 205, Raleigh, North Carolina 27607 | HUB Certified 2

5. If awarded the Contract, the Bidder must provide an executed Performance Bond and Payment Bond for 100% of the Contract by a company licensed in North Carolina.

a. 2 separate Bonds must be provided.

6. Certificates of Insurance meeting the requirements indicated in the Specifications will also be required. Refer to Article 34 of the General Conditions. 30 days notification by certified mail return receipt requested of any (including nonpayment of premium) cancellation, reduction, or elimination of the required policies.

7. Any bids that have qualifying notes or comments will be rejected.

IV Bid Opening:

1. For mailed bids:

a. It’s the contractor’s responsibility to ensure the bid arrives prior to the bid opening time. If you wish to send your bid via US Mail, FedEx or UPS, please allow several days for delivery since the bid must be received (NOT postmarked) by the date and time stated in the solicitation.

b. Place bid in a double envelope with “Sealed Bid Do Not Open” written on the envelope.

c. Sealed envelopes will be held and unsealed at the bid opening time. Envelope should arrive at least 24 hours prior to bid date/time.

d. Project Name must be clearly marked on the outside of the sealed envelope.

e. Address envelope to:

William J. Seawell, 3600 Samarcand Road, Jackson Springs, NC 27281.

2. For delivered bids:

a. The bid opening location is at the Administration Building Conference Room 3600 Samarcand Road, Jackson Springs, NC 27281

b. Plan to arrive at least 30 minutes in advance of the bid opening to allow time to process through the security gate, park and then gain access to the building.

V Schedule:

1. No bid may be withdrawn after the closing time for the receipt of bids for a period of 60 days.

2. Supplementary General Conditions:

a. Date of Final Acceptance: 90 consecutive calendar days from anticipated Notice to Proceed.

VI Liquidated Damages:

1. Supplementary General Conditions:

a. $250.00 each calendar day in excess of the stated completion time.

VII Examination of Bid Documents:

1. All Bidders are expected to fully examine and familiarize themselves with the Drawings, Specifications and Existing Conditions. All Bidders should read the scopes of the bid package.

Any questions or clarifications should be directed to the Architect. No allowances will be made after the bids are received for any oversight due to failure to examine the documents.

VIII Substitutions:

1. Substitutions or approvals of “Equals” will only be accepted if approved by the Architect in writing at least 10 days prior to the receipt of bids.

Smith Sinnett Architecture, P.A. | 4600 Lake Boone Trail, Suite 205, Raleigh, North Carolina 27607 | HUB Certified 3

IX Technical Questions:

1. Technical questions shall be submitted to Architect as soon as possible by email or phone.

rcarmac@smithsinnett.com

(919) 781-8582

2. Last day for questions shall be February 28 by 5:00 pm.

3. The Last Addendum will tentatively be issued March 3 by 5:00 pm.

X Construction Documents:

1. Construction Documents may be ordered from:

Smith Sinnett Architecture 4600 Lake Boone Trail, Suite 205 Raleigh, NC 27607 919-781-8582

2. Electronic Copies of the Plans and Specifications are available upon request and with a completed Plan Request Form found at www.smithsinnett.com under the Documents Tab.

XI Addenda:

1. Addenda will be emailed to everyone on the Architect’s plan holders list that has requested access to the Construction Documents

2. Addenda can also be downloaded from: www.smithsinnett.com under the Documents Tab.

3. An addenda will be issued to address any questions raised today.

XII Bidders List:

1. Bidders List can be downloaded from www.smithsinnett.com under the Documents Tab.

XIII Owner Related Items:

1. Asbestos Air Monitoring, TEM Clearances and Final Acceptance of Hazardous Material Removal shall be Contracted by Owner. The Contractor is responsible for the coordination and cost of any failed test.

2. Building and Site will be occupied during construction. Coordination of onsite activities with the Owner is required. The roof replacement of the building shall be ongoing during the course of this project.

3. Existing Items to be Removed and Reinstalled by the Contractor include Casework as indicated on the Drawings and Loose Furniture.

XIV Special Conditions: Section 00 09 10

1. Project Manager Qualifications are a requirement for this project.

2. Superintendent Qualifications are a requirement for this project.

3. Coordination and Cooperation with Other Contractors: Prime Contractor shall be aware that the

Owner has or may engage other contractors to accomplish work concurrently with the Work of this project, which will have a direct effect on the accomplishment of the Work of this project.

Contractors will be required to cooperate and coordinate with these other contractors during the course of the project to avoid delays in the work of this project of that of the other contractors.

4. Underground Services: Prime Contractor and all subcontractors shall field locate all underground services whether shown on drawings or not, including, but not limited to the following: utilities, underground wire, fiber optic lines, cable, conduit, and pipe, prior to initiating any excavation on any area of the proposed site. Provide and pay for underground utility locator service, metal detectors and hand digging as necessary to satisfy above requirements. Prime Contractor (s) and their subcontractors shall be responsible for utility services damaged during construction and shall repair at their own expense any utility services damaged by their work. Repairs shall be completed within 24 hours or less.

Smith Sinnett Architecture, P.A. | 4600 Lake Boone Trail, Suite 205, Raleigh, North Carolina 27607 | HUB Certified 4

XV Project Specifics:

1. Base Bid:

a. This project consists of the hazardous materials abatement within the existing Main Building, approximately 72,697sqft for the Samarcand Training Academy for Safer Schools. As part of an alternate, hazardous materials will be abated from the adjacent classroom building of approximately 16,414sqft. Project is located at the old East Montgomery High School in Biscoe, NC. The scope of the existing Main Building shall consist of the abatement of asbestos floor tile, asbestos mastic, and asbestos ceiling tile. The scope of the abatement will require the demolition of some existing casework, remove and reinstall some existing casework, relocation of loose furniture, demolition of some temporary wood partition walls, capping of plumbing fixtures, and disconnecting of electrical outlets. The project includes all other work as shown, indicated or reasonably implied on the drawings and/or specifications for a complete, first class job.

2. Alternates:

a. Alternate No. 1: Classroom Building Hazardous Materials Abatement

3. Allowances:

a. Allowance No. 1: Remove Existing Asbestos Floor Tile and Mastic

i. 2,500sqft

4. Unit Prices:

a. Unit Price No. 1 – Remove Existing Asbestos Floor Tile and Mastic, per square foot.

END OF AGENDA

DN

GENERAL DEMOLITION NOTES:

1.

2.

3.

4.

ALL CONDITIONS SHALL BE FIELD VERIFIED BY THE CONTRACTOR WHERE DEMOLITION IS TO OCCUR. THE

CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY INCONSISTENCIES IN

WRITING PRIOR TO STARTING ANY WORK.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR WEEKLY AND/OR DAILY REMOVAL AND PROPER DISPOSAL

OF ALL DEBRIS ACCUMULATED DURING DEMOLITION AND CONSTRUCTION.

ANY FLOOR, CEILING, WALL OR OTHER MATERIALS INCLUDING FINISHES IN AREAS TO REMAIN ARE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT. ANY MATERIALS DAMAGED DURING CONSTRUCTION OR DEMOLITION, SHALL BE RETURNED TO THEIR ORIGINAL STATE, OR IMPROVED AS INDICATED BY THE OWNER OR ARCHITECT, OR REPLACED WITH A NEW MATERIAL TO MATCH ADJACENT MATERIALS, TYPICAL.

CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES TO REMAIN AND MATERIALS EXPOSED

TO VIEW WHERE OTHER ITEMS OR MATERIALS HAVE BEEN REMOVED.

5. DURING THE BIDDING PROCESS, CONTRACTORS SHALL TAKE NOTE OF EXISTING PLUMBING

MECHANICAL, AND ELECTRICAL ITEMS IN AREAS TO BE RENOVATED. ITEMS INCLUDE BUT ARE NOT LIMITED TO WIRES, CONDUITS, PIPES, THERMOSTATS, FIRE ALARM DEVICES, PANEL CANS, ETC. THESE HAVE BEEN IDENTIFIED IN THE DEMOLITION DRAWINGS FOR ARCHITECTURE. FOR ITEMS NOT SHOWN, CONTRACTOR SHALL WORK WITH THE ARCHITECT AND OWNER TO DETERMINE IF THE ITEM IS STILL IN USE ITEMS WHICH ARE NOTED TO BE REMOVED AND STORED FOR LATER REINSTALLATION SHALL BE

TAGGED AND LISTED ON AN ITEMIZED LIST GIVEN TO THE OWNER AND ARCHITECT.

6. THE GENERAL CONTRACTOR SHALL COORDINATE THE DEMOLITION OF THE EXISTING BUILDING AREAS WITH THE ARCHITECT AND OWNER. THE CONTRACTOR SHALL COORDINATE AFTER HOURS WORK AND

OBTAIN WRITTEN OWNER PERMISSION FOR NIGHT AND WEEKEND WORK.

7. CONTRACTOR SHALL ENSURE WATER-TIGHT INTEGRITY OF THE TEMPORARY ENCLOSURE SYSTEMS AND MAINTAIN THEM THROUGH THE ENTIRETY OF CONSTRUCTION TO PREVENT THE INTRUSION OF WATER AND

THE ELEMENTS INTO THE BUILDING.

8. ALL EXISTING FIRE EXTINGUISHER AND BRACKETS SHALL REMAIN AND BE INSTALLED IN THEIR CURRENT

LOCATION UNLESS SHOWN ON THE PLANS TO RELOCATE.

9. REMOVAL OF HAZARDOUS MATERIAL AND DEBRIS SHALL BE AS FOLLOWS:

A. ALL HAZARDOUS SHALL BE REMOVED BY THE CONTRACTOR PRIOR TO PROJECT

COMPLETION. CONTRACTOR SHALL FOLLOW ALL THE REQUIREMENTS TO LEGALLY

DISPOSE OF ALL HAZARDOUS MATERIALS.

B. THE CONTRACTOR IS REQUIRED TO PERFORM ABATEMENT AND REMEDIATION

ACTIVITIES INSIDE NEGATIVEAIR PRESSURIZED ENCLOSURES.

10. SQUARE FOOTAGES ARE GIVEN FOR REFERENCE. ACTUAL DIMENSIONS SHALL BE VERIFIED IN

THE FIELD. NO ALLOWANCES OR CHANGE ORDERS WILL BE GIVEN DUE TO THE ACCURACY OR

INACCURACY OF THE SQUARE FOOTAGES. CONTRACTOR IS TO VERIFY THE SQUARE

FOOTAGES.

11. ALL TEMPORARY WOOD WALL PARTITIONS SHOWN AS DASHED LINES OR LABELED SHALL BE

DEMOLISHED. ANY PLUMBING ASSOCIATED WITH THE EXISTING TEMPORARY WOOD WALL PARTITION SHALL BE REMOVED BACK TO MAIN AND CAPPED. ANY ELECTRICAL WITH ALL ASSOCIATED CONDUIT AND WIRING ASSOCIATED WITH THE TEMPORARY WOOD WALL PARTITION SHALL BE REMOVED BACK TO THE MAIN DISTRIBUTION PANEL AND CIRCUIT BREAKERS RELABELED AS "SPARE". CONTRACTOR SHALL PROVIDE ADEQUATE SHORING AND BRACING AND IS RESPONSIBLE FOR ANY FAILURE DUE TO LACK OF

PROPER BRACING.

12. ALL CASEWORK, SINKS, BASE CABINETS, SHELFS, COUNTERTOP STOVES, FUME HOODS, FUME HOOD CABINETS, PHENOLIC COUNTERTOPS AND BACKSPLASH SHOWN AS DASHED LINES OR LABELED SHALL BE REMOVED AND REINSTALLED IN THE SAME LOCATION BY THE CONTRACTOR UNLESS OTHERWISE NOTED.

ANY UTILITIES ASSOCIATED WITH SINKS, CASEWORK, BASE CABINETS, SHELFS, COUNTERTOP STOVES, FUME HOODS, FUME HOOD CABINETS, AND PHENOLIC COUNTERTOPS AND BACKSPLASH SHOWN AS

DASHED LINES OR LABELED SHALL BE REMOVED BACK TO MAIN AND CAPPED. ANY ELECTRICAL WITH ALL ASSOCIATED CONDUIT AND WIRING ASSOCIATED WITH ITEMS LISTED ABOVE SHALL BE REMOVED BACK TO THE MAIN DISTRIBUTION PANEL AND CIRCUIT BREAKERS RELABELED AS "SPARE". THE INTENT OF

REMOVAL AND REINSTALLATION OF SINKS, CASEWORK, BASE CABINETS, SHELFS, COUNTERTOP

STOVES, FUME HOODS, FUME HOOD CABINETS, PHENOLIC COUNTERTOPS AND BACKSPLASH SHALL BE TO KEEP THE VISUAL INTEGRITY OF SCHOOL SPACES AS THE FACILITIES ARE PRIMARILY TO BE USED FOR ACTIVE SHOOTER SIMULATION AND RESPONSE TRAINING BY THE NC DEPARTMENT OF PUBLIC SAFETY.

ANY UTILITIES ASSOCIATED WITH SINKS, CASEWORK, BASE CABINETS, SHELFS, COUNTERTOP STOVES, FUME HOODS, FUME HOOD CABINETS, AND PHENOLIC COUNTERTOPS AND BACKSPLASH SHOWN AS

DASHED LINES OR LABELED SHALL NOT BE RECONNECTED.

DEMOLITION LEGEND:

DESCRIPTIONSYMBOL

EXISTING TO REMAIN

NOTE THE PRESENCE OF ASBESTOS CONTAINING ITEMS. REFER TO THE PROJECT

MANUAL FOR HAZARDOUS MATERIAL REPORT.

EXISTING

COURTYARD

BA

SE

B

ID

AL

TE

RN

AT

E

BA

SE

B

ID

AL

TE

RN

AT

E

/ 2 A9 -0

/ 2 A9 -0

AL

TE

RN

AT

E

/ 2 A9 -0

AL

TE

RN

AT

E

/ 2 A9 -0

BA

SE

B

ID

BA

SE

B

ID

NOT IN SCOPE OF WORK

CAFETERIA

113 KITCHEN

INDUSTRIAL ARTS

103STORAGE

103A

GYMNASIUM

STORAGE

104A

INDUSTRIAL ARTS

SHOP

AGRICULTURAL SHOP

AG. CLASSROOM #1

OFFICE

STORAGE

AG. CLASSROOM #2

BOILER ROOM

VARSITY BOYS LOCKER

ROOM

STORAGE

BOYS LOCKER ROOM

GIRLS LOCKER ROOM

STORAGE

115 STORAGE

OFFICE

STORAGE

CORRIDOR

HOME EC

DRESS

HOME EC

PHYSICS

LAB

DARK RM.

MENS

CHEMISTRY

SCIENCE

LAB

BIOLOGY

WOMEN

CORR. 2

152LANGUAGE

STOR.

STAFF

STAFF

WORKROOM

MENS

STOR.

LANGUAGE

LANGUAGE

WORKROOM

OFFICE

STOR.

MENS

148 CONFERENCE

LANGUAGE

STOR.

WOMEN

SOCIAL STUDIES

SOCIAL STUDIES

BUSINESS

TYPING

WOMENS

CORRIDOR 1

SUITE

OFFICE

OFFICE

OFFICE

STOR.

OFFICE

163 OFFICE

Room

VICE PRINCIP

PRINCIPAL

TLT

TLT

STOR.

LOBBY

LOBBY

STORAGE

113B

STORAGE

113A

2 5

2 52 5

OFFICE

CLOSET

STOR.

52 5

TLT.

2 5

2 5

2 5

STRG.

205A

2 5

2 2 5

2 5

2 5

2 5

2 5

CLASSROOM

205B

UNIFORMS

205C

2 5

1412119

9 14

9 14

LIBRARY

9 9 9

UTILITIES ASSOCIATED WITH LOOSE

FURNITURE SHALL BE REMOVED BACK TO THE

MAIN DISTRIBUTION PANEL AND CIRCUIT

BREAKERS RELABELED AS "SPARE". TYPICAL

THROUGHOUT LIBRARY 205.

9 9

REMOVE SINK. ALL PIPING

ASSOCIATED WITH SINK SHALL

BE REMOVED BACK TO MAIN

AND CAPPED. CONTRACTOR

SHALL NOT REINSTALL SINK.

REMOVE SINK. ALL PIPING

ASSOCIATED WITH SINK SHALL

BE REMOVED BACK TO MAIN

AND CAPPED. CONTRACTOR

SHALL NOT REINSTALL SINK.

ADDENDUM 2

REVISION:

1. DEMO NOTE "9" ADDED

ADDENDUM 2

REVISION

1. DEMO NOTE "1" ADDED

BASE BID DEMOLITION KEYNOTES:

REMOVE EXISTING TEMPORARY WOOD WALL PARTITION, FRAMING, AND ASSOCIATED PARTS IN

ITS ENTIRETY. ASSOCIATED PARTS INCLUDE BUT NOT LIMITED TO DOOR, DOOR FRAME,

HARDWARE, TRACKS AND SUPPORTS. ANY PLUMBING ASSOCIATED WITH THE EXISTING

TEMPORARY WOOD WALL PARTITION SHALL BE REMOVED BACK TO MAIN AND CAPPED. ANY

ELECTRICAL WITH ALL ASSOCIATED CONDUIT AND WIRING ASSOCIATED WITH THE TEMPORARY

WOOD WALL PARTITION SHALL BE REMOVED BACK TO THE MAIN DISTRIBUTION PANEL AND

CIRCUIT BREAKERS RELABELED AS "SPARE". REFER TO HAZARDOUS MATERIAL DESIGN AND

ABATEMENT DOCUMENT IN PROJECT MANUAL.

REMOVE EXISTING BASE, CARPET, VCT, MASTIC AND/OR ANY OTHER FLOOR FINISH IN ITS

ENTIRETY. REFER TO ASBESTOS REMOVAL DESIGN AND SPECIFICATIONS FOR INSTRUCTIONS ON

ASBESTOS TILE AND MASTIC REMOVAL. REMOVAL OF HAZARDOUS MATERIALS DESIGN AND

ABATEMENT DOCUMENT IN THE PROJECT MANUAL.

REMOVE EXISTING LAY-IN CEILING TILE, GRID, HANGERS AND ASSOCIATED PARTS IN ITS

ENTIRETY. EXISTING LIGHT FIXTURES AND ALL ASSOCIATED CEILING DEVICES TO REMAIN.

REMOVAL OF HAZARDOUS MATERIALS DESIGN AND ABATEMENT DOCUMENT IN THE PROJECT

MANUAL.

REMOVE EXISTING CASEWORK, BASE CABINET, SHELF, OR WALL HUNG COUNTER IN ITS

ENTIRETY. THE CONTRACTOR SHALL LEGALLY DISPOSE OF THE CASEWORK, BASE CABINET,

SHELF, OR WALL HUNG COUNTER.

5 REMOVE EXISTING LOOSE FURNITURE AND STORE IN AN APPROVED LOCATION ON SITE BY THE

OWNER. LOOSE FURNITURE SHALL BE REINSTALLED BY THE CONTRACTOR.

REMOVE EXISTING LAY-IN CEILING TILE, GRID, HANGERS AND ASSOCIATED PARTS IN ITS

ENTIRETY. REMOVAL OF HAZARDOUS MATERIALS DESIGN AND ABATEMENT DOCUMENT IN THE

PROJECT MANUAL.

REMOVE EXISTING LIGHT FIXTURES. ANY ELECTRICAL WITH ALL ASSOCIATED CONDUIT AND

WIRING ASSOCIATED WITH THE LIGHT FIXTURES SHALL BE REMOVED BACK TO THE MAIN

DISTRIBUTION PANEL AND CIRCUIT BREAKERS RELABELED AS "SPARE". REFER TO GENERAL

DEMOLITION NOTES FOR REQUIREMENTS ON BULB AND BALLAST DISPOSAL.

REMOVE EXISTING CASEWORK, BASE CABINET, WALL HUNG COUNTER AND/OR SHELF AND STORE

IN AN APPROVED LOCATION ON SITE BY THE OWNER. EXISTING CASEWORK, BASE CABINET, WALL

HUNG COUNTER AND/OR SHELF SHALL BE REINSTALLED BY THE CONTRACTOR. IF CASEWORK,

BASE CABINET, WALL HUNG COUNTER, AND/OR SHELF IS DAMAGED AND/OR DESTROYED TO THE

EXTENT IT CANNOT BE REINSTALLED, CONTRACTOR SHALL LEGALLY DISPOSE OF ITEMS.

REMOVE EXISTING SINK AND STORE IN AN APPROVED LOCATION ON SITE BY THE OWNER. ALL

PIPING ASSOCIATED WITH SINK SHALL BE REMOVED BACK TO MAIN AND CAPPED. THE EXISTING

SINK SHALL BE REINSTALLED BY THE CONTRACTOR.

REMOVE EXISTING FUME HOOD AND STORE IN AN APPROVED LOCATION ON SITE BY THE OWNER.

ALL UTILITIES ASSOCIATED WITH FUME HOOD SHALL BE REMOVED BACK TO MAIN AND CAPPED.

ALL ELECTRICAL ASSOCIATED WITH FUME HOOD SHALL BE REMOVED BACK TO THE MAIN

DISTRIBUTION PANEL AND CIRCUIT BREAKERS RELABELED AS "SPARE". THE FUME HOOD SHALL

BE REINSTALLED BY THE CONTRACTOR. NO UTILITIES SHALL BE RECONNECTED.

REMOVE EXISTING FUME HOOD CABINET EQUIPMENT AND STORE IN AN APPROVED LOCATION ON

SITE BY THE OWNER. ANY UTILITIES ASSOCIATED WITH EXISTING FUME HOOD CABINET SHALL BE

REMOVED BACK TO MAIN AND CAPPED. ALL ELECTRICAL ASSOCIATED WITH FUME HOOD SHALL

BE REMOVED BACK TO THE MAIN DISTRIBUTION PANEL AND CIRCUIT BREAKERS RELABELED AS

"SPARE". THE FUME HOOD CABINET SHALL BE REINSTALLED BY THE CONTRACTOR.

REMOVE EXISTING ELECTRICAL OUTLETS WITH ALL ASSOCIATED CONDUIT AND WIRING

ASSOCIATED WITH THE ELECTRICAL OUTLETS SHALL BE REMOVED BACK TO THE MAIN

DISTRIBUTION PANEL AND CIRCUIT BREAKERS RELABELED AS "SPARE"

REMOVE EXISTING COUNTERTOP STOVE AND STORE IN AN APPROVED LOCATION ON SITE BY

THE OWNER. ANY ELECTRICAL ASSOCIATED WITH COUNTERTOP STOVE SHALL BE REMOVED

BACK TO THE MAIN DISTRIBUTION PANEL AND CIRCUIT BREAKERS RELABELED AS "SPARE". THE

COUNTERTOP STOVE SHALL BE REINSTALLED BY THE CONTRACTOR.

REMOVE EXISTING PHENOLIC COUNTERTOP AND BACKSPLASH AND STORE IN AN APPROVED

LOCATION ON SITE BY THE OWNER. THE PHENOLIC COUNTERTOP AND BACKSPLASH SHALL BE

REINSTALLED BY THE CONTRACTOR. DRAWN BY:

CHECKED BY:

DESCRIPTIONDATEID

SC

O 2- 2- C

T 919 781 8582 F 919 781 3979 4600 Lake Boone Trail Suite 205 Raleigh, NC 27607 info@smithsinnett.com

Th is dra win g a nd th e d es ign sh ow n i s t he pro pe rty of Sm ith Si nn ett Ar ch ite ctu re, P.A . t he re pro du cti on or us e o f th is pro pe rty w ith ou t th e w ritt en co ns en t o f th e

Ar ch ite ct is pro hib ite d.

An y i nfr ing em en t of the ow ne rsh ip rig hts w ill b e s ub jec t to leg al ac tio n.

Al l c op ies of th is dra win g mu st be re tur ne d t o t he Ar ch ite ct at the co mp let ion of th e c on tra ct.

Sm ith Si nn ett Ar ch ite ctu re, P.

A.

TH

IS

DR

AW

IN

G

IS

FO

RM

AT

TE

D

TO

BE

PR

IN

TE

D

ON

A " X " S

HE

ET

\\s sa -c or e0 2\ Pr oj ec ts \2 E as t M on tg om er y Sa fe r S ch oo ls T ra in in g Ac ad em y\ 2- D ra w in gs \R ev it\

- P ha se C la ss ro om B ui ld in g an d Ad m in is tra tio n Bu ild in g

R en ov at io n\ 2_ Sa m ar ca nd M ai n Bu ild in g R en ov at io n_ Ph as e 3_ R .rv t

2/2 8/2 5 1 2:0 0:1 4 P M

A0-01

MAIN BUILDING -

DEMOLITION PLAN

2022022 28 FEB. 2025

FA

RC

NO

RT

H

CA

RO

LI

NA

D

EP

AR

TM

EN

T

OF

P

UB

LI

C

SA

FE

TY

SA

MA

RC

AN

D

TR

AI

NI

NG

A

CA

DE

MY

S

IM

UL

AT

IO

N

BU

IL

DI

NG

H

AZ

AR

DO

US

M

AT

ER

IA

LS

A

BA

TE

ME

NT

EA

G

LE

L

A N

E, B

IS

C

O E, N C

BI

D

DO

CU

ME

NT

S

REGISTERED

AR

CH

IT

EC

TU

RA

L C

ORPO

RAT ION

NO

RT

H

CA

RO

LI

NA

AR

CH

ITE

CTU

,PA

RA

LE

IG

H

CE

RT

. N O.

RE

SIN

ET

T

N

SMIHT

1/16" = 1'-0"A0-01

1 MAIN BUILDING - OVERALL DEMOLITION PLAN

0 8' 16' 32' 64'

1 02/28/2025 Addendum 21 02/28/2025 Addendum 2

Addendum 2_Samarcand Hazardous Material_22-25242-01C_Drawings.pdf
A0-01 - MAIN BUILDING - DEMOLITION PLAN

File details come from the government source that posted it. Updated .