This is a construction document set for dredging work at Hammocks Beach State Park, prepared by the North Carolina Department of Natural and Cultural Resources, Division of Parks and Recreation. The project involves dredging approximately 42,000 cubic yards of material from the Cow Channel at Bear Island in Swansboro, NC (SCO Number 06-06920-03A), with the dredged material to be deposited on the Bear Island beachfront for beach renourishment. The dredging work extends approximately 5,750 linear feet from Station 24+50 to Station 82+00, with material placement spanning approximately 2,700 linear feet along the Bear Island Service Road. The channel is to be dredged to a depth of 8 feet below mean lower low water with an allowable over-depth of one foot. The construction documents, dated April 20, 2026, include comprehensive plan views, cross-sections at multiple stations, and typical details for channel markers and tide gauges. All elevations are referenced to mean lower low water and are based on bathymetric survey data from October 22, 2024.
The project requires the contractor to establish all necessary lines and grades, perform pre- and post-dredging bathymetric surveys for acceptance and payment, and manage dredge material placement with special attention to the beach access stairs and ramps. The dredging permit is being obtained by the owner (Department of Natural and Cultural Resources), while the contractor is responsible for all other permit requirements, navigational notices, and necessary approvals. The construction documents include detailed specifications for channel markers with reflective sign boards, tide gauges installed at each side of the channel, and provisions for a temporary berm and tapered transition zone to integrate the beach fill with existing conditions. Beneficial material placement is prioritized at the beach access location until design elevations are achieved, after which remaining material is distributed along the adjacent shoreline as directed. The project is presented as a rebid opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAMMOCKS BEACH STATE PARK
COW CHANNEL DREDGING
DEPARTMENT OF NATURAL AND CULTURAL RESOURCES
DIVISION OF PARKS AND RECREATION
HAMMOCKS BEACH STATE PARK
SWANSBORO, NC
NC SCO NUMBER: 06-06920-03A
CONSTRUCTION DOCUMENTS
PROJECT
LOCATION
BEAR ISLAND
BEACHFRONT
COW CHANNEL
HAMMOCKS
BEACH STATE
PARK VISITOR
CENTER
00+00
24+50
82+00
LEGEND
DREDGE MATERIAL TO BE DEPOSITED ON
BEAR ISLAND BEACHFRONT. 5750 LIN FT,
APPROX 42,000 CUBIC YARDS.
APPROX 2700 LIN FT FROM FERRY LANDING
SITE TO BEAR ISLAND BEACHFRONT
ALONG BEAR ISLAND SERVICE ROAD.
E
A
S E A L
23591
INEAL W.
TR
N ENG
R
P
O N
SS
OF
E
H
AC
ER
ND
IL
ER W
NIONA
L
A
RO
S E A L
C-2461
OAR
N O
C
RTH L I
N A
CO
RPOR TA E
AN
D R E W C O N S
UL
T ING ENG
IN
E E R S ,P .C
DESIGNED BY:
CHECKED BY:
DRAWN BY:
C O
P Y
R
IG
H T
A
L L R
IG
H
T S
R E
S E
R V
E D
P R
IN
T
E D
O R
E L E
C T
R O
N
IC
D R
A W
IN
G
S A
N D
D O
C U
M E
N T
A T
IO
N
M A
Y N
O T
B E
R E
P R
O D
U C
E D
I N
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N F
R O
M A
N D
R E
W C
O N
S U
L T
IN
G
E N
G
IN
E E
R S
P
.C
B
C
D
A
B
C
D
A
3 2 14
3 2 14
REVISIONS:
ORIGINAL ISSUE DATE:
A C
E P
R O
J E
C T
N U
M B
E R
S C
O N
U M
B E
R
-0
-0
A
COVER SHEET
G-001
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
C O
W C
H A
N N
E L D
R E
D G
IN
G
D E
P A
R T
M E
N T
O F
N A
T U
R A
L A
N D
C U
L T
U R
A L
R E
S O
U R
C E
S D
IV
IS
IO
N
O F
P A
R K
S A
N D
R E
C R
E A
T
IO
N
CGE
NWA
JMR
CONSTRUCTION DOCUMENTS
04/20/2026
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
S W
A N
S B
O R
O
N C
N
SHEET INDEX
SHEET NUMBER SHEET NAME
G-001 COVER SHEET
C-101 COW CHANNEL DREDGING PLAN VIEWS
C-102 BEAR ISLAND BEACHFRONT PLAN AND PROFILE VIEW
C-301 CHANNEL CROSS SECTIONS
C-302 CHANNEL CROSS SECTIONS
C-303 CHANNEL CROSS SECTIONS
C-304 CHANNEL CROSS SECTIONS
C-501 TYPICAL DETAILS
NOT TO SCALE
PROJECT LOCATION MAP
NOT TO SCALE
PROJECT SITE MAP
N
REV DATE NOTE
CD 04/20/26 CONSTRUCTION DOCUMENTS
Docusign Envelope ID: D7AD7688-BF6E-8D7A-82CE-0D1DB2474C50
6/8/2026
I N T R A C O A S T A L W A T E R W A Y
1.1
2.7
9.4
5.6
7.4
3.6
7.9
6.8
7.7
7.9
8.3
8.2
7.1
6.9
6.3
5.3
5.4
6.5
7.9
8.4
4.8
3.1
10.8
11.5
9.8
7.8
5.0
8.9
9.9 3.8
8.4 11.6
10.4
9.3
10.1
4.8
8.4
5.1
1.8
9.5 6.9
6.3
10.2
8.5
5.2
3.5
8.7
2.8
3.3
3.3
3.7
3.9
4.6
5.5
5.8
6.2
6.1
3.7
1.8
1.6
6.8
10.2
11.5
5.4
9.8 10.7
8.6
5.6
12.1
10.0
3.9
8.8
2.3 12.0
9.3
11.1
7.0
10.0
3.9
6.6
9.5 3.7
8.1
5.1
3.0
11.4
10.2
9.1
7.4
6.2
3.2
2.6
1.3
5.2
7.9
9.9
10.6
9.5
3.7
6.6
9.9 1.9
4.7 11.0
9.1
3.6
8.8
7.010.2
11.2 10.0
11.2
6.7
11.6
12.8
8.8
11.5
2.4
8.6
2.0
12.5
11.7
8.3
1.9
5.2
10.2
13.8
4.4
9.3
9.9
10.4 15.3
15.1
14.8
12.5
13.4
13.3
14.2
14.5
3.1 2.4
9.5 9.4
5.7 3.6
9.0
4.9 4.6
1.2
1.1
7.8
11.0
12.1
7.6
12.2
1.7
1.1
2.7
5.6
7.9
1.8
3.5
6.8
7.7
7.9
8.3
8.2
7.1
6.9
6.3
5.3
5.4
6.5
7.9
8.4
4.8
3.1
1.5 3.0
5.0 7.0
4.2
4.9
5.5
3.2
3.4 3.9
5.9
2.8
5.8
1.1
5.2
5.9 5.7
1.1
1.7 3.8
4.9 5.1
3.7 3.8
6.0
5.0
0.8
5.9
4.1 3.7
5.3
7.2
6.2
4.1
3.3
3.3
6.2
7.4
2.7
3.7
3.9
4.6
5.5
5.8
6.2
6.1
3.7
1.8
5.3 5.4
3.2
5.5
2.0 2.4
5.9
7.1
0.3
5.5
3.9 5.0
1.7 3.8
4.9 5.1
3.7
3.0
5.9
3.8
6.0 5.9
4.1 3.7
2.8
3.0
0.2
7.4 4.6
9.0
5.9
9.2
9.7
5.4
2.7 3.8
7.3
0.8
7.1
7.5
7.8
6.4 6.1
3.2 1.6
1.4
5.3
4.0
7.6
7.1
7.9
7.8
7.4 8.7
10.2
9.9
8.3
2.6
8.0
6.7
3.13.2 4.9
7.5 7.6
4.7
5.9
7.2
3.5
5.0 7.1
6.2 7.0
2.8 1.9
4.9
2.2
8.3 7.6
9.3 9.0
1.6
9.8
8.9
3.4
10.5
12.6
2.7
11.6
1.3 1.2
4.5
2.6
2.2
3.0
4.2
0.7
0.9
2.2
2.6 3.9
4.4
3.6
3.3
1.7
2.3
1.5
-0.1 E
2.6
2.7
1.8
1.4
0.6
-0.9
2.0
1.4-0.1
0.6 2.4
2.7 1.0
0.9
1.2
3.7
2.1
4.9
7.4
9.3
-0.4
6.3
5.7 2.5
9.9
9.0
9.5
6.5
5.2
-0.7
2.0 -0.3
8.4
2.7
7.9
6.3
13.6
5.5 7.8
0.9
5.3
0.7 4.7
0.7 4.2
6.1 2.3
3.2
3.6
-0.5
-0.6
1.0
2.2
1.8
0.5
1.1 3.0
5.712.6
9.3
3.5
1.2
4.2
6.7
9.2 4.8
0.6 6.4
0.1
12.5
7.2 9.0
7.4 2.3
5.4
6.6
7.6
7.9
9.5
4.6
6.9
8.6
7.8 3.4
7.4 8.2
9.1
3.1
8.1
8.5
8.3
6.1
4.0
10.2
9.9
8.6
7.4
3.8
7.2
7.3
10.0
0.7
9.3 9.1
10.2
6.0
0.1
6.0
5.0
5.2
2.5
9.0
6.8
3.2
5.8
6.6
2.0
3.2
2.6 1.8
2.0
4.5 4.2
0.7
0.9
1.8
0.7-0.1
COW CHANNEL, TYP
+0
CHANNEL
CENTER LINE
+0
+0
15+00
16+00
17+00
CC MARKER
SHADED AREA
NOT IN SCOPE
APPROXIMATE START OF
HYDRAULIC DREDGING WITHIN
CHANNEL. LOCATION SHOWN
IS APPROXIMATE AND FOR
REFERENCE ONLY.
CHANNEL
CENTER LINE
8+
CHANNEL
CENTER LINE
9+
0+
1+
2+
3+
ATTACH TIDAL GAUGES
TO EACH SIDE OF
CHANNEL MARKER 14
B1
C-101
C2
C-101
D2
C-101
BATHYMETRIC INFORMATION AND DREDGE QUANTITIES
ARE BASED ON NC DOT SURVEY DATED OCTOBER 22, 2024.
ALL ELEVATIONS ARE RELATIVE TO MEAN LOWER LOW WATER.
CL
CHANNEL
25' - 0" 25' - 0"
50' - 0"
MEAN LOWER LOW WATER
1. DREDGING WORK TO COMMENCE AT STA 24+50 AND THEN CONTINUE TOWARDS STA 82+00.
2. ESTIMATED VOLUME OF DREDGE MATERIAL = 42,000 CUBIC YARDS.
ESTIMATED DREDGE AREA = 598,000 SQUARE FEET.
3. ALL DREDGING SHALL BE PERFORMED WITHIN THE LIMITS OF THE PERMITTED DREDGE AREA AS
SHOWN TO DEPTH OF -8'-0" MLLW WITH AN ALLOWABLE OVER-DEPTH OF ONE FOOT.
4. ALL LINES AND GRADES NECESSARY FOR ACCOMPLISHING THE WORK SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR. PRE-DREDGING AND POST-DREDGING BATHYMETRIC
SURVEYS FOR ACCEPTANCE AND PAYMENT SHALL BE PERFORMED IN ACCORDANCE WITH
SECTION 312000 OF THE PROJECT MANUAL.
5. DREDGE AND PLACEMENT PERMIT IS BEING OBTAINED BY THE OWNER. THE CONTRACTOR IS
RESPONSIBLE FOR ALL OTHER REQUIREMENTS FOR PERMITS, NAVIGATIONAL NOTICES,
APPROVALS, ETC.
DREDGING NOTES
NAVD88 2.08'
MHW 3.25'
MLW 0.15'
MLLW 0.00'
MHHW 3.54'
STND -1.84' STATION DATUM:
DUKE MARINE LAB
BEAUFORT, NC
STATION ID: 8656483
NORTH AMERICAN
VERTICAL DATUM OF 1988
-1
-2
-3
MSL 1.71'
CHANNEL MARKER LEGEND
NEW CHANNEL MARKERS
EXISTING CHANNEL MARKERS
FERRY DOCK
BEAR
ISLAND
COW
CHANNEL
105' - 0" +/-
LIMITS OF
DREDGING
COASTAL
WETLAND LINE
SHORELINE
+00
31' - 0" +/-
EXISTING LIVING
SHORELINE
STABILIZATION
EXISTING LIVING
SHORELINE
STABILIZATION
E
A
S E A L
23591
INEAL W.
TR
N ENG
R
P
O N
SS
OF
E
H
AC
ER
ND
IL
ER W
NIONA
L
A
RO
S E A L
C-2461
OAR
N O
C
RTH L I
N A
CO
RPOR TA E
AN
D R E W C O N S
UL
T ING ENG
IN
E E R S ,P .C
DESIGNED BY:
CHECKED BY:
DRAWN BY:
C O
P Y
R
IG
H T
A
L L R
IG
H
T S
R E
S E
R V
E D
P R
IN
T
E D
O R
E L E
C T
R O
N
IC
D R
A W
IN
G
S A
N D
D O
C U
M E
N T
A T
IO
N
M A
Y N
O T
B E
R E
P R
O D
U C
E D
I N
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N F
R O
M A
N D
R E
W C
O N
S U
L T
IN
G
E N
G
IN
E E
R S
P
.C
B
C
D
A
B
C
D
A
3 2 14
3 2 14
REVISIONS:
ORIGINAL ISSUE DATE:
A C
E P
R O
J E
C T
N U
M B
E R
S C
O N
U M
B E
R
-0
-0
A
COW CHANNEL
DREDGING PLAN
VIEWS
C-101
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
C O
W C
H A
N N
E L D
R E
D G
IN
G
D E
P A
R T
M E
N T
O F
N A
T U
R A
L A
N D
C U
L T
U R
A L
R E
S O
U R
C E
S D
IV
IS
IO
N
O F
P A
R K
S A
N D
R E
C R
E A
T
IO
N
CGE
NWA
JMR
CONSTRUCTION DOCUMENTS
04/20/2026
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
S W
A N
S B
O R
O
N C
1" = 200'-0" C2
ENLARGED COW CHANNEL PLAN
N
1" = 200'-0" D2
ENLARGED COW CHANNEL PLAN
1" = 400'-0" A1
OVERALL COW CHANNEL PLAN
N
N
NOT TO SCALE
C1
TYPICAL NEW CHANNEL SECTION
VERTICAL DATUM CHART
1" = 40'-0" B1
BEAR ISLAND FERRY DOCK PLAN
N
REV DATE NOTE
CD 04/20/26 CONSTRUCTION DOCUMENTS
MLW 0.0'
2'-0"
4.0'
6.0'
8.0'
10.0'
12.0'
14.0'
16.0'
-2.0'
MHW 3.10'
MLW 0.0'
2'-0"
4.0'
6.0'
8.0'
10.0'
12.0'
14.0'
16.0'
-2.0'
MHW 3.10'
0.0' 10.0' 20.0' 30.0' 40.0' 50.0' 60.0' 70.0' 80.0' 90.0' 100.0' 110.0' 120.0'-10.0'-20.0'
EXISTING SAND
ON BEACH
EXISTING
SAND DUNES
PRIOR TO PLACEMENT OF SEDIMENT
A TEMPORARY BERM SHALL BE
CONSTRUCTED BY CONTRACTOR
PROPOSED MEAN
HIGH WATER LINE
SEDIMENT
FROM DREDGING
TAPERED TRANSITION
BEYOND HIGH TIDE
LINE MADE FROM
DEMOLISHED BERM
1:16 SLOPE
PROVIDE A TRANSITION TAPER ZONE EXTENDING A MINIMUM OF 200 FEET
FROM THE END OF THE BEACH FILL TO MATCH THE ADJACENT EXISTING
BEACH PROFILE. FINAL GRADE SHALL FEATHER EVENLY INTO THE
EXISTING SLOPE AND BERM ELEVATION WITHOUT ABRUPT CHANGES.
1:5 SLOPE
PROPOSED MEAN
LOW WATER LINE
EXISTING MEAN
LOW WATER LINE
EXISTING MEAN
HIGH WATER LINE
BUFFER
30' - 0"
AEC OFFSET
75' - 0"
BUFFER
30' - 0"
SEDIMENT
RENOURISHMENT AREA
SPECIAL ATTENTION WILL
BE MADE TO REPLENISH
MATERIAL ADJACENT TO
BEACH ACCESS STAIRS
AND RAMPS
A4
C-102
BEAR ISLAND SERVICE ROAD.
PLACE DREDGE PIPE ON
EASTERN EDGE OF ROAD.
DO NOT IMPEDE USE OF
ROADWAY.
RESTROOM BUILDING
AND BEACH ACCESS
STAIR AND RAMP
BEAR
ISLAND
1500' (+/-)
1500' (+/-)
'-0
FERRY DOCK
DREDGE PUMP
STAGING AREA
PROPOSED MEAN
LOW WATER LINE
PROPOSED MEAN
HIGH WATER LINE
EXISTING MEAN
HIGH WATER LINE
EXISTING MEAN
LOW WATER LINE
BEACH
ACCESS
C3
C-102
C4
C-102
B4
C-102
9 FT APPROX
E
A
S E A L
23591
INEAL W.
TR
N ENG
R
P
O N
SS
OF
E
H
AC
ER
ND
IL
ER W
NIONA
L
A
RO
S E A L
C-2461
OAR
N O
C
RTH L I
N A
CO
RPOR TA E
AN
D R E W C O N S
UL
T ING ENG
IN
E E R S ,P .C
DESIGNED BY:
CHECKED BY:
DRAWN BY:
C O
P Y
R
IG
H T
A
L L R
IG
H
T S
R E
S E
R V
E D
P R
IN
T
E D
O R
E L E
C T
R O
N
IC
D R
A W
IN
G
S A
N D
D O
C U
M E
N T
A T
IO
N
M A
Y N
O T
B E
R E
P R
O D
U C
E D
I N
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N F
R O
M A
N D
R E
W C
O N
S U
L T
IN
G
E N
G
IN
E E
R S
P
.C
B
C
D
A
B
C
D
A
3 2 14
3 2 14
REVISIONS:
ORIGINAL ISSUE DATE:
A C
E P
R O
J E
C T
N U
M B
E R
S C
O N
U M
B E
R
-0
-0
A
BEAR ISLAND
BEACHFRONT PLAN
AND PROFILE VIEW
C-102
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
C O
W C
H A
N N
E L D
R E
D G
IN
G
D E
P A
R T
M E
N T
O F
N A
T U
R A
L A
N D
C U
L T
U R
A L
R E
S O
U R
C E
S D
IV
IS
IO
N
O F
P A
R K
S A
N D
R E
C R
E A
T
IO
N
CGE
NWA
JMR
CONSTRUCTION DOCUMENTS
04/20/2026
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
S W
A N
S B
O R
O
N C
HORIZONTAL SCALE:
VERTICAL SCALE: 1/4" = 1'-0"
1/8" = 1'-0" A4
BEAR ISLAND BEACH PROFILE VIEW
NOT TO SCALE
B2
BEAR ISLAND PLAN
N
CONSTRUCTION NOTES:
1. PLACE BENEFICIAL MATERIAL CENTERED AT THE BEACH ACCESS STAIRS AND RAMP. MATERIAL PLACEMENT AT THIS LOCATION SHALL BE PRIORITIZED UNTIL PROPOSED DESIGN ELEVATIONS
ARE ACHIEVED. UPON ACHIEVING REQUIRED ELEVATIONS, DISTRIBUTE REMAINING BENEFICIAL MATERIAL EAST AND WEST ALONG THE ADJACENT SHORELINE AS DIRECTED.
2. ACCESS BEACH VIA DESIGNATED ACCESS ROAD ONLY. DO NOT DISTURB DUNES OR VEGETATION. ANY DUNES OR VEGETATION DISTURBED DURING CONSTRUCTION SHALL BE REPAIRED AND
RESTORED TO PRE-CONSTRUCTION CONDITIONS.
C3
PHOTO OF BEACH ACCESS LOOKING WEST
C4
PHOTO OF BEACH ACCESS LOOKING EAST
3" = 1'-0" B4
PHOTO OF BEACH ACCESS LOOKING SOUTH
REV DATE NOTE
CD 04/20/26 CONSTRUCTION DOCUMENTS
EXISTING CHANNEL BOTTOM
DREDGING LEGEND
NEW CHANNEL PROFILE
DREDGE MATERIAL TO BE DEPOSITED ON
BEAR ISLAND BEACH
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 5'
ALL ELEVATIONS ARE RELATIVE TO MEAN LOWER LOW WATER
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 25+00
STA 26+00
STA 29+00
STA 28+00
STA 27+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 30+00
STA 31+00
STA 32+00
STA 33+00
STA 34+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 37+00
STA 36+00
STA 35+00
STA 38+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 24+50
-50'
-50'
50'
50'
E
A
S E A L
23591
INEAL W.
TR
N ENG
R
P
O N
SS
OF
E
H
AC
ER
ND
IL
ER W
NIONA
L
A
RO
S E A L
C-2461
OAR
N O
C
RTH L I
N A
CO
RPOR TA E
AN
D R E W C O N S
UL
T ING ENG
IN
E E R S ,P .C
DESIGNED BY:
CHECKED BY:
DRAWN BY:
C O
P Y
R
IG
H T
A
L L R
IG
H
T S
R E
S E
R V
E D
P R
IN
T
E D
O R
E L E
C T
R O
N
IC
D R
A W
IN
G
S A
N D
D O
C U
M E
N T
A T
IO
N
M A
Y N
O T
B E
R E
P R
O D
U C
E D
I N
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N F
R O
M A
N D
R E
W C
O N
S U
L T
IN
G
E N
G
IN
E E
R S
P
.C
B
C
D
A
B
C
D
A
3 2 14
3 2 14
REVISIONS:
ORIGINAL ISSUE DATE:
A C
E P
R O
J E
C T
N U
M B
E R
S C
O N
U M
B E
R
-0
-0
A
CHANNEL CROSS
SECTIONS
C-301
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
C O
W C
H A
N N
E L D
R E
D G
IN
G
D E
P A
R T
M E
N T
O F
N A
T U
R A
L A
N D
C U
L T
U R
A L
R E
S O
U R
C E
S D
IV
IS
IO
N
O F
P A
R K
S A
N D
R E
C R
E A
T
IO
N
CGE
NWA
JMR
CONSTRUCTION DOCUMENTS
04/20/2026
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
S W
A N
S B
O R
O
N C
REV DATE NOTE
CD 04/20/26 CONSTRUCTION DOCUMENTS
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 40+00
STA 41+00
STA 44+00
STA 43+00
STA 42+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 45+00
STA 46+00
STA 47+00
STA 48+00
STA 49+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 52+00
STA 51+00
STA 50+00
STA 53+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 39+00
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 54+00
-50'
-50'
50'
50'
E
A
S E A L
23591
INEAL W.
TR
N ENG
R
P
O N
SS
OF
E
H
AC
ER
ND
IL
ER W
NIONA
L
A
RO
S E A L
C-2461
OAR
N O
C
RTH L I
N A
CO
RPOR TA E
AN
D R E W C O N S
UL
T ING ENG
IN
E E R S ,P .C
DESIGNED BY:
CHECKED BY:
DRAWN BY:
C O
P Y
R
IG
H T
A
L L R
IG
H
T S
R E
S E
R V
E D
P R
IN
T
E D
O R
E L E
C T
R O
N
IC
D R
A W
IN
G
S A
N D
D O
C U
M E
N T
A T
IO
N
M A
Y N
O T
B E
R E
P R
O D
U C
E D
I N
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N F
R O
M A
N D
R E
W C
O N
S U
L T
IN
G
E N
G
IN
E E
R S
P
.C
B
C
D
A
B
C
D
A
3 2 14
3 2 14
REVISIONS:
ORIGINAL ISSUE DATE:
A C
E P
R O
J E
C T
N U
M B
E R
S C
O N
U M
B E
R
-0
-0
A
CHANNEL CROSS
SECTIONS
C-302
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
C O
W C
H A
N N
E L D
R E
D G
IN
G
D E
P A
R T
M E
N T
O F
N A
T U
R A
L A
N D
C U
L T
U R
A L
R E
S O
U R
C E
S D
IV
IS
IO
N
O F
P A
R K
S A
N D
R E
C R
E A
T
IO
N
CGE
NWA
JMR
CONSTRUCTION DOCUMENTS
04/20/2026
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
S W
A N
S B
O R
O
N C
REV DATE NOTE
CD 04/20/26 CONSTRUCTION DOCUMENTS
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 55+00
STA 56+00
STA 59+00
STA 58+00
STA 57+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 60+00
STA 61+00
STA 62+00
STA 63+00
STA 64+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 67+00
STA 66+00
STA 65+00
STA 68+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 70+00
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 69+00
-50'
-50'
50'
50'
E
A
S E A L
23591
INEAL W.
TR
N ENG
R
P
O N
SS
OF
E
H
AC
ER
ND
IL
ER W
NIONA
L
A
RO
S E A L
C-2461
OAR
N O
C
RTH L I
N A
CO
RPOR TA E
AN
D R E W C O N S
UL
T ING ENG
IN
E E R S ,P .C
DESIGNED BY:
CHECKED BY:
DRAWN BY:
C O
P Y
R
IG
H T
A
L L R
IG
H
T S
R E
S E
R V
E D
P R
IN
T
E D
O R
E L E
C T
R O
N
IC
D R
A W
IN
G
S A
N D
D O
C U
M E
N T
A T
IO
N
M A
Y N
O T
B E
R E
P R
O D
U C
E D
I N
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N F
R O
M A
N D
R E
W C
O N
S U
L T
IN
G
E N
G
IN
E E
R S
P
.C
B
C
D
A
B
C
D
A
3 2 14
3 2 14
REVISIONS:
ORIGINAL ISSUE DATE:
A C
E P
R O
J E
C T
N U
M B
E R
S C
O N
U M
B E
R
-0
-0
A
CHANNEL CROSS
SECTIONS
C-303
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
C O
W C
H A
N N
E L D
R E
D G
IN
G
D E
P A
R T
M E
N T
O F
N A
T U
R A
L A
N D
C U
L T
U R
A L
R E
S O
U R
C E
S D
IV
IS
IO
N
O F
P A
R K
S A
N D
R E
C R
E A
T
IO
N
CGE
NWA
JMR
CONSTRUCTION DOCUMENTS
04/20/2026
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
S W
A N
S B
O R
O
N C
REV DATE NOTE
CD 04/20/26 CONSTRUCTION DOCUMENTS
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 71+00
STA 74+00
STA 73+00
STA 72+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 76+00
STA 77+00
STA 78+00
STA 79+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 75+00
-50'
-50'
50'
50'
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
0' 0'
-4' -4'
-8' -8'
-12' -12'
-16' -16'
CL
CHANNEL-100' 100'
-100' 100'CL
CHANNEL
STA 82+00
STA 81+00
STA 80+00
-50'
-50'
50'
50'
-50'
-50'
50'
50'
-50'
-50'
50'
50'
DREDGE
BEYOND
CUT VOLUME (CU YDS)STATION ACCUMULATED VOLUME (CU YDS)
DREDGE VOLUME TABLE
25+00
27+00
28+00
30+00
31+00
32+00
33+00
34+00
35+00
29+00
37+00
38+00
39+00
40+00
41+00
43+00
44+00
45+00
46+00
47+00
48+00
42+00
36+00
49+00
50+00
52+00
53+00
54+00
55+00
56+00
57+00
51+00
59+00
60+00
61+00
62+00
63+00
65+00
66+00
67+00
68+00
69+00
70+00
64+00
58+00
71+00
72+00
74+00
75+00
76+00
77+00
78+00
79+00
73+00
81+00
82+00
80+00
10376
11431
12441
13370
14107
14598
14968
15456
16071
16703
17138
17235
17235
17235
17519
17841
18382
18989
19553
20000
20090
20091
20091
20123
20223
20382
20909
22054
23580
25277
26587
27694
28814
30069
31039
31300
31314
31314
31435
32604
34143
36261
38129
39389
39389
40512
42000
26+00 958 1838
24+50 0 0
E
A
S E A L
23591
INEAL W.
TR
N ENG
R
P
O N
SS
OF
E
H
AC
ER
ND
IL
ER W
NIONA
L
A
RO
S E A L
C-2461
OAR
N O
C
RTH L I
N A
CO
RPOR TA E
AN
D R E W C O N S
UL
T ING ENG
IN
E E R S ,P .C
DESIGNED BY:
CHECKED BY:
DRAWN BY:
C O
P Y
R
IG
H T
A
L L R
IG
H
T S
R E
S E
R V
E D
P R
IN
T
E D
O R
E L E
C T
R O
N
IC
D R
A W
IN
G
S A
N D
D O
C U
M E
N T
A T
IO
N
M A
Y N
O T
B E
R E
P R
O D
U C
E D
I N
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N F
R O
M A
N D
R E
W C
O N
S U
L T
IN
G
E N
G
IN
E E
R S
P
.C
B
C
D
A
B
C
D
A
3 2 14
3 2 14
REVISIONS:
ORIGINAL ISSUE DATE:
A C
E P
R O
J E
C T
N U
M B
E R
S C
O N
U M
B E
R
-0
-0
A
CHANNEL CROSS
SECTIONS
C-304
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
C O
W C
H A
N N
E L D
R E
D G
IN
G
D E
P A
R T
M E
N T
O F
N A
T U
R A
L A
N D
C U
L T
U R
A L
R E
S O
U R
C E
S D
IV
IS
IO
N
O F
P A
R K
S A
N D
R E
C R
E A
T
IO
N
CGE
NWA
JMR
CONSTRUCTION DOCUMENTS
04/20/2026
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
S W
A N
S B
O R
O
N C
REV DATE NOTE
CD 04/20/26 CONSTRUCTION DOCUMENTS
(4) 5/8" DIA THROUGH BOLTS
E M
B E
D M
E N
T V
A R
IE
S
12" DIA TIMBER PILE
3' - 0"
PVC PILE CAP
1/2" WHITE "ALUMALITE"
ALUMINUM SIGN BOARD
W/ SCOTCHAL TRANSLUCENT
RED GRAPHIC FILM BY 3M
2" RED REFLECTIVE
BORDER
12" RED REFLECTIVE
NUMBER
MEAN HIGH WATER
BOTTOM SURFACE
EAST SIDE OF CHANNEL WEST SIDE OF CHANNEL
1/2" WHITE "ALUMALITE"
ALUMINUM SIGN BOARD
W/ SCOTCHAL TRANSLUCENT
GREEN GRAPHIC FILM BY 3M
2" GREEN REFLECTIVE
BORDER
12" GREEN REFLECTIVE
NUMBER
4' - 0"
4'
3'
2'
1'
0'
-1'
-2'
-3'
-4'
PT 2X10 X 10'-0" LONG
4" NUMBERING IN BLACK
WATERPROOF PAINT
PAINT TIDE GAUGE
YELLOW WITH CORROSIVE
INHIBITOR PAINT
MEAN SEA LEVEL
E
A
S E A L
23591
INEAL W.
TR
N ENG
R
P
O N
SS
OF
E
H
AC
ER
ND
IL
ER W
NIONA
L
A
RO
S E A L
C-2461
OAR
N O
C
RTH L I
N A
CO
RPOR TA E
AN
D R E W C O N S
UL
T ING ENG
IN
E E R S ,P .C
DESIGNED BY:
CHECKED BY:
DRAWN BY:
C O
P Y
R
IG
H T
A
L L R
IG
H
T S
R E
S E
R V
E D
P R
IN
T
E D
O R
E L E
C T
R O
N
IC
D R
A W
IN
G
S A
N D
D O
C U
M E
N T
A T
IO
N
M A
Y N
O T
B E
R E
P R
O D
U C
E D
I N
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N F
R O
M A
N D
R E
W C
O N
S U
L T
IN
G
E N
G
IN
E E
R S
P
.C
B
C
D
A
B
C
D
A
3 2 14
3 2 14
REVISIONS:
ORIGINAL ISSUE DATE:
A C
E P
R O
J E
C T
N U
M B
E R
S C
O N
U M
B E
R
-0
-0
A
TYPICAL DETAILS
C-501
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
C O
W C
H A
N N
E L D
R E
D G
IN
G
D E
P A
R T
M E
N T
O F
N A
T U
R A
L A
N D
C U
L T
U R
A L
R E
S O
U R
C E
S D
IV
IS
IO
N
O F
P A
R K
S A
N D
R E
C R
E A
T
IO
N
CGE
NWA
JMR
CONSTRUCTION DOCUMENTS
04/20/2026
H A
M M
O C
K S
B E
A C
H S
T A
T E
P A
R K
S W
A N
S B
O R
O
N C
1/2" = 1'-0" A2
CHANNEL MARKER DETAIL
3/4" = 1'-0" A3
TIDE GAUGE DETAIL
REV DATE NOTE
CD 04/20/26 CONSTRUCTION DOCUMENTS
| Sheets |
| C-101 - COW CHANNEL DREDGING PLAN VIEWS |
| C-102 - BEAR ISLAND BEACHFRONT PLAN AND PROFILE VIEW |
| C-301 - CHANNEL CROSS SECTIONS |
| C-302 - CHANNEL CROSS SECTIONS |
| C-303 - CHANNEL CROSS SECTIONS |
| C-304 - CHANNEL CROSS SECTIONS |
| C-501 - TYPICAL DETAILS |
| G-001 - COVER SHEET |
| 2026-06-08T07:09:59-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |