This document contains a pricing schedule for aviation maintenance services for the USCGC Escanaba (WMEC-270B). The schedule lists various maintenance, inspection, and testing items to be performed on the vessel's aviation systems and equipment. Pricing is provided per item as both unit prices and extended totals. Additional over and above or growth work is also estimated at a labor rate of $370 per hour and a material markup percentage of [percentage quoted].

The related federal contract opportunity is solicitation number 70Z08024QMECP0009 for dockside repairs of the USCGC Escanaba in fiscal year 2024 to be awarded by the Department of Homeland Security's United States Coast Guard. Pricing and item details in the schedule correspond to the maintenance and repair requirements specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to CGC ESCANABA DS FY24, newest first.
File Type Posted
Specification_ESCANABA DS FY24.pdf PDF
70Z08024QMECP0009_ESCANABA DS FY24.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC ESCANABA (WMEC-270B) AVIATION AVAILABILITY FY2024
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Tanks, Aviation Fuel Service, Clean And InspectJOB1
D-002Tanks, Aviation Fuel Stowage And Overflow, Clean And InspectJOB1
D-00328 Volt DC Helo Power Supply, Load TestJOB1
D-004400 Hz Power Supply (FCX Systems Inc), Load TestJOB1
D-005Windspeed Transmitter, Anemometer, RenewJOB1
D-006Flow Meter (Aviation Fuel), CalibrateJOB1
D-007Helo Talon Grids, Inspect and TestJOB1
D-008Decks, Helicopter Operating Areas, PreserveJOB1
D-009Helo Hanger Door, RenewJOB1
D-00AGFP Report
D-00BTravel and Perdiem
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
tOver and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
OA/G-001**Provide breakdown, as follows:

Over and Above/Growth Labor Rate

Unit Price: $ ________; Quantity: 370 ; Unit of Issue: Hour; Extended Price: $___________Hour370
OA/G-002Over and Above/Growth Material Markup/Handling Fee

Unit Price: $50,000.00; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$50,000.00 X percentage quoted]: $______________$50,000.00%
Total Price of Over and Above/Growth