Schedule of Prices_VIGILANT.xls
XLS spreadsheet 42 KB Posted
- Attached to
- CGC VIGILANT DS FY26
- Solicitation number
- 70Z08025QMECP0025
About this file
The file is a Schedule of Prices for the United States Coast Guard Cutter (USCGC) VIGILANT (WMEC-210A) Dockside Availability for Fiscal Year 2026. The detailed pricing schedule includes 24 line items for various maintenance and preservation tasks, such as cleaning and inspecting chain lockers, fuel tanks, water tanks, and various mechanical components. All definitive items are currently priced at $0.00, with a composite labor rate of 788 hours and provisions for potential over and above/growth work.
The contract opportunity is solicited by the Department of Homeland Security US Coast Guard, with solicitation number 70Z08025QMECP0025. The pricing schedule includes placeholders for contractors to fill in Over and Above/Growth Labor Rate and Material Markup/Handling Fee, with a draft date of 4/29/2025. The document allows for potential additional work through contract modifications, with labor rates and material markup fees to be applied to any future scope expansions. The total evaluated price will include both definitive and optional items, with the ability to adjust for growth work as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08025QMECP0025_VIGILANT DS FY26.pdf | ||
| SPECIFICATION_VIGILANT DS FY26.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC VIGILANT (WMEC-210A) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Chain Lockers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-002 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | $0.00 | |
| D-005 | Voids, Accessible, Clean and Inspect | JOB | 1 | $0.00 | |
| D-006 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | $0.00 | |
| D-007 | Propulsion Shafting, Strain Gauge Alignment, Dockside, Check | JOB | 1 | $0.00 | |
| D-008 | Vent Ducts, Galley, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-009 | Vent Ducts, Laundry Exhaust, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-010 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| D-011 | Towing Bitts, Chocks, and Fairleads; Inspect and Test | JOB | 1 | $0.00 | |
| O-012 | Chain Lockers, Preserve, Partial | JOB | 1 | $0.00 | |
| D-013 | Ammunition Elevator, Service and Inspect | JOB | 1 | $0.00 | |
| D-014 | Temporary Services, Heating and Cooling | JOB | 1 | $0.00 | |
| O-015 | Tanks, Dirty Oil and Waste, Preserve, Partial, | JOB | 1 | $0.00 | |
| D-016 | Vent Ducts, Engine Room, Commercial Cleaning | JOB | 1 | $0.00 | |
| O-017 | Tanks, Potable Water Preserve, 100 Percent | JOB | 1 | $0.00 | |
| D-018 | Reduction Gear Lube Oil Strainer Assembly, Replace | JOB | 1 | $0.00 | |
| D-019 | Deck Connection Riser, Renew | JOB | 1 | $0.00 | |
| D-020 | Deck Plating, Renew | JOB | 1 | $0.00 | |
| D-021 | Ballast Valve and Associated Components, Renew | JOB | 1 | $0.00 | |
| D-022 | Piping Insulation, Renew | JOB | 1 | $0.00 | |
| D-023 | Sounding Tubes, Renew | JOB | 1 | $0.00 | |
| D-024 | Potable Water Tank TLI Brackets, Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 788 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate________ | Hour | 788 | ||
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee___________ | $30,397.00 | % | ||
| Total Evaluated Price of Over and Above/Growth |
&C(4/29/2025) Draft-0 - Page &P of &N
File details come from the government source that posted it. Updated .