This document contains a schedule of items for the Houston Ranger Station Drainage Project being conducted by the USDA Forest Service Mark Twain National Forest. The project involves improvements to drainage at the Houston Ranger Station administration site and includes items such as removal of existing structures, excavation and backfill of trenches, installation of a reinforced concrete waterway with aggregate base, and a trench drain system with geotextile and stone. Estimated quantities and unit costs are provided for each work item. The related federal contract opportunity is solicitation number 12445523Q0125 for drainage improvements at the Mark Twain National Forest Houston administration site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Houston RD Drainage Plans.pdf | ||
| mo1.txt | TXT text file | |
| 12445523Q0125 SF 1442.pdf | ||
| 12445523Q0125 RFQ Houston Site.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Houston Ranger Station Drainage Project
| USDA – Forest Service |
| Schedule of Items |
Houston Ranger Station Drainage Improvements FY22 Houston/Rolla Ranger District Mark Twain National Forest Texas County, Missouri
| ITEM NUMBER |
| DESCRIPTION |
| METHOD OF MEASURE |
| PAY UNIT |
| ESTIMATED QUANTITY |
| UNIT COST |
| SUBTOTAL |
| 15101 |
| Mobilization |
| CQ |
| LPSM |
| 1 |
| 20301 |
| Removal of Structures - sawing, demo, and disposal of concrete and asphalt. |
| CQ |
| LPSM |
| 1 |
| 20901 |
| Structure Excavation & Backfill – Trench Drain Excavation. |
| CQ |
| LF |
| 130 |
| 30201 |
| Minor Crushed Aggregate – 4” Type B Subbase for Waterway. |
| CQ |
| TON |
| 12 |
| 50101 |
| Minor Concrete Pavement – |
8” Reinforced Waterway.
| CQ |
| SQYD |
| 64 |
| 60501 |
| Underdrains & Pavement Edge Drains – Trench Drain System (including geotextile, revet rock & 2” clean stone cap) |
| CQ |
| LF |
| 130 |
| 63501-0000 |
| Temporary Traffic Control |
| CQ |
| LPSM |
| 1 |
ITEM TOTAL: _________________________________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
All items are design quantities; no payment will be made for variations within +/-15% of the design quantity, without a CO approved modification.
The contractors bid price shall include all necessary material, equipment, and labor to complete construction of project. Material shall include all components for installation according to manufacturer specification’s and/or FP-14 Standard Specifications for Construction.
Incidental to Mobilization is moving shed, and grade surveying.
Contractor is responsible for hauling off site any excess material occurred during project.
Contractor is responsible for actual measurements for quantities.
Contractor shall contact 1-800-DIG-RITE and obtain any applicable State or Federal permits needed.
Contractor is responsible for all traffic control according with MUTCD regulations.
Governing specifications: FP-14 (available https://flh.fhwa.dot.gov/resources/specs/), Forest Service Supplement Specifications 2017.
Houston Ranger Station Drainage Project SOI 1 image1.jpeg