Schedule of Items.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Pine Canyon Water System (FC07-R5 Multi-Forest Crit Water System Repair
Solicitation number
127EAX21Q0074
Issued by

View the file

Other files

File Type Posted
127EAX21Q0074 8.18.21a.pdf PDF
WD CA20200018.pdf PDF
127EAX21Q0074 8.18.21.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITEM NO. DESCRIPTION QUANTITY M OF M PAY UNIT UNIT PRICE TOTAL ($)

Schedule of Items
Pine Canyon Water System Upgrades 4/25/2021
11900Mobilization/DemobilizationALLLSQLS$$
13340-APrecast Concrete Utitlity Building Installation, Siteprep, utility rough in w/in 10'LSQLS$$
221120-AWell Head UpgradesALLLSQLS$$
221120-bWell Casing Liner Installation271.00AQLF$$
221100-A1.5" HDPE Waterline Installation140.00AQLF$$
221100-B1.5" Curb Valve and Box Installation4.00AQEA$$
221100-C3" HDPE Waterline Installation80.00AQLF$$
221100-D3" Curb Valve and Box Installation7.00AQEA$$
221100-E3" & 1.5" HDPE Waterline In Shared Trench610.00AQLF$$
221103-ATie In to Existing TanksALLLSLSQ$$
221103-BNew Service Connection2.00AQEA$$
221103-CDaylight Drain Installation1.00AQEA$$
221103-DWell Modification and Water System Consruction Permit Coordination1.00AQEA$$
221103-EUtitlity Building PlumbingALLLSQLS$$
260500-AUtility Building FeederALLLSQLS$$
260500-BUtitlity Building ElectricalALLLSQLS$$
Option Items
221103-FHydrant InstallationALLLSQLS$$
221103-GWater Tanker Fill Station Assembly InstallationALLLSQLS$$
321216-AAsphalt Paving Resurfacing900.00AQSF$$
221100-GHorizontal Drilling300.00AQLF$$