Schedule of Items and Statement of Work.pdf
PDF 200 KB Posted
- Attached to
- USDA Forest Service Beaverhead-Deerlodge National Forest, Copper Creek and Springhill Cabin Well Drilling
- Solicitation number
- 1240LU25Q0088
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a solicitation for well drilling services for the Beaverhead-Deerlodge National Forest in Montana. The project involves drilling two drinking water wells at two separate locations: Copper Creek Campground (located 26 miles southwest of Philipsburg) and Springhill Cabin (located 9 miles west of Anaconda). The solicitation includes a detailed schedule of items with specific measurements for well construction tasks such as sanitary sealing, drilling, casing installation, well development, and mobilization. The project's estimated construction magnitude is between $25,000 and $100,000, with a required completion date of October 31, 2025. Contractors will work between 8:00 a.m. and 5:00 p.m., excluding weekends and federal holidays, and must comply with all applicable laws, obtain necessary permits, and maintain a clean work area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LU25Q0088.pdf | ||
| 1240LU25Q0088 P0001.pdf | ||
| Sections D - M.pdf | ||
| Deerlodge County Wage Determination.pdf | ||
| Granite County Wage Determination.pdf | ||
| 1240LU25Q0088.pdf | ||
| SECTION 01010 SUMMARY OF WORK.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Copper Creek Campground and Springhill Cabin Wells Pintler Ranger District
Beaverhead-Deerlodge NF Granite and Deerlodge Counties, Montana
B – SUPPLIES OR SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS
Bid Item
Description Method of Measurement
Unit Est.
Qty
Unit Price
Total Price
Copper Creek Campground Well
1 Sanitary Seal, 10” AQ Linear Foot
2 Drilling, 6” with casing AQ Linear Foot
3 Well Construction: install screen AQ Hour 2
4 Well Development AQ Hour 1
5 Move/Set up AQ Hour 2
6 Abandon Well AQ Linear Foot
7 Casing, 6” steel AQ Linear Foot
8 Screen, 6” Stainless Steel AQ Linear Foot
9 Drive Shoe, 10” AQ Each 1
10 Drive Shoe, 6” AQ Each 1
11 Bentonite Chips AQ Bag 8
12 Disinfection LSQ 1
13 Mobilization/Inter Mobilization LSQ 1
Springhill Cabin Well
14 Sanitary Seal, 10” AQ Linear Foot
15 Drilling, 6” with casing AQ Linear Foot
16 Well Construction: install screen AQ Hour 2
17 Well Development AQ Hour 1
18 Move/Set up AQ Hour 2
19 Abandon Well AQ Linear Foot
20 Casing, 6” steel AQ Linear Foot
21 Screen, 6” Stainless Steel AQ Linear Foot
22 Drive Shoe, 10” AQ Each 1
23 Drive Shoe, 6” AQ Each 1
24 Bentonite Chips AQ Bag 8
25 Disinfection LSQ 1
26 Mobilization/Inter Mobilization LSQ 1
Total Quote =_______________
SECTION C—DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 - PROJECT DESCRIPTION AND LOCATION
(a) Scope of Contract. The work of this contract consists of drilling two (2) drinking water wells at two locations on the Beaverhead-Deerlodge National Forest. Furnish all labor, materials, equipment, supervision, and transportation necessary to complete the work as specified.
(b) Project Locations.
a. Copper Creek Campground:
i. The proposed well drilling site is at the Copper Creek Campground, located on
Forest Road 80 approximately 26 miles southwest of Philipsburg, MT. Latitude 46.066977, longitude -113.539053.
b. Springhill Cabin:
i. The proposed well drilling site is at the Springhill Cabin, located on Montana
Highway 1 approximately 9 miles west of Anaconda, MT. Latitude 46.169732, longitude -113.158041.
(c) Disclosure of the magnitude of construction. Between $25,000 and $100,000
(d) Information. Parties with questions may contact Josh Lattin, (406) 362-7011.
(e) Pre-Quote Tour. There will be no pre-quote tour of the site. Interested parties may arrange a site visit by calling Josh Lattin, (406) 362-7011.
(f) Period of Performance. Work shall be completed no later than October 31, 2025.
(g) Work Schedule . Working hours for the Contractor will be between the hours of 8:00 a.m.
and 5:00 p.m., excluding Saturdays, Sundays and Federal Holidays.
C-2 GENERAL SPECIFICATIONS
(a) Contractors Responsibilities. The Contractor shall comply with all applicable laws, ordinances, safety codes, regulations, orders and decrees. The Contractor shall be responsible for all damages to persons or property that occur as a result of the actions of the Contractor, all subcontractors, and all employees or agents of the Contractor or subcontractors.
(b) Protection of Government Property. The Contractor shall take all necessary precautions to prevent damage to government property. All damage shall be repaired at the Contractor’s expense.
(c) Cleanup. Maintain the project work area in a clean and orderly condition throughout the progress of work under this contract. Upon completing the work, the Contractor shall remove from the work and premises any rubbish, tools, equipment, and materials that are not the property of the Forest Service. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the C.O.
(d) Materials and Workmanship. All materials and workmanship shall meet all applicable Federal, State, and local regulations and codes.
(e) Permits and Inspections. The contractor will obtain all necessary permits, arrange and coordinate all needed inspections, and pay for all necessary permits and inspections.
C-3 PROJECT SPECIFICATIONS
The following specifications are a part of this solicitation and any resultant contract and are attached.
01010 Summary of Work 15120 Wells
B – SUPPLIES OR SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS