SCHEDULE
| CLIN |
| Description |
| Qty |
| Unit |
| Unit Price |
| Total Price |
| 0001 |
| In accordance with the Statement of Work –Hull repairs and renew bottom paint system on NRT Fernandina Beach vessel (S3009). Upon delivery of the vessel to the vendor's facility, vendor will remove the engines and the moon pool adapter plug; clean the hull and strip the existing paint. A Marine Chemist will certify the bilge in the vicinity of the corrosion pits is gas free and safe for hot work. Grind |
the corrosion pits to remove oxides, chlorides, and other contaminants. Plug weld the pits with MIG or TIG; grind the weld smooth and verify welds are free of porosity. Then blast the hull and moon pool adapter plug to a near white metal condition to prepare the surfaces. Apply barrier coats, antifouling coats, and anti-corrosion coats per the SOW. Reinstall the engines. Place the boat back on the trailer.
| 0002 |
| In accordance with the Statement of Work – Purchase and install an impressed current active cathodic protection system. System consists of two (2) ceramic coated titanium anodes, a reference cell, controller and monitor display. |