Schedule.docx

DOCX document 15 KB Posted

Attached to
NOAA Vessel – Seattle (S3006) Bottom Paint & Cathodic Protection
Solicitation number
1305M223QNCNJ0483
Issued by

View the file

Other files

File Type Posted
SF-30 Amendment 0002.doc DOC document
SF-30 Amendment 0001.doc DOC document
S3006 Bottom Paint_SOW.docx DOCX document
OPEN MARKET CONTRACT CLAUSES.docx DOCX document
Wage Determination 2015-5535 - Rev 19.pdf PDF
NRT_Boat_Drawings_Lake Assault Boats.pdf PDF
RFQ.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE

CLIN
Description
Qty
Unit
Unit Price
Total Price
0001
In accordance with the Statement of Work – Upon delivery of the vessel to the vendor’s facility, vendor will remove the engines and the moon pool adapter plug; clean the hull and strip the existing paint; then blast the hull and moon pool adapter to a near white metal condition to prepare the surfaces. Apply barrier coats, antifouling coast, and anti-corrosion coats per the Statement of Work. Reinstall the engines. Place the boat back on the trailer.
1
EA
$
$
0002
In accordance with the Statement of Work – Purchase and install an impressed current active cathodic protection system. System consists of two (2) ceramic coated titanium anodes, a reference cell, controller and monitor display.
1
EA
$
$