Schedule B - Pricing Matrix.docx
DOCX document 35 KB Posted
- Solicitation number
- RFP 591 180000001041 1
- Issued by
- Alger County, Michigan
About this file
This is a Pricing Matrix Schedule B for a Request For Proposal issued by the State of Michigan Department of Labor and Economic Opportunity for MIOSHA (Silica Standard Compliant) Concrete Repair Equipment (RFP No. 180000001041). The pricing matrix requests quotes for concrete demolition and dust collection equipment, including three 60 lb. equivalent concrete breakers with wheeled carts, three HEPA-filtered vacuums with 5-10 gallon capacity and hose attachments, chisels in both pointed and flat configurations for the breakers and 15 lb. equivalent chipping hammers, a rock drill compatible with the vacuum system, and rock drill bits in multiple sizes. Contractors must submit pricing schedules in a modifiable format such as Microsoft Word or Excel, with an optional non-modifiable PDF version, and failure to complete the pricing schedule as specified may result in proposal disqualification.
All costs must be included in the pricing proposal, encompassing one-time charges, setup fees, shipping and handling, per-piece pricing, and palletizing expenses. Contractors are encouraged to offer quick payment terms with a specified discount percentage if invoices are paid within a stated number of days after receipt. By submitting a proposal, the contractor certifies that all prices were developed independently without consultation or agreement with other contractors, ensuring fair and competitive bidding. The document does not specify response deadlines, award dates, contract terms, or renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule A - Commodities and Non-Prof Services TABLE FORMAT.docx | DOCX document | |
| Proposal Instructions and Vendor Questions Worksheet.docx | DOCX document | |
| Standard Contract Terms.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enter company name here.
STATE OF MICHIGAN
Request For Proposal No. 180000001041 MIOSHA (Silica Standard Compliant) Concrete Repair Equipment
SCHEDULE B
PRICING MATRIX
1. The Contractor must provide a pricing schedule for the proposed Contract Activities using Microsoft Word. The pricing schedule should be submitted in a modifiable format (e.g. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.
2. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
3. The Contractor is encouraged to offer quick payment terms. The number of days must not include processing time for payment to be received by the Contractor's financial institution.
Quick payment terms: ________ % discount off invoice if paid within ________ days after receipt of invoice.
4. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
Requested Quantity
Description
Price per item
Total Estimate
60 lb. equivalent concrete breakers complete
Wheeled carts for concrete breakers
HEPA Filtered (5-10 Gal. capacity) automatic self-cleaning vacuums w/hose attachments complete for supplied equipment
Dust collection bags for vacuums listed above
Pointed chisels for 60 lb. equivalent concrete breakers
Flat chisels for 60 lb. equivalent concrete breakers
15 lb. equivalent chipping hammers complete. (Compatible with supplied vacuum system for 60 lb. breakers listed above.)
Pointed chisels for 15 lb. equivalent chipping hammers
Flat chisels for 15 lb. equivalent chipping hammers
Rock drill (compatible with supplied vacuum system for 60 lb. breakers listed above).
14” x ½” rock drill bit (compatible with rock drill listed above).
14” x 5/8” rock drill bit (compatible with rock drill listed above).
14” x ¾” rock drill bit (compatible with rock drill listed above).
Version 1 Revised Date: 7/28/2017
File details come from the government source that posted it. Updated .