Schedule B - Pricing 260000002529.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- RFP 591 260000002529 1
- Issued by
- Berrien County, Michigan
About this file
This is a Schedule B Pricing document for Request for Proposal No. 260000002529 issued by the Michigan Department of Transportation (MDOT) for HMA Milling & Paving work on M-59 Ramps at Squirrel Road in Oakland County. The project encompasses multiple work categories including hot mix asphalt (HMA) milling and paving, pavement markings, and traffic control devices. The scope includes 1,450 tons of HMA 5EML, 11,500 square yards of cold milling, 100 square yards of HMA patching, 25 tons of hand paving, on-site project management, and quality control testing. Pavement marking work includes various thermoplastic and reflective paint applications totaling over 14,000 linear feet of markings, along with symbol overlays. Traffic control equipment consists of 25 Type III barricades, 800 square feet of Type B prismatic signage, three portable changeable message signs, 150 plastic drums, and two lighted arrow devices. A traffic plan is available for bidder review via Google Earth.
Contractors must submit unit prices for all 32 line items in the provided Excel spreadsheet format, with pricing to include all costs such as setup charges, fees, and incidental expenses. Quantities listed are estimates only, and the State is not obliged to purchase in the specified quantities. The pricing schedule may be supplemented with an additional non-modifiable format document. Contractors certify that prices were developed independently without consultation or agreement with other bidders. Failure to complete the pricing schedule as requested may result in proposal disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 260000002529 M-59 Squirrel Rd Ramps.docx | DOCX document | |
| Attachment 1 - Prevailing Wage Information & Rates for Oakland County.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contractor must enter company name here. |
| SCHEDULE B - PRICING |
| Request for Proposal (RFP) No. 260000002529 |
HMA Milling & Paving – M-59 Ramps at Squirrel Rd, Oakland County
1. The Contractor must provide a price proposal for the Contract Activities using the PRICE SCHEDULE table below. The price schedule must be submitted in this spreadsheet format (Excel or Sheets); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.
2. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
3. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
| PRICE SCHEDULE |
| MDOT’s traffic plan may be viewed in the Google Earth map at |
https://earth.google.com/earth/d/1W9HH2hDHJT8ocvXQPe6S3j-tazYhcRTE?usp=sharing.
Quantities listed are estimates only; the State is not obliged to purchase in these or any other quantities.
Bidder must enter price quote in Unit Price column
| LINE # | PAY ITEM DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL PRICE |
| 1 | HMA, 5EML | Ton | 1,450 | $0.00 | |
| 2 | Cold Milling HMA Surface | Syd | 11,500 | $0.00 | |
| 3 | HMA Patch, Rem | Syd | 100 | $0.00 | |
| 4 | Hand Paving | Ton | 25 | $0.00 | |
| 5 | On Site Project Manager | Day | 1 | $0.00 | |
| 6 | QC Testing | Day | 1 | $0.00 | |
| 7 | Pavement Edge Restoration | Syd | 700 | $0.00 | |
| Total HMA Mill and Pave (Line 1 to Line 7) | $0.00 | ||||
| 8 | Shoulder Line Corrugation, Mill | Ft | 200 | $0.00 | |
| 9 | Pavt Mrkg, Ovly Cold Plastic, Straight Arrow Sym, Ramp Lane Size | Ea | 1 | $0.00 | |
| 10 | Pavt Mrkg, Ovly Cold Plastic, Thru Arrow Sym | Ea | 1 | $0.00 | |
| 11 | Pavt Mrkg, Ovly Cold Plastic, Rt Turn Arrow Sym | Ea | 2 | $0.00 | |
| 12 | Pavt Mrkg, Ovly Cold Plastic, ONLY Sym | Ea | 2 | $0.00 | |
| 13 | Pavt Mrkg, Sprayable Thermopl, 6 inch, White | Ft | 4,000 | $0.00 | |
| 14 | Pavt Mrkg, Sprayable Thermopl, 6 inch, Yellow | Ft | 3,000 | $0.00 | |
| 15 | Pavt Mrkg, Sprayable Thermopl, 12 inch, White | Ft | 400 | $0.00 | |
| 16 | Pavt Mrkg, Wet Reflective, Type NR, Paint, 6inch, White, Temp | Ft | 4,000 | $0.00 | |
| 17 | Pavt Mrkg, Wet Reflective, Type NR, Paint 6inch, Yellow, Temp | Ft | 3,000 | $0.00 | |
| 18 | Pavt Mrkg, Wet Reflective, Type NR Paint 12inch, White, Temp | Ft | 400 | $0.00 | |
| Total Pavement Markings (Line 8 to Line 18) | $0.00 | ||||
| 19 | Barricade, Type III, Furn | Ea | 25 | $0.00 | |
| 20 | Barricade, Type III, Oper | Ea | 25 | $0.00 | |
| 21 | Minor Traffic Devices | LSUM | 1 | $0.00 | |
| 22 | Sign, Type B, Prismatic, Furn | Sft | 800 | $0.00 | |
| 23 | Sign, Type B, Prismatic, Oper | Sft | 800 | $0.00 | |
| 24 | Sign, Type B, Prismatic, Special, Furn | Sft | 25 | $0.00 | |
| 25 | Sign, Type B, Prismatic, Special, Oper | Sft | 25 | $0.00 | |
| 26 | PCMS, Message Board, Furn | Ea | 3 | $0.00 | |
| 27 | PCMS, Message Board, Oper | Ea | 3 | $0.00 | |
| 28 | Plastic Drums, Furn | Ea | 150 | $0.00 | |
| 29 | Plastic Drums, Oper | Ea | 150 | $0.00 | |
| 30 | Lighted Arrow, Type C, Furn | Ea | 2 | $0.00 | |
| 31 | Lighted Arrow, Type C, Oper | Ea | 2 | $0.00 | |
| 32 | Sign Cover | Ea | 12 | $0.00 | |
| Total Traffic Control Devices (Lines19 though 32) | $0.00 | ||||
| GRAND TOTAL | $0.00 |