Schedule B_aluminum plank.docx
DOCX document 64 KB Posted
- Attached to
- EXTRUDED ALUMINUM FOR HIGHWAY SIGNS
- Solicitation number
- RFP 591 220000002539 1
- Issued by
- Grand Traverse County, Lansing City, Michigan
About this file
This is a Schedule B pricing document for a Request for Proposal issued by the State of Michigan through Michigan.gov/MiProcurement for extruded aluminum products used in highway signs. The procurement seeks pricing for two items: 250 units of 12" x 30' extruded aluminum sign sections with holes punched at 12" on center, and 40 units of 6" x 30' extruded aluminum sign sections with the same specifications. Both items must conform to ASTM B 221 alloy 6063-T6 standards and comply with 2020 MDOT Standard Specifications for Construction 919.02 and Table 919-2. The materials are intended for column-supported, butt-type edge applications in highway signage.
Contractors must submit pricing proposals in modifiable format (Microsoft Word or Excel) that include all costs associated with the contract activities, including one-time charges, setup fees, shipping, handling, per-piece pricing, and palletizing. Contractors are encouraged to offer quick payment discount terms expressed as a percentage discount off invoice if payment is received within a specified number of days after invoice receipt. Contractors must certify that all pricing was developed independently without consultation or agreement with competing contractors. RFP number 220000002539 is the reference identifier for this procurement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx | DOCX document | |
| standard_contract_terms_aluminum plank (003).docx | DOCX document | |
| Schedule A bidder box_aluminum plank_v1.2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
DOCUMENT TITLE Michigan.gov/MiProcurement Enter company name here
SCHEDULE B PRICING
Request For Proposal No. 220000002539 Extruded Aluminum for Highway Signs
1. The Contractor must provide a pricing schedule for the proposed Contract Activities using Microsoft Word. The pricing schedule should be submitted in a modifiable format (e.g. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.
2. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
3. The Contractor is encouraged to offer quick payment terms. The number of days must not include processing time for payment to be received by the Contractor's financial institution.
Quick payment terms: _____% discount off invoice if paid within _____ days after receipt of invoice.
4. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
Item
Commodity ID
Description
U/M
Unit Price Estimated Annual Usage
Sign Section: Extruded Aluminum with ½” x ¾” holes punched at 12” on center along length of section; column supported; butt-type edge; extruded aluminum of alloy 6063 – T6, conforming to ASTM B 221; in compliance with 2020 MDOT Standard Specifications for Constructions 919.02 and Table 919-2 Size: 12” x 30’ with holes punched
EA
Sign Section: Extruded Aluminum with ½” x ¾” holes punched at 12” on center along length of section; column supported; butt-type edge; extruded aluminum of alloy 6063 -T6, conforming to ASTM B 221; in compliance with 2020 MDOTFA Standard Specifications for Construction 919.02 and Table 919-2 Size: 6” x 30’ with holes punched
EA
Version 2021-1 Page 2 of 2
1 Revision Date: 10/2018 image1.png
File details come from the government source that posted it. Updated .