This is a bid form schedule for erosion repairs at Colorado Springs Airport (COS), submitted as part of a state and local contract opportunity with the State of Colorado. The project addresses permanent repair solutions to erosion damage caused by high-intensity rainfall events during spring and early summer 2023. The bid form is organized into six distinct project areas: Pond 2, Pond 4, Pond 5, Pond 7, Deice Apron West, and Deice Apron East. Work items across all sites include safety and temporary items, contractor quality control programs, mobilization, clearing and grubbing, excavation, embankment work, riprap removal and installation, geotextile placement, steel sheet piling, soil retention blankets, seeding, topsoil replacement, hydraulic mulching, drainage infrastructure, and concrete headwall installation. Estimated quantities vary significantly by location, with Pond 4 representing the largest scope including 23,380 cubic yards of excavation, 22,610 square yards of soil retention blanket, and 42,350 square yards of hydraulic mulching, while smaller scopes such as Pond 7 involve more limited quantities across similar work categories.

The bid form presents line items with estimated quantities and unit prices, with all unit prices and extended prices currently blank, indicating this is an incomplete bidding document requiring contractor pricing input. All line items are listed with established unit of measure designations (lump sum, linear feet, square feet, square yards, acres, cubic yards, each, and others) and specific CDOT and industry-standard specification references. Total prices for each work area and a grand total price for all sites are included at the bottom of the form but remain blank pending contractor bid submission. The document does not specify pricing terms, payment schedules, set-asides, incumbent information, funding sources, or other financial requirements within the visible content of this particular bid form schedule.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

SCHEDULE A - BID FORM
B25-090 CA - COS AIRPORT Erosion Repairs Package 2
BID ITEM NO.ITEM NO.ITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICEEXTENDED PRICE
POND 2
P2-1G-100-4.1SAFETY, SECURITY, AND TEMPORARY ITEMSLS1$ - 0
P2-2C-100-14.1CONTRACTOR QUALITY CONTROL PROGRAM (CQCP)LS1$ - 0
P2-3C-102-5.1INSTALLATION AND REMOVAL OF INLET AND OUTLET PROTECTIONEA1$ - 0
P2-4C-102-5.2EROSION CONTROL LOGLF220$ - 0
P2-5C-105-6.1MOBILIZATIONLS1$ - 0
P2-6P-101-5.1REMOVAL OF WALLSF280$ - 0
P2-7P-101-5.2RIPRAP REMOVALSY385$ - 0
P2-8P-151-4.1CLEARING AND GRUBBINGAC0.50$ - 0
P2-9P-152-4.1UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)CY1,440$ - 0
P2-10P-152-4.2EMBANKMENT (COMPLETE IN PLACE)CY60$ - 0
P2-11P-154-5.1GEOGRIDSY120$ - 0
P2-12D-304-8.1MAINTENANCE ACCESS ASPHALT MILLINGS (INSTALL ONLY)CY20$ - 0
P2-13D-506-9.2GROUTED RIPRAP (12 INCH)CY55$ - 0
P2-14D-506-9.4GEOTEXTILE (DRAINAGE, CLASS 1)SY120$ - 0
P2-1531 37 19 - 1GROUTED BOULDERS (24 INCH)CY330$ - 0
P2-16D-752-5.1STEEL SHEET PILING (TYPE II)SF2,080$ - 0
P2-17T-216-8.1SOIL RETENTION BLANKET (COCONUT) (BIODEGRADABLE CLASS 2)SY895$ - 0
P2-18T-901-5.1SEEDINGAC0.50$ - 0
P2-19T-905-5.1TOPSOIL (REMOVED, STOCKPILED, AND REPLACED)AC0.50$ - 0
P2-20T-908-5.1HYDRAULIC MULCHINGSY12,040$ - 0
POND 2 - TOTAL PRICE$ - 0
BID ITEM NO.ITEM NO.ITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICEEXTENDED PRICE
POND 4
P4-1G-100-4.1SAFETY, SECURITY, AND TEMPORARY ITEMSLS1$ - 0
P4-2C-100-14.1CONTRACTOR QUALITY CONTROL PROGRAM (CQCP)LS1$ - 0
P4-3C-102-5.1INSTALLATION AND REMOVAL OF INLET AND OUTLET PROTECTIONEA1$ - 0
P4-4C-105-6.1MOBILIZATIONLS1$ - 0
P4-5P-151-4.1CLEARING AND GRUBBINGAC5.00$ - 0
P4-6P-152-4.1UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)CY23,380$ - 0
P4-7P-152-4.2EMBANKMENT (COMPLETE IN PLACE)CY2,950$ - 0
P4-8P-154-5.1GEOGRIDSY240$ - 0
P4-9D-304-8.1MAINTENANCE ACCESS ASPHALT MILLINGS (INSTALL ONLY)CY40$ - 0
P4-10D-506-9.2GROUTED RIPRAP (12 INCH)CY105$ - 0
P4-11D-506-9.3GROUTED RIPRAP (18 INCH)CY155$ - 0
P4-12D-506-9.4GEOTEXTILE (DRAINAGE, CLASS 1)SY450$ - 0
P4-1331 37 19 - 1GROUTED BOULDERS (24 INCH)CY160$ - 0
P4-14D-752-5.1STEEL SHEET PILING (TYPE II)SF1,135$ - 0
P4-15T-216-8.1SOIL RETENTION BLANKET (COCONUT) (BIODEGRADABLE CLASS 2)SY22,610$ - 0
P4-16T-901-5.1SEEDINGAC8.75$ - 0
P4-17T-905-5.1TOPSOIL (REMOVED, STOCKPILED, AND REPLACED)AC8.75$ - 0
P4-18T-908-5.1HYDRAULIC MULCHINGSY42,350$ - 0
P4-19L-110-5.1DEMOLISH CONCRETE ENCASED DUCT BANKLF160$ - 0
BID ITEM NO.ITEM NO.ITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICEEXTENDED PRICE
POND 5
P5-1G-100-4.1SAFETY, SECURITY, AND TEMPORARY ITEMSLS1$ - 0
P5-2C-100-14.1CONTRACTOR QUALITY CONTROL PROGRAM (CQCP)LS1$ - 0
P5-3C-105-6.1MOBILIZATIONLS1$ - 0
P5-4P-101-5.2RIPRAP REMOVALSY115$ - 0
P5-5P-101-5.3REMOVE EXISTING FLARED END SECTIONEA1$ - 0
P5-6P-151-4.1CLEARING AND GRUBBINGAC0.25$ - 0
P5-7P-152-4.1UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)CY140$ - 0
P5-8P-152-4.2EMBANKMENT (COMPLETE IN PLACE)CY195$ - 0
P5-9D-506-9.2GROUTED RIPRAP (12 INCH)CY105$ - 0
P5-10D-506-9.4GEOTEXTILE (DRAINAGE, CLASS 1)SY190$ - 0
P5-11D-752-5.2CDOT CONCRETE HEADWALL WITH WINGWALLSEA1$ - 0
P5-12D-752-5.4SAFETY RAIL (CABLE)LF56$ - 0
P5-13T-216-8.1SOIL RETENTION BLANKET (COCONUT) (BIODEGRADABLE CLASS 2)SY355$ - 0
P5-14T-901-5.1SEEDINGAC0.25$ - 0
P5-15T-905-5.1TOPSOIL (REMOVED, STOCKPILED, AND REPLACED)AC0.25$ - 0
P5-16T-908-5.1HYDRAULIC MULCHINGSY355$ - 0
POND 5 - TOTAL PRICE$ - 0
BID ITEM NO.ITEM NO.ITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICEEXTENDED PRICE
POND 7
P7-1G-100-4.1SAFETY, SECURITY, AND TEMPORARY ITEMSLS1$ - 0
P7-2C-100-14.1CONTRACTOR QUALITY CONTROL PROGRAM (CQCP)LS1$ - 0
P7-3C-102-5.1INSTALLATION AND REMOVAL OF INLET AND OUTLET PROTECTIONEA5$ - 0
P7-4C-105-6.1MOBILIZATIONLS1$ - 0
P7-5P-101-5.2RIPRAP REMOVALSY10$ - 0
P7-6P-101-5.4REMOVE EXISTING DRAINAGE PIPE (12" PVC)LF25$ - 0
P7-7P-151-4.1CLEARING AND GRUBBINGAC0.25$ - 0
P7-8P-152-4.1UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)CY10$ - 0
P7-9P-152-4.2EMBANKMENT (COMPLETE IN PLACE)CY15$ - 0
P7-10D-506-9.4GEOTEXTILE (DRAINAGE, CLASS 1)SY10$ - 0
P7-11D-506-9.1GROUTED RIPRAP (9 INCH)CY5$ - 0
P7-12D-701-5.112-INCH PLASTIC PIPE (PVC)LF40$ - 0
P7-13D-751-5.1CDOT MANHOLE SLAB BASE (10' DEPTH)EA1$ - 0
P7-14D-752-5.3CDOT CONCRETE HEADWALLEA1$ - 0
P7-15T-216-8.1SOIL RETENTION BLANKET (COCONUT) (BIODEGRADABLE CLASS 2)SY110$ - 0
P7-16T-901-5.1SEEDINGAC0.25$ - 0
P7-17T-905-5.1TOPSOIL (REMOVED, STOCKPILED, AND REPLACED)AC0.25$ - 0
P7-18T-908-5.1HYDRAULIC MULCHINGSY110$ - 0
POND 7 - TOTAL PRICE$ - 0
BID ITEM NO.ITEM NO.ITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICEEXTENDED PRICE
DEICE APRON WEST
DW-1G-100-4.1SAFETY, SECURITY, AND TEMPORARY ITEMSLS1$ - 0
DW-2C-100-14.1CONTRACTOR QUALITY CONTROL PROGRAM (CQCP)LS1$ - 0
DW-3C-102-5.1INSTALLATION AND REMOVAL OF INLET AND OUTLET PROTECTIONEA2$ - 0
DW-4C-105-6.1MOBILIZATIONLS1$ - 0
DW-5P-151-4.1CLEARING AND GRUBBINGAC0.25$ - 0
DW-6P-152-4.1UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)CY260$ - 0
DW-7D-506-9.3GROUTED RIPRAP (18 INCH)CY180$ - 0
DW-8D-506-9.4GEOTEXTILE (DRAINAGE, CLASS 1)SY260$ - 0
DW-9T-216-8.1SOIL RETENTION BLANKET (COCONUT) (BIODEGRADABLE CLASS 2)SY125$ - 0
DW-10T-901-5.1SEEDINGAC0.25$ - 0
DW-11T-905-5.1TOPSOIL (REMOVED, STOCKPILED, AND REPLACED)AC0.25$ - 0
DW-12T-908-5.1HYDRAULIC MULCHINGSY125$ - 0
DEICE APRON WEST - TOTAL PRICE$ - 0
BID ITEM NO.ITEM NO.ITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICEEXTENDED PRICE
DEICE APRON EAST
DE-1G-100-4.1SAFETY, SECURITY, AND TEMPORARY ITEMSLS1$ - 0
DE-2C-100-14.1CONTRACTOR QUALITY CONTROL PROGRAM (CQCP)LS1$ - 0
DE-3C-105-6.1MOBILIZATIONLS1$ - 0
DE-4P-101-5.2RIPRAP REMOVALSY90$ - 0
DE-5P-151-4.1CLEARING AND GRUBBINGAC1.25$ - 0
DE-6D-701-5.112-INCH PLASTIC PIPE (PVC)LF150$ - 0
DE-7D-705-5.1FRENCH DRAIN, COMPLETELF1,040$ - 0
DE-8D-751-5.26-INCH UNDERDRAIN CLEANOUT, COMPLETEEA8$ - 0
DE-9D-751-5.3CDOT TYPE C INLETEA4$ - 0
DE-10D-752-5.3CDOT CONCRETE HEADWALLEA4$ - 0
DE-11D-506-9.1GROUTED RIPRAP (9 INCH)CY15$ - 0
DE-12D-506-9.4GEOTEXTILE (DRAINAGE, CLASS 1)SY40$ - 0
DE-13T-901-5.1SEEDINGAC1.25$ - 0
DE-14T-905-5.1TOPSOIL (REMOVED, STOCKPILED, AND REPLACED)AC1.25$ - 0
DE-15T-908-5.1HYDRAULIC MULCHINGSY5,945$ - 0
DEICE APRON EAST - TOTAL PRICE$ - 0
POND 2 - TOTAL PRICE
POND 4 - TOTAL PRICE
POND 5 - TOTAL PRICE
POND 7 - TOTAL PRICE
DEICE APRON WEST - TOTAL PRICE
DEICE APRON EAST - TOTAL PRICE
ALL SITES - GRAND TOTAL PRICE

File details come from the government source that posted it. Updated .