This is a Request for Proposal (RFP) #24/25-87 issued by the Town of Manchester, Connecticut, specifically for the Water and Sewer Department's SCADA Telemetry System Study and Survey. The project seeks a contractor to conduct a comprehensive assessment of the town's Supervisory Control and Data Acquisition (SCADA) infrastructure, with the goal of evaluating the current telemetry system's condition, identifying operational deficiencies, and providing recommendations to improve communication reliability and system efficiency. The RFP was released on June 6, 2025, with a deadline for questions on July 2, 2025, and a proposal response deadline of July 9, 2025, at 11:00 am. The project scope includes documenting telemetry components, conducting field surveys across multiple sites including wells, pump stations, and tanks, assessing equipment condition, evaluating communication performance, and reviewing cybersecurity and regulatory compliance.
The evaluation criteria for this RFP are weighted across four key areas: quality of the proposal (20 points), demonstrated experience (20 points), understanding of project scope (30 points), and fee competitiveness (30 points). The town will assess proposals based on these criteria and reserves the right to shortlist vendors and conduct interviews. The project involves multiple SCADA sites across Manchester and parts of Glastonbury, with a comprehensive inventory of 16,500 domestic service lines, 1,047 fire and irrigation services, and an average daily water delivery of 5 million gallons. Proposing firms must provide detailed information about their organization, related experience, staffing, project approach, and any litigation history. The contract will require compliance with the Town of Manchester's Living Wage Ordinance, which mandates specific wage rates for eligible employees, and includes extensive insurance requirements with multiple coverage types and minimum liability limits.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCADA_TELEMETRY_SYSTEM_STUDY_AND_SURVEY_(Addendum_#1_Revision).pdf | ||
| LIVING_WAGE_CERTIFICATION.pdf | ||
| LIVING_WAGE_CERTIFICATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
24/25-87
SCADA TELEMETRY SYSTEM STUDY AND SURVEY
Town of Manchester
Lincoln Center
Manchester, CT 06040
RELEASE DATE: June 6, 2025
DEADLINE FOR QUESTIONS: July 2, 2025
RESPONSE DEADLINE: July 9, 2025, 11:00 am
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/townofmanchester https://secure.procurenow.com/portal/%7bproject.government.code%7d
Town of Manchester
REQUEST FOR PROPOSAL
24/25-87
SCADA TELEMETRY SYSTEM STUDY AND SURVEY
I. INTRODUCTION
II. INSTRUCTIONS TO BIDDERS
III. STANDARD INSTRUCTIONS TO BIDDERS
IV. PROJECT DETAILS
V. INSURANCE AND INDEMNIFICATION REQUIREMENTS
VI. LIVING WAGE ORDINANCE
VII. EVALUATION CRITERIA
VIII. VENDOR SUBMISSIONS
Attachments:
A - Manchester Living Wage Certification
Request For Proposal #24/25-87 Title: SCADA TELEMETRY SYSTEM STUDY AND SURVEY
1. INTRODUCTION
1.1. Summary
The Town of Manchester Water and Sewer Department is seeking a capable and reliable contractor to conduct a comprehensive study and survey of the telemetry system for its
Supervisory Control and Data Acquisition (SCADA) infrastructure in Manchester, CT. The project aims to assess the current telemetry system’s condition, identify deficiencies, and provide actionable recommendations to enhance communication reliability, data acquisition, and operational efficiency.
1.2. Background
The Manchester Water and Sewer Department operates water and wastewater treatment facilities serving Manchester, Connecticut, and portions of Glastonbury and surrounding towns.
The water system includes 16,500 domestic service lines, 1,047 fire and irrigation services, and delivers an average of 5 million gallons of water daily. The water supply consists of seven reservoir impoundments and ten groundwater wells, with a total capacity of 9.8 million gallons per day. The distribution system comprises approximately 260 miles of water mains, ten storage tanks, and five pumping stations. The SCADA system monitors and controls critical assets, including wells (e.g., Well 6, Well 7A), pump stations, tanks, and treatment facilities, relying on telemetry data from sensors and equipment. The department seeks to assess its current telemetry system to guide future upgrades, ensuring reliable communication and operational efficiency.
1.3. Contact Information
Cora Narracci
Purchasing Agent
494 Main Street
Purchasing Division
Manchester, CT 06040
Email: cnarracci@manchesterct.gov
Phone: (860) 647-3033
Department:
Water and Sewer
Department Head:
Shannon Miles
Chief Administrative Officer mailto:cnarracci@manchesterct.gov tel:(860)647-3033
1.4. Timeline
Release Project Date June 6, 2025
Question Submission Deadline July 2, 2025, 2:00pm
RFP Opening Date and Time July 9, 2025, 11:00am
2. INSTRUCTIONS TO BIDDERS
2.1. ELECTRONIC BIDDING INFORMATION
Submitting Proposals
Specifications and proposal forms must be obtained online at Town of Manchester Procurement Portal
(opengov.com). The exclusive means by which all prospective bidders may obtain proposal packages, direct inquiries, request and receive addenda and supplemental information, and submit bids and proposals, shall be through the Town of Manchester’s OpenGov portal.
Proposals may be received up to the deadline date and time listed in the solicitation documents, via the
Town’s e-Procurement Portal. The Town e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The
Town of Manchester strongly recommends completing your response well ahead of the deadline.
Addenda Notification and Acknowledgement
Addenda Notification: Bidders are required to register for an account via the Town’s e-Procurement
Portal hosted by OpenGov. Once the bidder has completed registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at Town of Manchester Procurement Portal
(opengov.com)
Submitting Questions and Receiving Responses
Proposers shall submit all inquiries regarding this RFP via the Town’s e-Procurement Portal. Please note any deadline for submitting inquiries. All answers to inquiries will be posted on the Town’s e-
Procurement Portal. Bidders may also click “Follow” on this RFP to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries.
When applicable, state bids will be considered for this service.
The Purchasing Authority reserves the right to waive any informality or reject any and all bids. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the
Manchester Charter, Code of Ordinances, and Purchasing Guidelines. By bidding on the proposed purchase, the bidder agrees to such terms, provisions and conditions.
An Equal Opportunity/Affirmative Action Employer
2.2. BID OPENING INFORMATION
Proposals must be received by the date and time indicated in the bid documents.
2.3. RULES AND REGULATIONS FOR COMPETITIVE BIDDING
These rules and regulations have been adopted by the Board of Directors of the Town of Manchester pursuant to Section 5-22 of the Town Charter. They are standard for all competitive bidding proposals https://procurement.opengov.com/portal/townofmanchester https://procurement.opengov.com/portal/townofmanchester https://procurement.opengov.com/portal/townofmanchester issued by the Town of Manchester, Connecticut for contracts of all types where labor, materials, and necessary equipment to complete work is to be furnished to the Town, where the Town is to purchase supplies, materials, and equipment, where the Town is to sell surplus materials and equipment, or where the Town is to sell real estate. These rules and regulations shall be binding upon all prospective bidders and the Town of Manchester.
2.4. GENERAL RULES
1. The Purchasing Authority may delete or modify any of the instructions to bidders for a particular proposal, indicating such change in the appropriate section of the proposal documents. The Purchasing
Authority may insert special instructions in any special contracts which are subject to competitive bidding.
2. The proposal is signed by the proposer with full knowledge of, and agreement with, the general specifications, conditions, and requirements of this proposal.
3. The town has transitioned to electronic bidding. Vendors should submit solicitation responses electronically via the Town of Manchester Procurement Portal. Vendors will be asked to register and should do so prior to submitting proposal documents.
4.This proposal and any addenda will be issued on the Town of Manchester website bidding portal. It shall be the responsibility of the proposer to download this information. THE TOWN OF MANCHESTER
WILL NOT MAIL A SEPARATE HARD COPY OF ADDENDUM TO PROPOSERS. Failure of any proposer to receive any such addendum or interpretation shall not relieve such proposer from any obligation under his RFP as submitted. All addenda so issued shall become part of the Contract Documents.
5. Proposal prices may not be withdrawn by bidder for 90 days after bid opening.
6. Proposals received later than the time and date specified will not be considered. Amendments to, or withdrawals of proposals received later than the time and date set for submission deadline will not be considered.
7. All deliveries of commodities or services hereunder shall comply in every respect with all applicable laws of the Federal Government and/or the State of Connecticut.
8. Purchases made by the Town of Manchester are exempt from payment of Federal Excise Taxes and the Connecticut Sales Tax and such taxes must not be included in bid prices. Federal Excise Tax exemption certificates, if requested, will be furnished.
9. The Proposer, where applicable, shall insert/include the price per stated unit and extend a total price for each item. In the event there is a discrepancy between the unit price and the extension, the unit price will govern. The total cost shall be the sum of the extended prices.
10. Proposer shall, where applicable, submit terms for payment in spaces provided in the proposal form, showing the amount of cash discount which shall apply to proposal prices when paid within the stated number of days in the proposal.
11. All inquiries shall be submitted within the time limitations specified in the bid documents and shall be requested via the online portal Q&A. All information given by the Town other than through the
OpenGov Portal shall be informal and shall not be binding upon the Town nor shall it furnish a basis for legal action by any proposer or prospective proposer against the Town.
11A. The Town reserves the right to reject any and all proposals, to waive technical defects, and to make such awards including accepting a proposal, although not the lowest cost, as it deems in its sole discretion to be in the best interest of the Town. The Town reserves the right to reject any proposal if the proposer, any officer of the proposer, or any other company owned in whole or in part by any officer(s) of the proposer, is delinquent in the payment of any taxes or fees owed to the Town. The
Town reserves the right to require a disclosure statement from the proposer listing the name(s) of all officers of the company.
11B. In the event the Town determines that a contractor is delinquent in any payment due the Town, then the Town may offset the delinquent amount due to the Town against the sums owed the contractor.
12. The Town of Manchester may make such investigation as deemed necessary to determine the ability of the proposer to discharge a contract. The proposer shall furnish the Town with all such information and data as may be required for that purpose. The Town reserves the right to reject any proposal if the proposer fails to satisfactorily convince the Town that he is properly qualified by experience and facilities to carry out the obligations of the contract and to satisfactorily complete the work called for herein, or if the proposal is conditional in nature.
13. Except where otherwise provided, a contract between the Town and a successful proposer shall consist of the Request for Proposal, Specifications, Plans, Proposal, and Acceptance by the Town and these Rules and Regulations. Acceptance by the Town may be by purchase order for the portion of the work awarded to a contractor.
14. All Requests for Proposal shall be publicly advertised in a newspaper having a general circulation within the Town of Manchester, Connecticut.
15. The Request for Proposal shall be made available on the Town of Manchester Purchasing Web Site via the OpenGov Portal.
16. Any act or acts of misrepresentation or collusion shall be a basis for disqualification of any proposal or proposals submitted by such persons guilty of said misrepresentation of collusion. In the event that the Town enters into a contract with any bidder who is guilty of misrepresentation or collusion and such conduct is discovered after the execution of said contract, the Town may cancel said contract without incurring liability, penalty, or damages.
17. In the event that any proposer wishes to protest the potential award of a proposal, the proposer must make it’s protest in writing, identify the protesting party, the RFP number, title and shall include a factual summary of the basis of the protest including any documents that shall be considered and request a conference with respect thereto. Said protest must be received in the Town of Manchester
Purchasing Office, within FIVE (5) business days after the award decision.
18. A conference with respect to said protest shall be scheduled by the Purchasing Authority and shall be attended by the Purchasing Authority or their designee and such other persons as the Purchasing
Department and the Town Manager shall require attend. The subject matter of said conference shall be limited to the reasons for the protest specified in the written request for said conference. Said conference shall also include a discussion of all possibilities for a resolution of dispute. The Town shall make a decision in writing within three (3) business days after said conference and notify protesting bidder.
19. In the event that any protesting proposer wishes to take legal action against the Town, they must first fully comply with all of these Rules and Regulations, including those which have been changed by the Purchasing Authority pursuant to paragraph 1 herein.
20.Except for special instructions inserted in special contracts by the Purchasing Authority pursuant to paragraph 1 herein, in the event of any conflicts between these Rules and Regulations and the terms and conditions of any document these Rules and Regulations shall prevail.
21. All Awards shall be made by the Purchasing Authority.
22. The Town of Manchester is an equal opportunity employer and requires an affirmative action policy for all of its Contractors and Vendors as a condition of doing business with the Town, as per Federal
Order 11246. By signing the Proposal form for this proposal, all vendors and contractors agree to this condition of doing business with the Town, and should the Town choose to audit their compliance, the vendor agrees to cooperate fully.
23. The contractor shall not transfer, sublet, or assign the contract by Power of Attorney or otherwise to any person, firm, or corporation, or in any way vary the terms of the contract without written permission from the Town. The Town has the right to terminate with a thirty (30) day written notice to the contractor. The Town reserves the right to terminate the contract at any time during the contract period. Such termination shall be effective immediately after giving written notice to the contractor that the Town is terminating the contract.
2.5. Important Instructions for Electronic Submittal
Proposers shall create a FREE account with Open Gov Procurement by signing up at https://secure.opengov.com/portal/townofmanchester. Once you have completed account registration, browse back to this page, https://procurement.opengov.com/portal/townofmanchester and click on
"Submit Response", and follow the instructions to submit the electronic bid.
2.6. Instructions to Bidders
In accordance with the provisions of the Town Charter, sealed proposals will be received through the
OpenGov Portal, not later than the date and time set forth above, for furnishing the commodities and/or services listed herein. Proposals must be executed in accordance with and subject to instructions and specifications contained herein.
3. STANDARD INSTRUCTIONS TO BIDDERS
3.1. STANDARD INSTRUCTIONS TO BIDDERS – SUPPLIES, MATERIALS &
EQUIPMENT
These instructions are standard for all proposals issued by the Town of Manchester, Connecticut, for the purchase of all supplies, materials, and equipment. The Town of Manchester may delete, supersede, or modify any of these standard instructions for a proposal by indicating such change in the section headed
“Special Instructions to Bidders.”
1. Unless otherwise stated, deliveries must consist of new merchandise.
2. Prices quoted shall be net delivered prices to the Town.
3. The Town may withhold acceptance of, or reject any merchandise which found, upon examination, not to meet the specifications’ requirements. When rejected, it shall be removed by the Contractor
(vendor) within ten (10) days after notification of rejection.
4. When the schedule indicates that an item to be purchased is to be specified, or equal, the bidder may offer an article which is certified to be equal in quality, performance, and in other essential characteristics to the bid standard. Bidder must furnish any information, such as specifications, test results, etc., which will help in determining whether an item is equal or superior to the Town’s bid standard. If a bidder fails to name a substitute, the specified item must be furnished.
5. Bidders agree to comply with all of the latest Federal and State safety standards and regulations and certify that all items furnished in this bid will conform to and comply with said standards and regulations. Bidder further agrees to indemnify and hold harmless the Town for all damages assessed against the Town as a result of the bidder’s failure to comply with said Standards and/or Regulations.
6. The Town reserves the right to make an award by item, total or by group, as may be in the best interest of the Town. If a Bidder desires to bid on an “all or nothing” basis, he shall so indicate on the bid schedule and the Town reserves the right to make an award as may be in the best interest of the Town.
7. The Bidder shall pay all royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the Town of Manchester harmless from loss on account thereof except that the Town of Manchester shall be responsible for all such loss when a particular manufacturer, product, or process is specified by the Town of Manchester.
3.2. Overview:
The Town of Manchester desires to engage a contractor to provide the services in support of the SCADA
TELEMETRY SYSTEM STUDY AND SURVEY.
Incorporated as part of the RFP are the #Attachments, #Scope of Work . The Project includes, but is not limited to, Invitation to RFQ/RFP, Instructions to Bidders, Supplementary Instructions to Bidders, RFQ/RFP Form, Standard Form of Agreement Between Owner and Contractor , General Conditions of the Contract for Construction , and Supplementary General Conditions of the Contract for Construction.
https://procurement.opengov.com/portalownofmanchester/projects/23771?section=187364 https://procurement.opengov.com/portalownofmanchester/projects/23771?section=187367
3.3. Description of Project:
SCADA TELEMETRY SYSTEM STUDY AND SURVEY
3.4. Services Required:
The Town is seeking to engage a contractor to provide SCADA TELEMETRY SYSTEM STUDY AND SURVEY.
The Contractor to be engaged in this Project shall become part of the Project team working with the
Town representatives.
The Town reserves the right to award the contract to the contractor deemed to be in the best interests of the Town for the Project after review of the submissions received, not based solely on cost or any other specific factors.
The duties and responsibilities of the contractor will include the outlined scope.
3.5. Qualification Requirements:
1. Firm Description – Provide a description and brief history of the firm. Name firms, location of principal and branch offices; length of time in business; and firm ownership structure.
2. Related Experience – Please provide a list of all projects currently in progress and completed over the last five years. The description should at a minimum provide the project name, location, year of completion, type of contract, renovation cost, size, owner name and reference with telephone number.
3. Organization and Staffing – Provide an organization chart for staff proposed for this project which clearly identifies your proposed management staff for the project (Project Executive, Project Manager, Project Superintendent, etc.). Also include detailed resumes for each person identified.
4. Typical Project Approach – Provide description of services your firm will utilize during each phase of the project to ensure the project is completed on schedule and within budget.
5. Litigation/Arbitration – List information on (a) any involvement in litigation or arbitration with municipal clients; and (b) all clients that have terminated your services prior to completion of any project within the past ten (10) years. Explain circumstances that led to it and describe the resolution.
6. Insurance – Contractor/ Vendor shall agree to maintain in force at all times during the contract the following minimum coverages and shall name the Town of Manchester as Additional Insured on a primary and non-contributory basis to all policies except Workers Compensation.
4. PROJECT DETAILS
4.1. Scope of Work
The contractor shall be capable of conducting a comprehensive study and survey of the SCADA telemetry system, assessing its current condition, identifying deficiencies, and providing recommendations for improvements.
4.2. SYSTEM INVENTORY AND DATA COLLECTION
Telemetry Inventory: Document all telemetry components, including radio transceivers, antennas, repeaters, Remote Terminal Units (RTUs), Programmable Logic Controllers (PLCs), and network interfaces at SCADA sites (e.g., wells, pump stations, treatment plants).
Data Collection: Gather operational data, such as communication protocols (e.g., Modbus, DNP3), frequency bands (e.g., licensed UHF/VHF, unlicensed 900 MHz), signal strength, latency, and error logs.
Field Surveys: Conduct site visits to inspect telemetry equipment, assess environmental factors (e.g., terrain, obstructions), and verify connectivity across all monitored locations listed in Project Details, Section 4.7, Manchester SCADA sites.
4.3. CONDITION ASSESSMENT
Equipment Evaluation: Assess the physical condition, age, and compatibility of telemetry hardware, identifying issues like equipment obsolescence, corrosion, or signal degradation.
Communication Performance: Evaluate telemetry reliability, coverage gaps, data loss rates, and latency issues affecting SCADA performance.
Cybersecurity Compliance: Review security measures (e.g., encryption, authentication) to ensure compliance with modern standards (e.g., NIST, cybersecurity guidelines).
Regulatory Compliance: Verify compliance with Federal Communications Commission (FCC) regulations for radio telemetry and Connecticut Department of Energy and Environmental Protection (DEEP) standards for SCADA operations.
4.4. DEFICIENCY INDENTIFICATION
Problem Areas: Identify telemetry deficiencies, such as unreliable communication links, outdated hardware, insufficient coverage, or security vulnerabilities, particularly for the assets listed in Project
Details, Section 4.7, Manchester SCADA sites.
Risk Assessment: Prioritize issues based on impact to SCADA operations, data integrity, and system reliability.
Technology Gaps: Assess the adequacy of current telemetry technologies and protocols, identifying gaps that could be addressed with modern solutions (e.g., advanced radio systems, cellular, or satellite).
4.5. RECOMMENDATIONS
Improvement Plan: Provide detailed recommendations for addressing identified deficiencies, including hardware replacements, network upgrades, or alternative telemetry technologies (e.g., licensed radio, cellular, IoT-based).
Cost Estimates: Include preliminary cost estimates for recommended actions, categorized by priority
(e.g., immediate, short-term, long-term).
Future-Proofing: Propose strategies to enhance telemetry scalability, resilience, and compatibility with emerging SCADA technologies.
4.6. REPORTING
Draft Report: Submit a draft report summarizing findings, deficiencies, and recommendations, including diagrams, network maps, and supporting data for all SCADA-monitored assets.
Final Report: Incorporate feedback from the Water and Sewer Department and deliver a final report in digital and hard copy formats.
Presentation: Present findings and recommendations to department staff and stakeholders in a formal meeting.
4.7. MANCHESTER SCADA SITES
Manchester SCADA Sites
• Globe Hollow WTP - 125 Spring St 41.760149473202524, -72.51598201239285
• Well #1 - 535 Fern Street 41.75037462138922, -72.51161233964443
• Well #2A - 192 Charter Oak St 41.76280786460629, -72.51228276781563
• Well #3 - 110/222 Charter Oak St 41.76213757933455, -72.51087121872729
• Well #4 - 110/50 Charter Oak St 41.76304128054033, -72.51601431195613
• Well #5 - 10 Love Lane 41.7792022212679, -72.558373727694
• Well #6,7,8 New State Road Facility - 315 New State Road 41.78887752380686, -
72.55594471292602
• Well #10 - 503 Parker St 41.794515509538506, -72.50632192733693
• Well #11 - 245/361 Progress Dr 41.79884292915686, -72.50237388679922
• Rockledge Tanks - 0 Garth Rd 41.781048347888046, -72.48774149824273 (572 FT elevation)
• Forest Hills Tanks - 463 Vernon St 41.79962298785461, -72.48909551413477 (416.7 FT elevation)
• JC Penny Tanks - (81) Batson Dr, Buckland Ind Park 41.79535964908655, -
72.57714108342562 (325 FT elevation)
• Nike Storage Tank- 87 Hercules drive 41.75063° , 72.53001° (416 FT elevation)
• Buckland Hill Tank - Buckland Hills Drive 41.81005564305323, -72.54673917989172 (417
FT elevation)
• Lookout Mountain Tanks - Lookout Mountain Drive 41.757552310951525, -
72.48881617191671 (572 FT elevation)
• Birch Mountain Tanks - 0 Laurel Terrace/212 Birch Mountain Rd 41.75710627347244, -
72.48066150616339 ( 799 FT elevation)
• Glastonbury Pump Station - 26 Woodhaven Rd Glastonbury, CT 41.719234827813935, -
72.52019280322105
• Bayberry Pump Station - 240 Bayberry Rd 41.75600771034064, -72.55724961310091
• Lydall Pump Station - 500/555A Lydall St 41.79583693175005, -72.48617720342742
• Hercules Pump Station - 87 Hercules Drive 41.7528922752674, -72.5312011093262
• Birch Mountain Pump Station - 9 Camp Meeting Road 41.76810807262628, -
72.47895023531923
• Highland Street Pump Station - Highland St 41.764981119394385, -72.50036600307867
• Cooper Hill Valve Pit - Cooper Hill St 41.76594978544695, -72.53491157694555
• Fern St Valve Pit - Fern St 41.75028305822563, -72.51616166415172
• Broad St Valve Pit - 0 Center St 41.77281732515283, -72.53224737240463
• Oxford St Valve Pit - 0 Oxford St 41.78320526760904, -72.52646164234793
• Hilliard St Valve Pit - 0 Hilliard St 41.79298029527755, -72.52522030879749
• Howard Porter Valve Pit - Ferguson Road 41.77552447158673, -72.4865613074155
• Target Valve Pit (Meter Pit) (send signal to Buckland Hills Tank) - Buckland Hills
Drive 41.80913248573443, -72.5503793155143
• Valve Pit (Meter Pit) - Bridle Path Lane (Currently No Comms) 41.80208735909585, -
72.47439808687209
4.8. ADDITIONAL REQUIREMENTS
Comply with all applicable federal, state, and local regulations, including FCC and DEEP standards.
Be capable of providing all necessary tools, equipment, and personnel to conduct the study and survey.
Coordinate with Water and Sewer Department staff to access facilities and data listed in Project Details, Section 4.7, Manchester SCADA sites, with minimal disruption to operations.
5. INSURANCE AND INDEMNIFICATION REQUIREMENTS
5.1. GENERAL CONDITIONS:
Within ten (10) business days of the award or notice, or prior to the start of work, whichever comes first, the contractor will provide, pay for, and maintain in full force and effect the insurance outlined here for coverage’s at not less than the prescribed minimum limits of liability. Such coverage is to remain in force during the life of the contract and for such additional time as may be required, and will cover the contractor/ independent insured’s activities, those of any and all subcontractors, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents, or employees.
A.
Certificates of Insurance: The contractor will give the owner a certificate of insurance completed by a duly authorized representative of their insurer certifying that at least the minimum coverage’s required here are in effect and specifying that the liability coverage’s are written on an occurrence (or claims-made where applicable) form and that the coverage’s will not be canceled, non-renewed, or materially changed by endorsement or through issuance of other policy(ies) of insurance without sixty (60) days advance written notice to the General Services Department. Failure of the owner to demand such certificate or other evidence of full compliance with these insurance requirements or failure of the owner to identify a deficiency from evidence provided will not be construed as a waiver of the contractor’s obligation to maintain such insurance. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents, or employees.
B.
Insurer Qualification: All insurance will be provided through companies authorized to do business in the
State of Connecticut and considered acceptable by the owner. Insurance Companies shall maintain a minimum A.M. Best rating of A-/VIII.
C.
Additional Insured: The policy or policies providing insurance as required, with the exception of professional liability and workers’ compensation, will defend and include the owner, directors, officers, representatives, agents and employees, and where applicable owner’s architects or engineers, as additional insureds on a primary and noncontributory basis for work performed under or incidental to this contract.
D.
Retroactive Date and Extended Reporting Period: Coverage, whether written on a claims made or occurrence basis, shall be maintained without interruption from the date of commencement of the
Work until date of final payment and then extended for an additional three (3) years from date of final payment.
If any insurance required here is to be issued or renewed on a Claims Made form as opposed to an
Occurrence form, the retroactive Date for coverage will be no later than the commencement date of the project. The Claims Made form will have an Extended Reporting Period of three years from the date of project completion. All Claims made policies cancelled or non-renewed and not replaced by a subsequent claims made policy will have an Extended Reporting period of three years from the date of cancellation or non-renewal.
E.
Subcontractors’ Insurance: The contractor will require each subcontractor hired by and/or employed by contractor to purchase and maintain insurance of the types specified below. When requested by the owner, the contractor will furnish copies of certificates of insurance evidencing coverage for each subcontractor.
F.
Waiver of Subrogation: The contractor/subcontractor will purchase required insurance policies that shall be endorsed with a waiver of subrogation and all rights of recovery in favor of the Town, its officers, officials, agents and employees. The contractor will require of subcontractors, by appropriate written agreements, similar waivers each in favor of all parties enumerated in this section.
G.
Indemnification/Defense/Hold Harmless: To the extent provided by law, the contractor shall indemnify, defend, and hold harmless the owner, officers, officials, agents and employees, and if applicable, the engineer and their agents and employees from and against all claims, damages, losses and expenses, including attorney’s fees of counsel selected by the owner, arising out of or resulting from the performance of the work and /or the supplying of materials, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting therefrom, and (b) is caused in whole or in part by any negligent act or omission of the contractor/ insured, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not they are caused in part by a party indemnified hereunder.
5.2. INSURANCE LIMITS AND COVERAGE:
A.
To the extent applicable, the amounts and types of insurance will conform to the minimum terms, conditions, and coverages of Insurance Services Office (ISO) policies, forms, and endorsements.
B.
If the contractor has self-insured retention’s or deductibles under any of the following minimum required coverage’s, the contractor must identify on the certificate of insurance the nature and amount of such self-insured retention’s or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be the contractor/ independent insured’s sole responsibility.
C.
Workers’ Compensation Insurance: With respect to all operations the Contractor performs and all those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry
Workers’ Compensation insurance as required by the laws of the State of Connecticut.
Employer’s Liability insurance shall be provided in amounts not less than:
$500,000 per accident for bodily injury by accident, $500,000 policy limit by disease; and
$500,000 per employee for bodily injury by disease.
D.
Commercial General Liability Insurance: With respect to the operations the Contractor performs and also those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry, Commercial General Liability insurance, including Contractual Liability, Products and Completed Operations, Broad Form Property Damage and Independent Contractors in an amount not less than $1,000,000 combined single limit, per occurrence, and $2,000,000 aggregate. Owner shall be included as additional insured. Per project aggregate to apply.
Notes:
If underground work is to be undertaken, each policy shall have coverage for and exclusions removed for “Explosion, Collapse and Underground” (“XCU”) hazards.
Should blasting be required, all necessary permits for the use of explosives shall be obtained by the contractor or insured from the Fire Marshall.
E.
Automobile Liability Insurance: The Contractor shall obtain automobile liability insurance with a minimum limit of $1,000,0000 combined single accident, covering the operation of all motor vehicles, including those hired or borrowed, that are used in connection with the Project for all damages arising out of bodily injury to or death of all persons and/or injury to or destruction of property. This policy shall not be subject to an annual aggregate limitation.
F. Umbrella/Excess Coverage: contractor shall purchase and maintain umbrella/excess liability insurance with a limit of not less than $1,000,000 per occurrence/aggregate, covering all lines of insurance required by this contract. This coverage is required to sit above the underlying General Liability, Automobile Liability and Employer Liability part of the Workers Compensation policies. Depending on the scope and size of risk of the work to be performed, higher limits of coverage may be required.
G.
Owner’s and Contractor’s Protective Liability Insurance for and in the Name of the Town and/or State:
With respect to the Contractor’s operations and also those of its subcontractors, the Contractor shall carry, for and on behalf of the Town and/or State for each accident or occurrence resulting in damages from bodily injury to or death of persons and/or injury to or destruction of property, with a minimum of
$1,000,000 per occurrence. Other Insurance Coverage That May Be Required:
• Professional Liability: Not less than $1,000,000 per claim and aggregate to be maintained for the duration of the agreement and three years following its termination.
• This insurance requirement applies when a contractor has a professional designation or license and/or is providing professional services. The minimum limit for architects and engineers is $1,000,000 per claim and in the aggregate and may be increased depending upon the nature of the services to be provided to Owner.
• Cyber Risk Insurance: Not less than $1,000,000 per cyber incident to be maintained for the duration of the agreement and three years following its termination.
• This insurance requirement applies when a third party will be using, storing, or accessing private, confidential or protected information.
• Environmental Liability: Not less than $1,000,000 per claim and in the aggregate.
• This insurance requirement applies when a contractor will be performing environmental clean-up work (decontamination/remediation), will be working with hazardous substance or waste, or may have similar such exposures while performing work under the proposed agreement. Higher limits of environmental liability coverage may be required depending upon the scope of work.
** Exceptions to the above requirements are subject to the sole discretion of the Town of Manchester
Version 4.2.2024
6. LIVING WAGE ORDINANCE
6.1. Living Wage Ordinance
This contract is subject to provisions of the Town of Manchester Living Wage Ordinance. A summary description of the ordinance and the certification form is attached. Bidders are asked to indicate on the attached Certification Form if your firm would be considered a covered employer. The Certification Form shall be returned to the Town with the proposal.
6.2. Summary Description for Vendors Regarding Manchester’s Living Wage Ordinance
Effective February 1, 2010, the Town of Manchester adopted a living wage ordinance. This Summary
Description is designed to provide any vendor bidding on a Town of Manchester contract with the key provisions of that ordinance. It does not contain the full ordinance.
LIVING WAGE REQUIREMENT:
The ordinance requires that companies awarded service contracts by the Town of Manchester exceeding $25,000 in any one fiscal year pay their Eligible Employees a living wage. Companies considered Covered Employers subject to this requirement are defined below. The Town of Manchester has determined that the contract resulting from this bid or Request for Proposals will be subject to the ordinance if the total contract value is $25,000 or more in any one fiscal year.
The living wage is currently calculated to be $17.25 per hour for employees that are provided comprehensive health care benefits, or $25.46 per hour for employees that are not provided comprehensive health care benefits.
The living wage and health benefit requirements are adjusted annually each July, effective July 1, 2010.
Companies will be required to pay the applicable living wage rate in effect during the term of their contracts.
COVERED EMPLOYERS AND EXEMPTIONS:
The ordinance requires that Covered Employers pay the living wage rate. Certain employers are excluded from paying the living wage rate. They are as follows:
Non-profit organizations as defined by the ordinance, and
Entities that employ less than 25 eligible employees.
ELIGIBLE EMPLOYEES:
Eligible employees are all permanent, full time employees of the company (defined as a normal work week of at least 30 hours), working in the State of Connecticut, not just those working on the Town contract. The following are not considered eligible employees for the purposes of the living wage requirement:
Employees with a normal work week of less than 30 hours.
Seasonal or temporary employees.
Employees under the age of 18.
Employees hired as part of a school-to-work program.
Students who serves in a work-study program or as an intern.
Trainees participating for not more than six months in a training program.
Employees enrolled in a governmentally funded vocational rehabilitation program.
Volunteers working without pay.
Employees exempted under Section 14(c) of the Fair Labor Standards Act due to disabilities.
Any person whose wage rate is subject to a federal or State of Connecticut statute or regulation mandating a prevailing wage rate.
EMPLOYER OBLIGATIONS:
Covered Employers are required to do the following pursuant to the ordinance.
Certify with the submission of their bid or proposal a) that they will pay the required living wage to eligible employees if awarded a contract, or b) that they are exempt from requirements of the ordinance, Upon award, covered employers shall provide the Town a sworn affidavit affirming that all eligible employees of the covered employer working in the State of Connecticut are receiving the living wage and health benefits required by this ordinance.
This sworn affidavit shall be provided thereafter on an annual basis within 30 days of a request being made by the Town if the duration of the contract exceeds one (1) year.
Notify their employees of their rights under the Living Wage Ordinance by posting a copy of the ordinance and other materials prepared by the Town of Manchester in locations where employees will see them.
Make best efforts to attempt to hire residents of the Town of Manchester for all new positions which result from a service contract subject to the ordinance.
PROHIBITED PRACTICES:
Covered Employers cannot decrease non-wage benefits (such as insurance, vacation, or pension) as a means of complying with the living wage requirements.
Covered Employers cannot retaliate or discriminate against any employee for making a complaint against the covered employer regarding compliance with living wage requirements.
ENFORCEMENT:
The Town may enforce the provisions of this ordinance by the imposition of fines, suspension of contract or declaring the Covered Employer ineligible for future contracts.
WAIVERS:
The ordinance provides for the waiver of certain requirements in the ordinance. However, no waivers will be considered until the bidding process has been completed and a contract has been awarded.
Requests for waivers must be made by the Covered Employer, in writing, to the General Manager. The
General Manager shall submit the waiver request to the Board of Directors, which shall have the sole discretion as to whether it is granted.
The above is intended to be a summary of the requirements of the living wage ordinance as they affect covered employers and is provided for informational purposes only. Employers should read the entire
Living Wage Ordinance. It can be found online at www.townofmanchester.org on the left side of the page. Click on Document Center, scroll to General Services and click on Living Wage Ordinance.
7. EVALUATION CRITERIA
The Town will evaluate all proposals deemed responsive to this request by a committee selected by the
Town of Manchester. Proposals will be evaluated by the Town based on the criteria below:
If deemed necessary by the committee, the Town of Manchester reserves the right to shortlist the proposals received and arrange for interviews/ oral presentations to the committee as part of the selection process. Discussions, requests for additional information and negotiations may take place with the short list vendors to ensure clarification and to obtain a system that meets the requirements of this
RFP.
The Town of Manchester shall select the responsible and responsive Proposal which is determined by the Town to be the best suited, most advantageous, and provides the greatest overall benefit to the
Town on the basis of the criteria and evaluation factors included in this Request for Proposal. Cost shall be only one factor in the award decision. The Town expressly reserves the right to negotiate with the selected vendor prior to an award of any contract pursuant to this Request for Proposal.
No. Evaluation Criteria Scoring Method Weight (Points)
1. Quality of the proposal
Clarity, organization, and completeness of the proposal.
Points Based 20 (20% of Total)
2. Demonstrated Experience
Capability and experience of the firm and personnel on similar
SCADA telemetry studies
Points Based 20 (20% of Total)
3. Understanding of Project Scope
Demonstrated capability to understand and address project requirements for the telemetry study, including coverage for assets in Section 6.4
Points Based 30 (30% of Total)
4. Fee
Competitiveness and reasonableness of the proposed costs
Points Based 30 (30% of Total)
8. VENDOR SUBMISSIONS
8.1. Proposal Requirements*
Please confirm that you have read and agreed with the entire RFP and related attachments (if any) including
A. General Conditions, if applicable
B. Special Provisions and Specifications, if applicable
☐ Yes
☐ No
*Response required
8.2. Firm Description*
Provide a description and brief history of the firm. Name of firm, location of principal and branch offices;
length of time in business; and firm ownership structure.
*Response required
8.3. Related Experience*
Please provide a list of all projects currently in progress and completed over the last five years. The description should at a minimum provide the project name, location, year of completion, type of contract, renovation cost, size, owner name and reference with telephone number.
*Response required
8.4. Organization and Staffing*
Provide an organization chart for staff proposed for this project which clearly identifies your proposed management staff for the project (Project Executive, Project Manager, Project Superintendent, etc.).
Also include detailed resumes for each person identified.
*Response required
8.5. Typical Project Approach*
Provide description of services your firm will utilize during each phase of the project to ensure the project is completed on schedule and within budget.
*Response required
8.6. Litigation/Arbitration*
List information on (a) any involvement in litigation or arbitration with municipal clients; and (b) all clients that have terminated your services prior to completion of any project within the past ten (10) years. Explain circumstances that led to it and describe the resolution.
*Response required
8.7. Insurance*
Contractor/ Vendor shall agree to maintain in force at all times during the contract the following minimum coverages and shall name the Town of Manchester as Additional Insured on a primary and non-contributory basis to all policies except Workers Compensation.
☐ Please confirm
*Response required
8.8. Separate Cost Proposal*
Confirm that your fee proposal is not attached in your Proposal and is attached separately here.
*Response required
8.9. Addenda *
This bid and any addenda will be issued on the Town of Manchester website bidding portal. It shall be the responsibility of the bidder to download this information. THE TOWN OF MANCHESTER WILL NOT
MAIL A SEPARATE HARD COPY OF ADDENDUM TO BIDDERS. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.
☐ Please confirm
*Response required
8.10. Have you completed and uploaded the Living Wage Certification? If the form is in the attachments section, then you must complete it and submit it with your bid.*
☐ Yes
☐ No
*Response required