Hanscom Air Force Base 8 September 2021
FA2835-21-B-0002
Steam and Condensate Indefinite Quantity Indefinite Delivery Draft Requirement Industry Questions and Responses #1 to DRAFT SOW and DRAFT BID SCHEDULE Posted 23 July 2021
Government Responses in RED Sub Sch
Line No Description RFI
C C48 Replace bucket trap · What is connection size? Sizes range from ½” to 2”, the most common is 1”
· What is steam pressure? 100 psi
· What is required capacity (lb/hr)? 20 lb/hr
C C56 Replace high pressure orifice trap with bucket
· What is connection size Sizes range from ½” to 2”, the most common is 1”
· What is steam pressure? 100
C C66 Replace steam trap · What is connection size? Sizes range from ½” to 2”, the most common is 1”
· What is steam pressure? 100 psi
· What is required capacity (lb/hr)? 20 1b/hr
· What type of steam trap (inverted bucket, float & thermostatic, thermodynamic, thermostatic) inverted bucket
J J13 Trap Monitor & Transmitter
· Line item removed from S&C IDIQ
J J14 Trap Monitor Relay · Line item removed from S&C IDIQ
K K10 New Flash Tank · What is required diameter? 12”
· Is this a horizontal or vertical flash tank? Horizontal
· What are the required dimension of the flash tank? 12”x24”
· What pressure rating is needed? 100 psi
K K12 New Condensate receiver pump
· What is model # of the existing unit? Varies by building, typical configuration is a condensate pump set with 2 pumps @ 3 gpm each on a 15 gallon receiver tank, including control panel.
· What is the serial # of the existing unit? HAFB does not have a standard condensate receiver pump.
· What is electrical power to the pump? 120V
· Is a whole new unit required (including control panel) or just replacement pump/motor? Including panel
K K13 Pump Traps (steam ejector condensate pumps)
· What is condensate load? Varies by building. Assume 1000 pph
· What is available motive steam pressure? 100 psi
· What is total discharge pressure (head pressure + friction loss in the pipe)? 10 psi
K K89 Replace steam PRV · What type of PRV? Pilot Operated or self contained pilot operated
· What size is existing PRV? 1000 pph
· If there is an existing safety relief valve downstream – does that need to be replaced too? No, separate line
K K90 Replace steam PRV · What type of PRV? Pilot Operated or self contained Pilot operated
· What size is existing PRV? 500 pph
· If there is an existing safety relief valve downstream – does that need to be replaced too? No K K91 Replace steam PRV · What type of PRV? Pilot Operated or self contained Pilot operated
· What size is existing PRV? 1500 pph
· If there is an existing safety relief valve downstream – does that need to be replaced too? No K K92 Install moisture separator · What is steam pressure? 100 psi
· What is line size? Assume 2”
· What is the steam flow rate through the separator? (lb/hr) 1000 pph
· Will scope also include the required steam trap assembly installed on the separator drain connection? No K K93 Steam Meter · What is the steam pressure? 100 psi
· What is the line size? 2”
· What is the estimated min/max steam flow? Min – 200 pph; Max 1500 pph
· What communication protocol is required? BACNet to JCI Metasys
· What is available power? 120 V
· What is required meter accuracy? <0.5%
· What is required meter repeatability? Please clarify question?
· What data outputs are required? Modbus (fieldbus) 485 RTU, Pulse, IP
· Will the scope also include the required pressure and temperature transmitter installation needed for proper density compensation? No
K K94 Water Meter · What is the water pressure? 80 psi
· What is the line size? 2”
· What communication protocol is required? BACNet to JCI Metasys
· What is available power? 120V
· What is required meter accuracy? <0.5%
· What is required meter repeatability? Please clarify question?
· What data outputs are required? Modbus (fieldbus) 485 RTU, Pulse (Preferred)
· Is this meter for potable water service? Yes
· What technology meter? Vortex, Turbine, Magnetic, non-invasive ultrasonic?
Turbine
K K95 Chilled Water Meter · What is the water pressure? 70 psi max
· What is the line size? 2”
· What communication protocol is required? BACNet to JCI Metasys
· What is available power? 120V
· What is required meter accuracy? <0.5%
· What is required meter repeatability? Please clarify question?
· What data outputs are required? Modbus (fieldbus) 485 RTU, IP
· Is this meter for potable water service? No
· What technology meter? Vortex, Turbine, Magnetic, non-invasive ultrasonic? We have
Vortes type meters currently, however, we do not have a preference.
· Will the scope also include the required supply/return temperature transmitters for BTU calculations? Yes
Were the responses to the Sources Sought notice favorable? The Government intent was to determine the level of interest in the upcoming Hanscom Air Force Base Steam and Condensate Indefinite Delivery Indefinite Quantity Contract; Sources Sought and Questionnaire responses were not assessed for favorability.
Is an acquisition strategy for a competitive Solicitation under development? The Government intent is to conduct a competitive solicitation using FAR Part 14 Sealed Bidding procedures.
Is there an approximate time frame to watch SAM or a particular contract vehicle for information? The Government is in the process of finalizing the requirement documents and hopes to have a solicitation released soon.