SC-500_Cement_Concrete_Sidewalk.pdf

PDF 127 KB Posted

Attached to
RENO/REPLACE BRICK ROADWAYS-CBD
Solicitation number
2024-IFB-002
Issued by
Allegheny County, Philadelphia City, Pennsylvania

About this file

This document is a City of Pittsburgh Standard of Construction technical drawing for Reinforced Concrete Sidewalk, detailing specifications for sidewalk construction and installation. The technical drawing provides comprehensive design guidelines for sidewalk construction, including plan views, section details, and critical installation notes. The drawing specifies four key implementation requirements: 4" reinforced sidewalks are required in areas of personal vehicle loading/traffic or as mandated by the Department of Public Works, pavement "Class A" shall have a compressive capacity of 4,000 PSI at 28 days, pavement joint extensions must align with curb joints, and no individual sidewalk pad shall exceed 36.0 square feet.

The technical drawing includes precise architectural specifications for sidewalk construction, featuring expansion and control joint details, concrete sidewalk cross-sections at 4" and 6" scales, and specific reinforcement requirements. The design incorporates detailed measurements for street and curb alignments, with notations about concrete subgrade preparation and joint sealing. The document appears to be part of the City of Pittsburgh's infrastructure improvement standards, potentially linked to the broader roadway renovation project involving brick roadway replacement in the Central Business District (CBD). The drawing provides technical guidance for contractors and engineers involved in municipal sidewalk construction and renovation projects.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .