Solicitation Number

SBAHQ-17-Q-0016

Document Title

Replacement and Maintenance of HVAC Units at Herndon, VA Centers Page

QUESTIONS AND ANSWERS

1. Please provide mechanical and electrical drawings for floors, 1, 5 and 6.

Answer 1: The government does not have mechanical and/or electrical drawings.

2. As discussed during the walkthrough, please provide a more defined scope.

Answer 2: The SOW has been updated to include information about this requirement.

3. With a more defined scope of work, will this also allow an extension in RFP date?

Answer 3: The due date for the quotes is due date for the quotes is extended with the quotes due on or before 11:00 am ET June 6, 2017.

4. Please provide model and serials numbers of all existing equipment being replaced

Answer 4: Equipment List and Locations th

Floor LAN Room:

Quantity 1: STULZ ATS AHU’S M# COS-060-AR-U S# 06046038

Quantity 1: STULZ ATS AHU’S M# COS-060-AR-U S# 06046039

Quantity 1: HEATCRAFT CU’S M# FCB8SM S# T06C03711

Quantity 1: HEATCRAFT CU’S M# FCB8SM S# T06C03712

Floor Phone Room:

Quantity 1: LIEBERT AHU M# MMD12E-X0E08 S# 0638N135692

Quantity 1: LIEBERT C U M# PFH014A-PL3 S# 0639N135933

ST

Floor Training:

Quantity 1: STULTZ CU w/PUMP PACKAGE M# FSS211AVG S# EO9K4903001001

Quantity 1: FHP-AC 1 M# EC096-4HZC S# SK127153

Quantity 1: FHP-AC 2 M# EX096-4HZC S# SK127154

Quantity 1: FHP-AC 3 M# EC072-4HZC S# SK127198

Floor LAN:

Quantity 1: CARRIER AHU M# FB4CNF024 S# 0212A68082

Quantity 1: CARRIER CU M# 24ABB324W0031010 S# 0212A68082

5. Please provide complete equipment list for all equipment to be included in the preventative maintenance proposal.

Answer 5: Equipment List by Location to quote on preventative maintenance. All old and new equipment that gets replaced in the option years will need to be covered in the preventative maintenance plan.

Document Title

Replacement and Maintenance of HVAC Units at Herndon, VA Centers

Floor LAN Room: Replacing Equipment at the time of award

Quantity 1: New Roof Top Unit M# New S# New

Quantity 1: New Roof Top Unit M# New S# New

Quantity 1: New Unit M# New S# New

Quantity 1: New Unit M# New S# New

Floor Phone Room: Replace Equipment within 1-3 years (Base Year to Option Year 2)

Quantity 1: LIEBERT AHU M# MMD12E-X0E08 S# 0638N135692

Quantity 1: LIEBERT C U M# PFH014A-PL3 S# 0639N135933

Floor Training: Replace Equipment within 2-5 years (Option Year 1 to Option Year 4)

Quantity 1: STULTZ CU w/PUMP PACKAGE M# FSS211AVG S# EO9K4903001001

Quantity 1: FHP-AC 1 M# EC096-4HZC S# SK127153

Quantity 1: FHP-AC 2 M# EX096-4HZC S# SK127154

Quantity 1: FHP-AC 3 M# EC072-4HZC S# SK127198

Floor LAN: Replace Equipment within 2-5 years (Option Year 1 to Option Year 4)

Quantity 1: CARRIER AHU M# FB4CNF024 S# 0212A68082

Quantity 1: CARRIER CU M# 24ABB324W0031010 S# 0212A68082

6. The scope of work does not specify intervals for preventative maintenance. Will the PM intervals be monthly, quarterly or other? Please advise.

Answer 6: The preventative maintenance shall be performed on a quarterly schedule. For new equipment that is being proposed the government anticipates a quarterly maintenance schedule unless the manufactory recommendation is different. If you are not proposing a quarterly plan please specify why.

7. For cost savings, it is our recommendation to provide like kind replacement equipment. This may allow reuse of power, piping and ductwork. However, if replacement equipment capacity is changed, design and engineering may be required (at an additional cost) to ensure the room temperature requirement is met.

How would you like us to proceed?

Answer 7: The government would like the equipment that is proposed to be at least equivalent if not better (like kind replacement) than what is currently in place. The capability of the system should not be less than what is currently in place.

8. Please confirm if existing piping, electrical and appurtenances is in suitable condition, it may be reused?

Answer 8: At this time all existing piping, electrical and appurtenances is in suitable condition. If piping, electrical, and/or appurtenances is reused, then contractor assumes all responsibility and agrees to warranty reused parts as though installed new along with new equipment.

9. Shall we include cut, patch and paint of drywall if required?

Answer 9: Yes, you should include cut, patch and paint of drywall if required.

Document Title

Replacement and Maintenance of HVAC Units at Herndon, VA Centers

10. Existing DDC/BAS integration is assumed to be disconnected/reconnected by others. Please confirm/advise.

Answer 10: This is not applicable to this job. All equipment is above standard and does NOT tie into the base building energy management system.

11. It is assumed the Halon Fire Protection System will be taken in and out of service by others. Please

Answer 11: SBA will contact BFPE to take Halon system in 6 floor LAN room down for the duration of the 6 floor equipment replacement.

12. If it is determined that a crane will be needed to set roof equipment, will an FAA permit or other specialty procedures be required?

Answer 12: No FAA permit or other specialty procedures will be required

13. We recommend preventative maintenance for the new 6th floor equipment to start upon installation and the performance period to end March 20, 2018. Preventative maintenance for equipment on floors 1, 5 and 6, as defined in scope of work, would then start for same performance period. Please

Answer 13: The 6 floor equipment maintenance can begin at the time that the 6 th floor LAN room equipment is installed with successful system start-up. For the 1 st and 5 th floors your quote must include the maintenance starting March 21, 2018 through the remainder of the base year (approximately June 19, 2018, 1 year from date of award) and the option years. The 6 th floor will have the new equipment that will be maintained from the beginning of the award. Since the 5 th and 1 st Floor equipment replacement is optional your quote must be priced with both the cost to maintain the current systems and the cost of what the new systems will be.

14. We did not know of the RFP prior and missed the deadline for the walkthrough. I was wondering if we could coordinate a visit to come by and look at the units to be replaced?

Answer 14: At this time the government is not having another walk through.

15. We would like to request Liebert Corporation and STULZ Air Technology Systems, Inc. as an approved equipment suppliers?

Answer 15: The government would like the equipment that is proposed to be at least equivalent if not better than what is currently in place. The capability of the system should not be less than what is currently in place.