Preparation and Bottling of Coal
Solicitation number
SB1341-17-RQ-01910
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
SRM_2693a_Processing_and_Bottling_Checklist__FINAL.xlsx XLSX spreadsheet
Provisions_and_Clauses.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

I. BACKGROUND

The National Institute of Standards and Technology (NIST) has four (4) drums of bituminous coal [approximately 500kg (1100 lb.)] that require air drying, crushing, pulverization, screening, and subsequent spin-riffling into bottles for a renewal coal Standard Reference Material (SRM). New coal material is required for this renewal SRM (SRM 2693a) because all reserve material for the replacement SRM has run out. The renewal coal material comes from a similar source as SRM 2693 (Nominal 0. 5 % S from Line Creek Mine, British Columbia, CA).

II. SCOPE OF WORK

The goal of this project is to package the coal material so that it is ready for delivery to the NIST customer. The intention is to issue the coal material as a NIST SRM, and preparation of a bottled material with negligible heterogeneity (within the inherent limitations of heterogeneity in the processed coal matrix) is an important consideration. The specific objectives of this project require the entire lot of coal material to be air-dried, crushed, pulverized, screened and then spin-riffled into eight (8) equal portions. Several of the eight (8) portions shall be combined and then split (by spin riffling) into sublots that shall be spin-riffled into a minimum of 2500 bottles and not-to-exceed 4500 bottles. The remaining portions that are not bottled shall be placed in separate drums with liner and shall be readied for shipment to NIST. The shipping of the drums, packaged bottles, and requested residual material will be paid for by NIST.

III. SPECIFIC TASKS

1.NIST will provide to the Contractor four (4) drums of bituminous coal [approximately 500 kg (1100 lb.)] and between 2500 and approximately 4500 capped bottles. The Contractor shall bottle at least 2500 bottles and no more than 3000 bottles in accordance with line item 1 of the price schedule. If option line item 2 of the price schedule is exercised, the Contractor shall bottle an additional 1000 to 1500 bottles (for a total of at least 3500 and no more than 4500 bottles). The number of bottles sent by NIST will be in excess of the number of bottles specified in the quotation. The number of bottles will be a minimum of 2500 and shall not exceed 4500, and will depend on the number of positions in the spin riffler the Contractor uses for bottling, the number of runs of the spin riffler the Contractor proposes to bottle, and whether option line item 2 to process additional bottles is exercised. In addition, an excess number of bottles (325) will be shipped to allow for any breakage, bottle material wastage, and to serve as spacers to replace bottles pulled for a special shipment. The four (4) drums of coal material and packaged bottles will be shipped to the Contractor from NIST.
2.The Contractor shall send all requested information (e.g., notifications, measurement data, and reports) to the NIST technical point of contact (TPOC) via email once it is obtained.
3.The Government reserves the right to be present at the Contractor’s site to witness the preparation and packaging. The Contractor shall notify the NIST TPOC of the tentative preparation and packaging schedule at least 8 business days prior to the scheduled start of the crushing of the coal so that a NIST representative can plan travel. All travel and per diem conducted by a NIST representative shall be at NIST’s expense.
4.The Contractor shall air-dry the gross coal sample in accordance with procedures in ASTM D3302 and report the initial and air-dried gross sample mass and conformance to ASTM D3302 to the NIST TPOC. The Contractor shall then crush and pulverize the gross sample (approximately 500 kg) to 100 % passing a 212 µm (No. 70) sieve. The Contractor must screen all material at the specified size, saving any retained material for return to NIST in a sealed container. Prior to the subsequent blending, the Contractor shall report to the NIST TPOC the gross sample mass remaining after sieving.
5.The Contractor shall blend all of the coal that passes a 212 µm (No. 70) sieve, approximately 500 kg, by recombining opposite portions produced by the spin riffler or by an appropriate sized blender. The blending procedure must be designed to ensure that the material is well-mixed.
6.The Contractor shall spin riffle the screened and blended material into eight (8) equal splits and weigh each split and report the mass of each split to the NIST TPOC. For an initial assessment of homogeneity, the Contractor shall:

· Take one (1) grab sample of approximately 25 g from each of the eight (8) splits and perform duplicate moisture (mass loss at 107 C), sulfur (as received and dry-mass basis), and ash (as received and dry-mass basis) measurements on test portions of each grab sample in accordance with ASTM standard procedures.

· Record the determined ash values to the nearest 0.01 % and the moisture and sulfur values to the nearest 0.001 %.

· Test portions taken for moisture shall be taken at the same time as analytical test portions that need to be corrected to a dry mass basis using that moisture measurement.

· Report the mass of each of the eight (8) splits (before removal of the grab samples) and the measurement data for each grab sample duplicate test portion (8 X 2 = 16 total measurements for each constituent measured), including its initial mass (to the nearest 1 g), to the NIST TPOC. The NIST TPOC will have three (3) business days to review the measurement results to assess if the initial homogenization of the material is acceptable. This assessment will be based on a statistical test for differences between the splits using a hypothesis test done at the 5 % significance level. If the test does not detect differences between the splits, the initial homogenization will be deemed acceptable; otherwise, it will be deemed to be not acceptable.

7. If the NIST TPOC determines that the initial homogenization of the material is not acceptable, NIST may require that the Contractor either:

A. Bottle specific splits or B. Re-blend the material and then repeat the spin riffling, measurements, and reporting stated in TASK 6.

NIST will have three (3) business days to review the new measurement results to assess if the homogenization of the material is acceptable, based on the same type of statistical evaluation previously used. If the NIST TPOC determines that the homogenization of the material is still not acceptable, the Contractor and NIST TPOC shall reach an agreement on the acceptability of bottling of specific splits.

8. After the NIST TPOC has made a determination regarding the acceptability of the homogenization of the material, the Contractor shall identify the splits to be bottled and report the masses of each split (to the nearest 1 g) to the NIST TPOC. The Contractor shall determine if the total mass of the splits is suitable for providing the exact number of bottles specified in the contract. Once the Contractor makes this determination, it must stop all processing of the material and report on this determination of suitability to the NIST TPOC. This report shall include the total mass of material to be bottled, the number of sublots, the number of runs of the spin riffler, the number of bottles in each sublot and run (which shall be the same for each sublot and run), and the estimated average mass that the bottles shall contain.

Processing of the material shall not resume until a written bottle production and measurement plan (hereafter referred to as the “bottling plan”) to produce the bottles and perform measurements for acceptability testing is agreed to between the Contractor and NIST TPOC. The Contactor shall be responsible for writing this bottling plan in consultation with the NIST TPOC. The plan shall conform to the conditions specified in TASK 9. The NIST TPOC will have three (3) business days after receipt of the written bottling plan from the Contractor to approve the written bottling plan or request changes. If the NIST TPOC requests changes to the bottling plan, the Contractor shall have two (2) business days to approve the NIST requested bottling plan or request additional changes. If the Contractor requests additional changes, the Contractor and the NIST TPOC shall agree on a final bottling plan for producing the specified number of bottles within two (2) business days.

9.In the written bottling plan that will be agreed to and documented after the Contractor has stopped processing the material, as specified in TASK 8, the Contractor shall identify and track bottles throughout the bottling and packaging process until all bottles are sealed in shipping containers. In addition, the Contractor shall include in this plan documentation on the test portions to be removed to perform measurements for acceptability testing and how these measurements will be conducted. The number of bottles removed and the number of replicate test portions measured will depend on the total number of bottles produced and the total number of sublots. The total number of runs of the spin riffler shall be no more than 50 and the total number of bottles in a run of the spin riffler shall be at least 90. This plan written by the Contractor shall include the following:
A.Documentation of the procedure for identifying each empty capped bottle designated to be filled with coal material and recording the empty mass of the capped bottle that includes identification of the contents of each bottle. Identification shall be applied to the cap only; no identification may be applied to the glass bottle.
B.Brief documentation of how each capped bottle shall be labelled with the sublot number, run number within that sublot, and the order of filling within the run (e.g., identification on adhesive sticker on cap such as 4-2-95). Each sublot must represent a split produced in the final division by spin riffling performed according to TASK 6 and the number of positions in the spin riffler equals the number of bottles in each run of material. This labelling cannot be applied to the glass bottle itself and shall remain with each bottle that is shipped. Labelling shall be legible when delivered to NIST.

Note: The Contractor needs to take precautions such that the label will not be smeared, smudged, or removed by the alcohol wipe of the filled bottle, as specified in TASK 13 below.

C.Documentation of the procedure for tracking each bottle and monitoring the fill mass to make sure that each bottle contains between 50 grams and 57 grams, to maintain sufficient headspace to allow for mixing of the contents in the bottles provided. The minimum specifications to meet the fill mass task are that at least 98 % of the bottles shall contain at least 50 g and no more than 57 g of coal material (50 g ≤ 98 % of bottles fill mass ≤ 57 g). Within this task, at least 99 % of the bottles shall contain 57 g or less (< 1 % of the bottles contain more than 57 g).
D.Documentation of the number of bottles to be filled, the number of sublots, the number of runs in each sublot, the number of bottles in each run, the number of containers (e.g., boxes) of bottles (and number of bottles in each container) that shall be shipped. The containers shall include a subset of container(s) for a special shipment, as specified in TASKS 17, 18, and 19 below.
E.Documentation on the test portions to be removed to perform measurements for acceptability testing and how these measurements shall be conducted (which shall depend on the total number of bottles produced and the total number of sublots and runs). NIST will provide the Contractor with a listing of the order in which the test portions will be taken based on a random-sampling design. NIST will provide this listing to the Contractor no later than 5 business days after its receipt of the spreadsheet that the Contractor sends to the NIST TPOC as part of TASK 11 below.

This documentation shall include:

i. The constituents to be measured, which shall be moisture (mass loss at 107 C), sulfur (as received and dry-mass basis), and ash (as received and dry-mass basis).

ii. The ASTM standard method(s) that shall be used to perform the measurements.

iii. The nominal mass of the test portion for each constituent.

iv. The number of bottles that shall be removed for measurement (NIST will specify at least 24 and no more than 50, depending on the number of bottles, sublots, and runs) and the sublot, run, and position in that run for each bottle (selected by a random sampling approved by NIST).

v. The number of replicate test portions to be taken from each bottle (NIST will specify at least 2 and no more than 4, depending on the number of bottles, sublots, and runs).

vi. The total number of measurements to be performed for each constituent, which shall be calculated from the number of bottles measured and the number of replicates taken from each bottle (NIST will specify at least 48 and no more than 100, depending on the number of bottles, sublots, and runs).

vii. Assignment of each specific measurement of a test portion to an analytical run and the position in that run (e.g., sublot 4, run 2, bottle 95, replicate 2, sulfur run 2, position 6), as specified by NIST.

viii. A statement regarding whether each analysis is performed in one continuous run or multiple runs and how drift during the analysis is to be monitored and quantified. Ideally, all analyses for a particular analyte should be performed in one continuous run. For homogeneity analyses, the calibration of the instrumentation is not critical; however, controls need to be in place to monitor any instrument drift.

ix. A description of how the Contractor will apply corrections to a dry-basis.

10. After a bottling plan to produce the specified number of bottles has been agreed to and any additional splits (if any) required by that plan have been completed, the Contractor shall separate the material that it will bottle from the material that it will not bottle. The Contractor shall place each of the spin-riffled splits of material that will not be bottled into double-lined bags (each liner must be ≥ 4mm thickness). The Contractor shall secure each liner with zip-ties or another bag closure that minimizes any air within the bag and place the liner in a lined drum (liner must be ≥ 4mm thickness). The coal material shall not be exposed directly to the drum.

Option Line Item 0003: The Offeror shall package the splits of material that will not be bottled using an alternative to the packaging specified in TASK 10, as long as the coal material is packaged in a primary liner of Mylar or plastic that is ≥ 4 mm thickness and the secondary liner is ≥ 4 mm thickness.

An alternative that includes packaging of non-bottled splits as nominal 20 lb. to 30 lb. (10 kg to 15 kg) units in sealed containers shall be considered by NIST to be technically acceptable. Furthermore, an alternative that includes sealing the non-bottled splits under argon inside sealed aluminized bags (e.g., Mylar) is preferable to NIST, however other packaging methods will be considered. Additional costs, if any, for implementation of these alternatives, shall be factored into the fully burdened unit price for CLIN 0003.

The Contractor shall report to the NIST TPOC how the splits that were not bottled were packaged and the net mass of coal material, to the nearest gram, in each of the packaged splits.

11.The Contractor shall identify each empty capped bottle to be filled following the procedure documented in TASK 9A. Identification of each bottle with the sublot number, run number, and the order of filling within the run cannot be applied in this step unless it conforms to the procedures documented in both TASKS 9A and 9B. If this identification of each bottle with the sublot number, run number, and the order of filling within the run does not conform to the procedures documented in both TASKS 9A and 9B, it shall be applied after the alcohol wipe described in TASK 13; however, a procedure must be in place to track the identity of each bottle for which an empty mass has been recorded. The Contractor shall record the mass of each empty capped bottle that has been marked with identification (to the nearest 0.01 g) in a spreadsheet and send an electronic copy of the spreadsheet to the NIST TPOC.
12.The Contractor shall process the remaining splits [approximately 150 kg to 270 kg (approximately 330 lbs. to 600 lbs.), depending on the number of bottles specified in the quotation] of the coal material by spin riffling all of this coal material into the number of sublots needed for bottling the number of bottles specified in the quotation. The coal material in each sublot shall be spin riffled into bottles so that each bottle (must use pre-cleaned bottles and caps supplied by NIST) contains at least 50 grams and no more than 57 grams, while maintaining sufficient headspace in each bottle to allow for mixing of its contents, as specified in TASK 9C. Each sublot must represent a split produced in the final division by spin riffling. The Contractor shall notify the NIST TPOC on the number of bottles filled, the number of sublots, the number of runs in each sublot, and the number of bottles in each run (the number of bottles in each sublot and each run shall be the same for each sublot and each run). Bottles shall be filled by spin riffling only. Coal material shall not be added to any bottle by methods other than spin riffling. Coal material shall not be removed from any bottle other than for removal of test portions for testing to meet stated requirements, as specified in the bottling plan.
13.After each bottle is filled and its cap secured, the Contractor shall wipe clean the exterior of each filled bottle and its cap with alcohol. After residual alcohol on the bottle and cap has dried, the contractor shall record the mass of the capped bottle filled with coal material (to the nearest 0.01 g). The contractor shall record the gross mass of each capped bottle (capped bottle filled with coal material, to the nearest 0.01 g) in the spreadsheet containing the empty mass of each capped bottle (TASK 11) and, within that spreadsheet, calculate net mass of coal material in each bottle (to the nearest 0.01 g).
14.The Contractor shall label each bottle by sublot number, run number, and bottling order within the run, as specified in TASK 9B, if this label has not been applied yet. The contractor shall add the identifying information on this label to the spreadsheet containing the bottle fill order and masses in a manner such that the fill order number and its corresponding identifying sublot number, run number, and bottling order in the run are matched together with the determined and calculated masses. The contractor shall send an electronic copy of the updated spreadsheet to the NIST TPOC.
15.The Contractor shall store (away from dust or contamination) all labelled bottles in one of the containers (boxes) in which they were shipped (unless the container is not usable) according to fill order, and clearly identify the contents of each shipping container (e.g., sublot number, runs numbers, and bottles within the runs) on the top and at least one side on the shipping container. A paper or plastic based container other than the box in which the bottles were shipped from NIST is acceptable if it does not increase the likelihood of bottle breakage. Packaging the bottles from each run in separate containers is also acceptable. The Contractor shall notify the NIST TPOC on the total number of bottles and the number of containers of bottles.
16.The Contractor shall remove the first and last bottles filled and one (1) bottle each from two (2) different middle sublots (4 bottles total) and record the net mass of each bottle (to the nearest 0.01 g) and replace each bottle with an empty upside-down bottle in the shipping container. Then the contractor shall perform a screen test on the contents of each bottle at the exact sieve size specified in the contract [212 µm (No. 70) sieve], with the % retained on the sieve screen and % passing through to be reported to the NIST TPOC, along with the net mass (prior to performing the screen test), for each bottle. The contractor shall retain the residual contents of these bottles until NIST has received and accepted all of the prepared coal material (i.e., drums and filled bottles).
17.The Contractor shall remove the bottles specified for measurement in the bottling plan approved by NIST from the shipping container (replacing each removed bottle with an empty upside down bottle) and remove the measurement test portions from the bottles, as specified in the bottling plan. The number of bottles removed and number of replicate test portions measured will depend on the total number of bottles produced and the total number of sublots and runs. The Contractor shall perform measurements of moisture, sulfur, and ash as specified in the bottling plan and report all of the measurement data, for each test portion, to the NIST TPOC. The contractor shall report the determined moisture, sulfur, and ash values to the nearest 0.001 % and all results obtained to monitor and quantify drift during the analytical process. NIST will review this measurement data to determine if the material shows statistically significant signs of heterogeneity (as specified below) and the NIST TPOC will report back to the Contractor, within 6 business days of receipt of the measurement data. The NIST determination on whether the material shows signs of heterogeneity will be based on the results of a statistical test for differences between bottles at the 5 % significance level. The Contractor shall retain these bottles and residual coal material in them until testing is completed. After NIST has notified the Contractor that the material meets the homogeneity criteria, the contractor shall prepare these retained bottles for shipment in a separate container, along with the special shipment noted in TASK 19.
18.Not more than 4 business days after the Contractor has completely reported, to the NIST TPOC both:

A. the number of bottles filled, the number of sublots, the number of runs in each sublot, the number of bottles in each run, and the number of containers of bottles that the Contractor shall ship, and B. all of the measurement data, for each test portion, as specified in the bottling plan.

The NIST TPOC will provide the Contractor with a list of the exact bottles (noted by sublot number, run number, and fill order in the run) that NIST is requesting that the Contractor pull for special shipment. The number of bottles requested for special shipment shall not exceed 300. NIST may request that the bottles be shipped to NIST and another location, as noted in TASK 19.

19.No later than 3 business days after the NIST TPOC has reported to the Contractor that statistically significant signs of heterogeneity have not been detected, the Contractor shall pull the exact bottles (noted by sublot number, run number, and fill order in the run) that the NIST TPOC has requested for special shipment and ready them for shipment. The Contractor shall replace each bottle pulled from the shipping container with an empty upside-down bottle. If NIST has provided the Contractor with the package(s) to ship these pulled bottles, the Contractor must use that package(s). The Contractor shall notify the NIST TPOC on the number of containers in the special shipment, including the container of bottles used for the measurements to determine the degree of homogeneity, that shall be shipped with an itemized list that includes the gross weight of each container, and the total weight of the shipment. The Contractor shall ship, to NIST and possibly one other location (Quality Associates International Ltd., 6940 Mount Richardson Road, Sechelt BC V0N 3A4), the special shipment container(s) of bottles, packaged in a manner to minimize breakage of the bottles. The Contractor will arrange for pick-up and pay shipping costs.
20.The packages of bottles containing the coal material from the spin-riffled sublots, the other spin-riffled splits (in double lined bags inside lined drums), and the sealed container with any retained material from the screening performed in TASK 4, shall be readied by the Contractor for shipment to NIST. No later than eight (8) business days after the NIST TPOC has reported to the Contractor that statistically significant signs of heterogeneity have not been detected, the Contractor shall notify the NIST TPOC on the number of containers of bottles and drums that shall be shipped to NIST (in this second shipment) with an itemized list that includes the gross weight of each item and the total weight of the shipment. The Contractor will arrange for pick-up and pay shipping costs.
21.All of the bottles for special shipment to NIST and possibly one other location, shall be shipped by the Contractor within seventeen (17) weeks of the Contractor receiving, from NIST, the four (4) drums of bituminous coal described in TASK 1.
22.The Contractor shall be responsible for completing all required work, sending all reports on measurement data and results to NIST, and shipping all remaining material to NIST, within nineteen (19) weeks of the Contractor receiving, from NIST, the four (4) drums of bituminous coal described in TASK 1. This nineteen (19) week period fully takes into account the time required to complete all of the contract requirements, including the extra time that might be required for NIST to review measurement results and modifications to the processing (e.g., re-blending that might be required based on TASKS 6 and 7).
23.The Contractor must take precautions to minimize losses to breakage or other accidents and shall report the loss of any filled bottles to the NIST TPOC within two (2) business days of the loss.

IV. DELIVERABLES

Please note that if NIST fails to provide material(s) necessary to perform a required task by the contractually-stated timeframes, the deliverable due date may be extended accordingly (without a contract modification) to allow additional time equivalent to the Government delay. In the event of a dispute between the contractor and the NIST TPOC regarding the cause of a delay, the Contracting Officer will provide a written determination as to the accurate deadlines.

1.Notification of the tentative preparation and packaging schedule at least eight (8) business days prior to the scheduled start of the crushing of the coal (TASK 3).
2.All measurement data reported to the NIST TPOC via email including:

A. Initial and air-dried gross mass (TASK 4).

B. Gross sample mass remaining after sieving (TASK 4).

C. Mass of each of the eight (8) spin-riffled splits (TASK 6).

D. Mass loss, sulfur, and ash for test portions taken from grab samples (TASK 6).

E. Mass of packaged splits not bottled (TASK 10).

F. Mass of each empty capped bottle that has been marked with identification (TASK 11).

G. Mass of each capped bottle filled with coal material and net mass of coal in each bottle with its corresponding label identification of sublot number, run number, and order in run (TASKs 13 and 14).

H. Screen test results for four (4) bottles (TASK 16).

I. Mass loss, sulfur, and ash for test portions taken from bottles so that NIST can determine if the material has statistically significant degree of heterogeneity (TASK 17).

3.Report on the splits to be bottled, the mass of each split, and whether the total mass of the splits is suitable for providing the exact number of bottles specified in the quotation (TASK 8).
4.Report on the plan to produce the bottles in consultation with NIST (TASK 8).
5.Report on any changes to the bottling plan that the Contractor deems necessary to produce the specified number of bottles (TASK 8).
6.Documentation on the procedure for marking with identification the empty capped bottles designated to be filled with coal material and recording the empty mass (TASK 9A).
7.Documentation on the procedure for labelling each capped bottle containing coal material with its sublot number, run number, and fill order within that run (TASK 9B).
8.Documentation on the procedure for tracking bottles and monitoring their fill mass (TASK 9C).
9.Documentation on the number of bottles to be filled, the number of bottles in each sublot, the number of runs in each sublot, the number of bottles in each run, the number of shipping containers, the number of bottles in each shipping container that shall be shipped to NIST, the number of drums, the gross weight of each item shipped, and the total weight of each shipment (TASK 9D).
10.Report on the number of bottles filled, the number of sublots, the number of runs in each sublot, and the number of bottles in each run (TASK 12).
11.Report on the total number of bottles and the total number of containers (TASK 15).
12.Report on the number of containers in the special shipment that shall be shipped to NIST and possibly one other location with an itemized list that includes the gross weight of each item, and the total weight of the shipment (TASK 19).
13.Report on the number of containers of bottles and the number of drums that shall be shipped to NIST (second shipment with remaining material) with an itemized list that includes the gross weight of each item, and the total weight of the shipment (TASK 20).
14.Report on the loss of any filled bottle (TASK 23).
15.Delivery of the number of bottles specified in the quotation containing between 50 grams and 57 grams each. The bottles shall be packaged in a suitable container [e.g., 180 capped bottles in three (3) layers of 60 bottles each, all separated from each other by paper or cardboard inside a cardboard box]. Bottles pulled from the container to meet stated requirements shall be replaced with empty upside down bottles. Bottles of coal material shall be packaged and shipped as specified in TASKS 17, 19, 20, and 21.
16.Delivery of spin-riffled splits of non-bottled coal material in secured liners in lined drums.
17.Delivery of all material after air drying, crushing, pulverizing, and screening that remains on the sieve.

V. DELIVERABLE DUE DATES AND PLACE OF PERFORMANCE

NIST will deliver the coal within 10 business days after award. Delivery of all coal material to NIST shall be 19 weeks after receipt of drums of bituminous coal from NIST.

All work shall take place at the Contractor’s (or subcontractor’s) facility. Any work not performed at the Contractor’s facility must be documented, including identification of the facility and the work performed.

The attached timeline summarizes the deliverable due dates.

VI. STANDARDS FOR ACCEPTANCE OF DELIVERABLES

In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.

Inspection and Acceptance Prior to final acceptance and complete payment by NIST, all of the following requirements shall be met:

1.The net mass of 98 % of the bottles of coal shall be between 50 grams to 57 grams of material.
2.The NIST TPOC will inspect the bottles and drums of coal material upon arrival at NIST. Bottles will be inspected to assess whether the correct number of bottles were delivered based on what was reported and that, for at least 98 % of the bottles, the mass of coal in each bottle is between 50 grams to 57 grams and at least 99 % of the bottles shall contain 57 grams or less (< 1 % of the bottles contain more than 57 grams), with sufficient headspace to allow for mixing of the contents.
3.The drums will be inspected to assess that the correct number of drums were returned, that the coal has been spin-riffled, and the contents of the lined bags agrees with the contractor’s report.
4.In addition, acceptance of the material will be based on the results of the screening and data reported by the contractor, including determination of signs of heterogeneity based on the results of a statistical test for differences between bottles at the 5 % significance level.

Partial payments (up to 3 total payments) are authorized for completion of tasks as accepted by the Government in accordance with the acceptance criteria and established CLIN pricing. If requested by the Contractor, the Government will make partial payments for completing tasks as follows:

1. Partial payment of 20 % of the total award with completion up through TASK 6 (All crushed and pulverized coal has been blended into eight splits and first set of analytical measurements reported to NIST).

2. Additional payment of 20 % of the total award with completion up through TASK 17 (All coal has been bottled but final analytical measurements have not yet been made).

3. Final payment (remaining 60 %) upon final acceptance.

VII. GOVERNMENT FURNISHED PROPERTY

As stated in section III, Task1, the Government will provide the following item(s) of Government property to the Contractor.

1.Within 10 business days after an award, drums of bituminous coal [approximately 500 kg (1100 lb.)]. Any unused coal shall be returned to the Government prior to the end of this contract. The Contractor shall package the coal to minimize leakage from the primary container.
2.Within 30 business days after an award, the Government will provide the following item(s) of Government property to the Contractor. Pre-cleaned amber 125 mL (4 oz.) glass bottles and screw caps. These bottles have the following approximate dimensions: 10 cm ht., 2 cm ID mouth, and 4.5 cm OD base. NIST will ship sufficient amber glass bottles to the Contractor for spin-riffle bottling. An excess number of bottles (325) will be shipped to allow for any breakage, bottle material wastage, and to serve as spacers to replace bottles pulled for a special shipment.

All property, data, and information provided by the Government in the performance of this contract remain the property of the Government and shall be surrendered to the Government upon completion or termination of this requirement. Likewise, all deliverables generated under this requirement remain the property of the Government.

VIII. DELIVERY

Delivery shall be FOB ORIGIN, and be completed in accordance with the due date stated in Section IV, Deliverables, above.

Delivery Address:

National Institute of Standards and Technology Shipping and Receiving Building 301 100 Bureau Drive Gaithersburg, MD 20899-8391

IX. SHIPPING

The Contractor shall refer to TASKS 19, 20, and 21 above for shipping instructions. The Contractor will arrange for pick-up and pay shipping costs.