FormSF1449.pdf
PDF 7 MB Posted
- Attached to
- Pure and Ultra-Pure Water System PM & Repair
- Solicitation number
- SB1341-17-RP-0041
About this file
The RFP SF1449 contains other important documents (i.e. experience form, past performance form, Q&A form, Instructions to Offerors etc.)
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ IFB RFP
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODEFACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATE . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
17a CONTRACTOR/
OFFEROR.
CODE
8 (A)
SIZE STANDARD:
NAICS:
% FOR:SET ASIDE:UNRESTRICTED OR
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
10. THIS ACQUISITION IS
EDWOSB
SMALL BUSINESS PROGRAM
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 3 OF 95 SB134117RP0041
THIS IS A COMBINED SYNOPSIS SOLICITATION
0001 BASE:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Pure Water System in Building 81 IAW the PWS.
PR NUMBER: NB194000-17-02257
DELIVERY DATE: 09/30/2018
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2017 to 09/30/2018
1.00 YR
NTE NTE
0002 BASE:
Provide repairs for the Pure Water System IAW the PWS.
NTE $20,000.00
PR NUMBER: NB194000-17-02257
DELIVERY DATE: 09/30/2018
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2017 to 09/30/2018
1.00 YR
0003 BASE:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Ultra-Pure Water System in Building 81 IAW the PWS.
PR NUMBER: NB194000-17-02257
DELIVERY DATE: 09/30/2018
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2017 to 09/30/2018
1.00 YR
NTE NTE
0004 BASE:
Provide repairs for Ultra-Pure Water System IAW the
PWS.
NTE: $20,000.00
PR NUMBER: NB194000-17-02257
DELIVERY DATE: 09/30/2018
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2017 to 09/30/2018
1.00 YR
OPT
1001 OPTION YEAR I: 1.00 YR
PAGE 4 OF 95 SB134117RP0041
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Pure Water System in Building 81 IAW the PWS.
DELIVERY DATE: 09/30/2019
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2018 to 09/30/2019
NTE NTE/OPT
1002 OPTION YEAR I:
Provide repairs for the Pure Water System IAW the PWS.
NTE $20,000.00
DELIVERY DATE: 09/30/2019
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2018 to 09/30/2019
1.00 YR
OPT
1003 OPTION YEAR I:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Ultra-Pure Water System in Building 81 IAW the PWS.
DELIVERY DATE: 09/30/2019
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2018 to 09/30/2019
1.00 YR
NTE NTE/OPT
1004 OPTION YEAR I:
Provide repairs for Ultra-Pure Water System IAW the
PWS.
NTE: $20,000.00
DELIVERY DATE: 09/30/2019
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2018 to 09/30/2019
1.00 YR
OPT
2001 OPTION YEAR II:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Pure Water System in Building 81 IAW the PWS.
DELIVERY DATE: 09/30/2020
SHIP TO:
PAGE 5 OF 95 SB134117RP0041
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2019 to 09/30/2020
NTE NTE/OPT
2002 OPTION YEAR II:
Provide repairs for the Pure Water System IAW the PWS.
NTE $20,000.00
DELIVERY DATE: 09/30/2020
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2019 to 09/30/2020
1.00 YR
OPT
2003 OPTION YEAR II:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Ultra-Pure Water System in Building 81 IAW the PWS.
DELIVERY DATE: 09/30/2020
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2019 to 09/30/2020
1.00 YR
NTE NTE/OPT
2004 OPTION YEAR II:
Provide repairs for Ultra-Pure Water System IAW the
PWS.
NTE: $20,000.00
DELIVERY DATE: 09/30/2020
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2019 to 09/30/2020
1.00 YR
OPT
3001 OPTION YEAR III:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Pure Water System in Building 81 IAW the PWS.
DELIVERY DATE: 09/30/2021
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2020 to 09/30/2021
PAGE 6 OF 95 SB134117RP0041
NTE NTE/OPT
3002 OPTION YEAR III:
Provide repairs for the Pure Water System IAW the PWS.
NTE $20,000.00
DELIVERY DATE: 09/30/2021
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2020 to 09/30/2021
1.00 YR
OPT
3003 OPTION YEAR III:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Ultra-Pure Water System in Building 81 IAW the PWS.
DELIVERY DATE: 09/30/2021
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2020 to 09/30/2021
1.00 YR
NTE NTE/OPT
3004 OPTION YEAR III:
Provide repairs for Ultra-Pure Water System IAW the
PWS.
NTE: $20,000.00
DELIVERY DATE: 09/30/2021
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2020 to 09/30/2021
1.00 YR
OPT
4001 OPTION YEAR IV:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Pure Water System in Building 81 IAW the PWS.
DELIVERY DATE: 09/30/2022
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2021 to 09/30/2022
1.00 YR
NTE NTE/OPT
4002 OPTION YEAR IV:
Provide repairs for the Pure Water System IAW the PWS.
NTE $20,000.00
PAGE 7 OF 95 SB134117RP0041
DELIVERY DATE: 09/30/2022
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2021 to 09/30/2022
OPT
4003 OPTION YEAR IV:
Provide Monthly, Semi-Annual, and Annual Preventative Maintenance on the Ultra-Pure Water System in Building 81 IAW the PWS.
DELIVERY DATE: 09/30/2022
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2021 to 09/30/2022
1.00 YR
NTE NTE/OPT
4004 OPTION YEAR IV:
Provide repairs for Ultra-Pure Water System IAW the
PWS.
NTE: $20,000.00
DELIVERY DATE: 09/30/2022
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
325 BROADWAY
BOULDER CO 80305-3328
FOB : Destination Period of Performance: 10/01/2021 to 09/30/2022
Table of Contents
PAGE 8 OF 95 SB134117RP0041
SECTION
. 1 Performance Work Statement & Section 15485
. 2 WD Under SCA 15-5415 Rev.5 Dated 7/25/17
. 3 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
. 4 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
. 5 Addendum - Instructions to Offerors
. 6 Question Form
. 7 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (JAN 2017)
. 8 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (JAN 2017)
. 9 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
. 10 52.233-3 PROTEST AFTER AWARD (AUG 1996)
. 11 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
. 12 52.237-1 SITE VISIT (APR 1984)
. 13 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)
. 14 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
. 15 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)
. 16 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)
. 17 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
. 18 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
. 19 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)
. 20 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)
. 21 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
. 22 Experience Form
. 23 Past Performance Questionaire Form
. 24 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--
COMMERCIAL ITEMS (JAN 2017)
. 25 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
. 26 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
. 27 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
. 28 52.222-48 EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR STANDARDS TO CONTRACTS
FOR MAINTENANCE, CALIBRATION, OR REPAIR OF CERTAIN EQUIPMENT--CERTIFICATION (MAY 2014)
. 29 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
. 30 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
. 31 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
. 32 1352.233-70 AGENCY PROTESTS (APR 2010)
. 33 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
. 34 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
. 35 NIST LOCAL-04 BILLING INSTRUCTIONS
. 36 CPARS and Invoicing Requirement
. 37 General Instructions for Working at NIST
PAGE 9 OF 95 SB134117RP0041
SECTION
. 1 Performance Work Statement & Section 15485
Performance Work Statement
Pure and Ultra-Pure Water Service Contract August 18, 2017
1. Introduction:
The National Institute of Standards and Technology (NIST) located in Boulder, CO has a state-of-the-art research precision measurement laboratory (PML) (named the Katharine Bloggett Gebbie Building) which supports the most sensitive research done at NIST.
Included in this building is Class 100 microelectronics fabrication facilities, called the Boulder Micro-Fabrication Facility (BMF). Among the many critical pieces of infrastructure in this laboratory are the pure water system (PW) in the instrument laboratories, and the ultra-pure water system (UPW) in the BMF.
2. Objectives:
NIST requires ongoing consistent and reliable product water quality of the buildings PW and UPW systems. The service of the water systems requires: minimal unscheduled downtime; complete scheduled maintenance performed in a timely manner per the provided specifications; a mechanism for repairs, replacements, necessary upgrades and unscheduled maintenance.
3. General:
Systems overview and specifications of water quality:
a. The tasks for the water system maintenance is divided between the PW and UPW, and are specified separately.
b. The maintenance of both water systems is based on the ASTM D5127-13 “Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries” and the methods and requirements of Submittal Section 15485 (see reference section).
1) The PW system must meet or exceed the CAP Type II (Resistivity: 2 MOhm/cm @ 25 C): College of American Pathologists Standards.
2) The UPW system must meet or exceed Electronic Type E-1 (Resistivity 18.1 MOhm/cm @ 25 C, without dissolved oxygen requirements): ASTM D-5127 standard.
4. Requirements:
The contractor shall:
1) Provide monthly, semi-annual, and annual PW system preventive maintenance including visual inspection and service as follows in sections 5a, 6, 8, and 10:
2) Provide monthly, semi-annual, and annual UPW system preventive maintenance including visual inspection and service as follows in sections 5b, 7, 9, and 11:
PAGE 10 OF 95 SB134117RP0041
3) Repairs, replacements, necessary upgrades and unscheduled maintenance to the PW and UPW systems.
5. Specifications for the Work:
a. The PW system consists of the following sub-system components:
a.1) PW Water softener (two membrane tanks, a brine tank, and controllers) a.1.a) Ecodyne Multiport Valve Softener a.2) PW Multimedia filter a.2.a) Ecodyne Multiport Valve Filter a.3) PW Activated carbon filter a.3.a) Ecodyne Multiport Valve Filter a.4) PW Reverse osmosis (RO) a.4.a) GE E4H Series Water Purification Machines a.4.b) Model Number: E4H-21K-DLX, 460, 6, 50-75 a.4.c) RO Pump 1 Model Number: SS2823G a.4.d) CIP Pump Model Number: SS2805AZ a.5) PW Continuous electrical de-ionizer (CEDI) a.5.a) Ion Pure LX a.5.b) Model Number: IP-LXM30X-3 a.6) PW storage tank a.7) PW re-pressurization pumps (two) a.7.a) Grundfos CRN64 a.7.b) Type: CRN64-2-1 A-G-G-V-KUHV a.7.c) Model: A96426505-P11104505 & A96423893P112370153 a.8) PW UV sterilization lamps (UV1) 254 nm a.8.a) Aquafine Corporation CSL a.8.b) Model Number: CSL-12R-60 a.9) PW filters (0.2 µm) a.9.a) Shelco MicroGuardian a.9.b) Model: 21FOS3-SB-316-222-3F-GB-E-UP a.10) PW sensors a.10.a) Supply pressure. For more information, please see Submittal
Section 15485 Section 2.14(see reference section) a.10.b) Supply resistivity. For more information, please see Submittal
Section 15485 Section 2.15(see reference section) a.11) Control PLC a.11.a) Allen-Bradley Panel View C600 a.11.b) Allen-Bradley Micro Logix 1400 a.11.c) Mettler Toledo Thornton M300 a.11.d) Mettler Toledo Thornton 770 Max a.11.e) For more information, please see Submittal Section 15485 Section
3.1-B (see reference section)
b. The UPW system consists of the following components:
b.1) UPW storage tank b.2) UPW re-pressurization pumps (two)
PAGE 11 OF 95 SB134117RP0041
b.2.a) Grundfos CRN10 b.2.b) Type: CRN10-05 A-FGJ-G-V-HUUV b.2.c) Model: A978597850791-P11107404 & A978597850791-
P11107405 b.3) UPW UV sterilization lamps (UV2) 254 nm b.3.a) Aquafine Corporation CSL b.3.b) Model Number: CSL-8R b.4) UPW resin bed deionizers b.5) UPW filters (0.2 µm) b.5.a) Shelco MicroGuardian b.5.b) Part Number: 3SFV3C22215TC25 b.6) UPW UV sterilization lamps (UV3) 185 nm b.6.a) Aquafine Corporation CSL b.6.b) Model Number: CSL-4R b.7) UPW filters (0.05 µm) b.7.a) Shelco MicroGuardian b.7.b) Part Number: 7SFN3SB22215TC2 b.8) UPW sensors b.8.a) Flow meter. For more information, please see Submittal Section
15485 Section 2.13 (see reference section) b.8.b) Pressure sensor. For more information, please see Submittal
Section 15485 Section 2.14 (see reference section) b.8.c) Output water resistivity. For more information, please see
Submittal Section 15485 Section 2.15 (see reference section) b.8.d) Return water resistivity. For more information, please see
Submittal Section 15485 Section 2.15 (see reference section) b.9) Total Organic Content Analyzer b.9.a) GE Sievers 500 RL On-Line TOC Analyzer
6. Scope of Work:
a. PW Monthly Maintenance:
1) Visually inspect, service, and maintain the PW system to include the subsystem components, which shall be completed no later than the first full week of each month.
a.1.a) The PW system must generate 14 gpm of purified water that meets or exceeds the CAP Type II (Resistivity: 2 MOhm/cm @ 25 C): College of American Pathologists Standards. The maintenance of these systems shall be based on the ASTM D5127-13 “Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries”.
a.2) For each listed subsystem components identified in Section 5a of this PWS, the contractor shall:
a.2.a) Inspect all serviceable components within the system as defined in the owner’s manual.
a.2.b) Visually inspect control valves and seals for signs of moisture and leaks and if present, repair the system to the ASTM D5127-13 standard.
PAGE 12 OF 95 SB134117RP0041
a.2.c) If any of the above, sensors, or readout electronics for required measurements are not in compliance with the manufacture’s recommended values, the contractor shall notify the COR and provide an estimate for the repair which will bring the system into compliance with the manufactures standard, ASTM D5127-13 standard, and the methods and requirements of Submittal Section 15485 (see reference section). All repairs or replacement of items shall be authorized by the Contracting Officer. Any repair or replacement work not authorized by the Contracting Officer is at the risk and expense of the contractor.
a.3) Record inlet and outlet hardness levels of the PW water softener (two membrane tanks, a brine tank, and controllers) subsystem. The outlet hardness must be maintained to a target level of <10 ppm hardness with an upper control limit of 17.1 ppm or 1.0 grain/gallon hardness.
a.3.a) Check the operation and salt level of the brine tank. NIST will add salt on a regular basis. If during inspection, salt level is low the vendor shall notify the COR and TPOC.
a.4) Record inlet and outlet chlorine levels of the PW activated carbon filter subsystem. The outlet chlorine levels must be maintained to a target level of
0.0 ppm total chlorine with an upper control limit of <0.05 ppm total chlorine.
a.5) Replace the two pre-filters of the PW reverse osmosis subsystem with filters as specified by the manufacturer. Verify that the system flushes automatically as specified by the manufacturer. If it does not, notify the
COR.
a.5.a) Record the following information for the PW reverse osmosis subsystem:
Inlet, outlet and differential pressure of the pre-filter Primary pump pressure Concentrate pressure System differential pressure Permeate Flow Concentrate Flow Percent Recovery Feed water temperature Feed water conductivity Product water conductivity Concentrate water conductivity Percent rejection a.6) Record the following information for the PW continuous electrical de-ionizer (CEDI) subsystem:
Feed water temperature Feed water hardness Feed water pH Feed water conductivity
PAGE 13 OF 95 SB134117RP0041
Product water resistivity DC voltage DC current Product flow Reject flow Dilute inlet pressure Dilute outlet pressure Product differential pressure Concentrate inlet pressure Concentrate outlet pressure Concentrate differential pressure a.7) Record the UV intensity for the PW UV sterilization lamps (UV1) 254 nm subsystem.
a.7.a) UV lamps must be replaced with 254 nm DE validated lamps as specified by the manufacturer. All repair and replacement work shall be authorized by the CO. If any repair or replacement work is accomplished without the authority of the CO it will be at the risk and expense of the contractor.
a.8) Record inlet, outlet, and differential pressures for the PW filters (0.2 µm) subsystem.
a.9) Record supply resistivity and supply pressure for the PW sensors subsystem.
a.10) Provide COR or TPOC with a PW monthly system report summarizing the:
work done, values recorded, any issues identified, and any repairs or replacements authorized and made.
7. UPW Monthly Maintenance:
a.1) Visually inspect, service, and maintain the UPW system to include the subsystem components, which shall be completed no later than the first full week of each month.
a.1.a) The UPW system must generate 30 gpm of purified water that meets or exceeds the Electronic Type E-1 (Resistivity 18.1 MOhm/cm @ 25 C, without dissolved oxygen requirements): ASTM D-5127 standard into the storage tank, and then recirculates through the BMF. The UPW is supplied with input water from the PW system. The maintenance of these systems shall be based on the ASTM D5127-13 “Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries”.
a.2) For each listed subsystem components identified in Section 5b of this PWS, the contractor shall:
a.2.a) Inspect all serviceable components within the system as defined in the owner’s manual.
a.2.b) Visually inspect control valves and seals for signs of moisture and leaks and if present, repair the system to the ASTM D5127-13 standard.
a.2.c) If any of the above, sensors, or readout electronics for required measurements are not in compliance with the manufacture’s recommended values, the contractor shall notify the COR and provide an estimate for the repair which will bring the system into compliance with the manufactures
PAGE 14 OF 95 SB134117RP0041
standard, ASTM D5127-13 standard, and the methods and requirements of Submittal Section 15485 (see reference section). All repairs or replacement of items shall be authorized by the Contracting Officer. Any repair or replacement work not authorized by the Contracting Officer is at the risk and expense of the contractor.
a.3) Record UV intensity.
a.3.a) When applicable, UV lamps must be replaced with 254 nm DE validated lamps as specified by the manufacturer.
a.4) Record the following for the UPW resin bed deionizer subsystem:
Feed water pH Inlet, outlet and differential pressure Loop supply flow rate Loop supply resistivity a.5) Record inlet and outlet differential pressures for UPW filters (0.2 µm) subsystem.
a.6) Record UV intensity for the UPW UV sterilization lamps (UV3) 185 nm a.6.a) When applicable, UV lamps must be replaced with 185 nm DE validated lamps as specified by the manufacturer.
a.7) Record inlet, outlet and differential pressures for the UPW filters (0.05 µm) subsystem.
a.8) Record the following for the UPW sensors subsystem:
Flow rate Water pressure Output water resistivity Return water resistivity a.9) Record the loop supply quality for the Total Organic Content (TOC) Analyzer subsystem.
a.9.a) The TOC must meet or exceed Electronic Type E-1 (Resistivity
18.1 MOhm/cm @ 25 C, without dissolved oxygen requirements): ASTM D- 5127 standard.
a.10) Provide COR or TPOC with a UPW monthly system report summarizing the: work done, values recorded, any issues identified, and any repairs or replacements authorized and made.
8. PW Semi-Annual Maintenance:
a.1) On a semi-annual basis, during the annual maintenance and during the first full week of the month six months after the annual maintenance, the contractor shall visually inspect, service, and maintain the PW system. The PW system must generate 14 gpm of purified water that meets or exceeds the CAP Type II (Resistivity: 2 MOhm/cm @ 25 C): College of American Pathologists Standards. The contractor shall perform the following maintenance using methods based on the ASTM D5127-13 “Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries”:
a.2) Tune the PW continuous electrical de-ionizer (CEDI) to optimize current, voltage, and flow between the two sides.
PAGE 15 OF 95 SB134117RP0041
a.3) Clean membranes of the PW reverse osmosis to manufacturer’s specifications.
a.4) Provide COR or TPOC with the PW semi-annual system report summarizing the: work done, values recorded, any issues identified, and any repairs or replacements authorized and made.
9. UPW Semi-Annual Maintenance:
a.1) On a semi-annual basis, during the annual maintenance and during the first full week of the month six months after the annual maintenance, the contractor shall visually inspect, service, and maintain the UPW system. For the UPW system to generate 30 gpm of water that meets or exceeds the Electronic Type E-1 (Resistivity 18.1 MOhm/cm @ 25 C, without dissolved oxygen requirements): ASTM D-5127 standard. The contractor shall perform the following maintenance using methods based on the ASTM D5127-13 “Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries”.
a.2) The UPW resin bed deionizers must meet the requirements of Reference Submittal Section 15485 (section 2.9-B) with the modification that the tanks are filled with virgin resin.
a.2.a) The contractor shall supply tanks with virgin resin and NIST shall receive credit for returned resin to be used for the purchase of future resin.
a.3) Replace total oxidizable carbon lamps for the TOC using a part number and method as specified by the manufacturer.
a.4) Provide COR or TPOC with the UPW semi-annual system report summarizing the: work done, values recorded, any issues identified, and any repairs or replacements authorized and made.
10. PW Annual Maintenance:
a.1) Provide annual maintenance for the PW system to generate 14 gpm of purified water that meets or exceeds the CAP Type II (Resistivity: 2 MOhm/cm @ 25 C): College of American Pathologists Standards. The annual and one of the corresponding semi-annual and monthly maintenance for the PW and UPW systems shall be completed during the first complete weekend of November which consists of the time between the close of business on Friday 5:00 pm Mountain Time until the start of business the next Monday at 7:00 am Mountain Time. Failure to complete in the required time shall result in a financial penalty of $20,000/day, the daily operating cost of the BMF. This $20,000 penalty is for both the PW and UPW systems, it will not be enforced for each system separately. For determining the penalty, each day starts at 7:01 am Mountain Time and the time is not pro-rated. The maintenance of these systems shall be based on the ASTM D5127-13 “Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries”. The contractor shall:
a.2) Obtain a core sample of the PW water softener resin and determine the resin quality. If the resin quality is not at the manufacturer recommendations
PAGE 16 OF 95 SB134117RP0041
inform the COR and TPOC. The repair/replace/upgrade line item will be used to fund the replacement.
a.3) During only the first year of the contract, replace and rebed the PW multimedia filter to manufacturer specifications. This will not be done for the other four option years of the contract. The repair/replace/upgrade line item will be used to fund the replacement.
a.4) Replace and rebed PW Activated carbon filter. The media shall be made from selected grades of bituminous coal combined with suitable binders, and shall have an iodine number of at least 850 and a minimum abrasion number of 75. Particle retention shall be 40 microns and larger. The filter size is 30 cubic feet.
a.5) Perform manufacturer recommended annual maintenance on PW continuous electrical de-ionizer (CEDI) including calibration of all water flow rates and water electrical conductivity. Cleaning shall be done based on differential pressure and quality.
a.6) Replace PW storage tank vent filter with parts and methods as specified by the manufacturer.
a.7) Replace PW UV sterilization lamps (UV1) 254 nm with 254 nm DE validated lamps, quartz sleeves, and O-rings with parts and methods as specified by the manufacturer. There is a total of 12 lamps. O-rings shall be Viton or Chemraz.
a.8) Replace all PW 0.2 micron final filters with parts and methods as specified by the manufacturer. There is a total of 42 filters.
a.9) Perform manufacturer recommended annual maintenance including calibration of all PW reverse osmosis water flow rates and water electrical conductivity. Disinfect the entire PW system (distribution loop lines plus a 2200-gallon storage tank) using a level of ozone negotiated after award of contract based on contractor’s ozone generation method and NIST system requirements. The contractor shall supply a method of generating ozone to properly disinfect the PW system to a level that meets or exceeds the CAP Type II (Resistivity: 2 MOhm/cm @ 25 C): College of American Pathologists Standards. NIST does not have the capability to generate ozone.
After disinfection, the PW system must generate 14 gpm of purified water that meets or exceeds the CAP Type II (Resistivity: 2 MOhm/cm @ 25 C):
College of American Pathologists Standards.
a.10) Provide COR or TPOC with a PW annual system report summarizing the:
work done, values recorded, any issues identified, and any repairs or replacements authorized and made.
11. UPW Annual Maintenance:
a.1) Provide annual maintenance for the UPW system to generate 30 gpm of purified water that meets or exceeds the Electronic Type E-1 (Resistivity
18.1 MOhm/cm @ 25 C, without dissolved oxygen requirements): ASTM D- 5127 standard annual maintenance is required. The annual and one of the corresponding semi-annual and monthly maintenance for the PW and UPW systems shall be completed during the first complete weekend of November
PAGE 17 OF 95 SB134117RP0041
which consists of the time between the close of business on Friday 5:00 pm Mountain Time until the start of business the next Monday at 7:00 am Mountain Time.
a.1.a) Failure to complete in the required time shall result in a financial penalty of $20,000/day, the daily operating cost of the BMF. This $20,000 penalty is for both the PW and UPW systems, it will not be enforced for each system separately. For determining the penalty, each day starts at 7:01 am Mountain Time and the time is not pro-rated. The maintenance of these systems shall be based on the ASTM D5127-13 “Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries”.
a.2) Replace UPW storage tank vent filter with parts and methods as specified by the manufacturer. This includes: Inspecting the nitrogen blanket system.
Verify there are no tears in membranes. Verify the nitrogen flow and pressure are set to the manufacturer’s recommended values.
If the UPW storage tank is not in compliance with the manufacturer’s recommended values, repair the system to the manufactures standard in a method in accordance with the ASTM D5127-13 standard and the methods and requirements of Submittal Section 15485 (see reference section). If the contractor deems it to be more cost effective to replace the item, the contractor shall contact the COR for authority to replace.
a.3) Replace all UPW UV sterilization lamps (UV2) 254 nm DE validated lamps, quartz sleeves and O-rings with parts and methods as specified by the manufacturer. There is a total of 8 lamps.
a.4) Replace UPW filters (0.2 µm) with parts and methods as specified by the manufacturer. There is a total of 6 filters.
a.5) Replace all UPW UV sterilization lamps (UV3) 185 nm DE validated lamps, quartz sleeves and O-rings with parts and methods as specified by the manufacturer. There is a total of 4 lamps.
a.6) Replace all UPW filters (0.05 µm) with parts and methods as specified by the manufacturer. There is a total of 14 filters.
a.7) Replace Total oxidizable carbon pump Organic Content Analyzers with parts and methods as specified by the manufacturer. There is a total of 2 pumps.
a.7.a) Replace the total organic analyzer’s total oxidizable carbons filter with parts and methods as specified by the manufacturer.
a.8) Disinfect the entire UPW system (distribution loop lines plus a 2200-gallon storage tank) using a level of ozone negotiated after award of contract based on contractor’s ozone generation method and NIST system requirements. The contractor shall supply a method of generating ozone to properly disinfect the PW system to a level that meets or exceeds the Electronic Type E-1 (Resistivity 18.1 MOhm/cm @ 25 C, without dissolved oxygen requirements): ASTM D-5127 standard. NIST does not have the capability to generate ozone. After disinfection, the UPW system must generate 30 gpm of purified water that meets or exceeds the Electronic Type E-1 (Resistivity 18.1 MOhm/cm @ 25 C, without dissolved oxygen requirements): ASTM D-5127 standard.
PAGE 18 OF 95 SB134117RP0041
a.9) Provide COR or TPOC with a UPW annual system report summarizing the: work done, values recorded, any issues identified, and any repairs or replacements authorized and made.
12. Pure Water (PW) monthly: Performance Requirements and Surveillance Table
Task Performance Indicators
Performance Standards
Acceptable Quality Level
Surveillance Method
Pure Water monthly:
As defined in the statement of work section 6 to meet the requirements listed.
The system provides CAP Type II water, flow rate and is serviced and inspected to technical requirements as defined by section 6.
The technical requirements defined in the statement of work section 6.
and the delivery of reportable items included in 6 within one week of the site visit.
Maintenance performed to manufacturer specifications using OEM components for each piece of equipment listed in the scope of work section 6.
Monthly and one semi-annual work must be performed within the work week with minimal disruption to system. One monthly, one semi-annual, and the annual work must be performed over a single weekend to minimize system down time.
Visual verification of work completed and verifying required recorded measurements of the systems listed in 6 from the written report.
13. Ultra-Pure Water (UPW) monthly: Performance Requirements and Surveillance Table
Task Performance Indicators
Performance Standards
Acceptable Quality Level
Surveillance Method
Ultra-Pure Water monthly:
As defined in the statement of work section 7 to meet the requirements listed.
The system provides Electronic Type E-1 water, flow rate and is serviced and inspected to technical requirements as defined by section 7.
The technical requirements defined in the statement of work section 7.
and the delivery of reportable items included in 7 within one week of the site visit.
Maintenance performed to manufacturer specifications using OEM components for each piece of equipment listed in the scope of work section 7.
Monthly and one semi-annual work must be performed within the work week with minimal disruption to system. One monthly, one semi-annual, and the annual work must be performed over a single weekend to minimize system down time.
Visual verification of work completed and verifying required recorded measurements of the systems listed in 7 from the written report.
PAGE 19 OF 95 SB134117RP0041
14. Pure Water (PW) semi-annual: Performance Requirements and Surveillance Table
Task Performance Indicators
Performance Standards
Acceptable Quality Level
Surveillance Method
Pure Water monthly:
As defined in the statement of work section 8 to meet the requirements listed.
The system provides CAP Type II water, flow rate and is serviced and inspected to technical requirements as defined by section 8.
The technical requirements defined in the statement of work section 8.
and the delivery of reportable items included in 8 within one week of the site visit.
Maintenance performed to manufacturer specifications using OEM components for each piece of equipment listed in the scope of work section 8.
Monthly and one semi-annual work must be performed within the work week with minimal disruption to system. One monthly, one semi-annual, and the annual work must be performed over a single weekend to minimize system down time.
Visual verification of work completed and verifying required recorded measurements of the systems listed in 8 from the written report.
15. Ultra-Pure Water (UPW) semi-annual: Performance Requirements and Surveillance Table
Task Performance Indicators
Performance Standards
Acceptable Quality Level
Surveillance Method
Ultra-Pure Water monthly:
As defined in the statement of work section 9 to meet the requirements listed.
The system provides Electronic Type E-1 water, flow rate and is serviced and inspected to technical requirements as defined by section 9.
The technical requirements defined in the statement of work section 9.
and the delivery of reportable items included in 9 within one week of the site visit.
Maintenance performed to manufacturer specifications using OEM components for each piece of equipment listed in the scope of work section 9.
Monthly and one semi-annual work must be performed within the work week with minimal disruption to system. One monthly, one semi-annual, and the annual work must be performed over a single weekend to minimize system down time.
Visual verification of work completed and verifying required recorded measurements of the systems listed in 9 from the written report.
16. Pure Water (PW) annual: Performance Requirements and Surveillance Table
PAGE 20 OF 95 SB134117RP0041
Task Performance Indicators
Performance Standards
Acceptable Quality Level
Surveillance Method
Pure Water monthly:
As defined in the statement of work section 10 to meet the requirements listed.
The system provides CAP Type II water, flow rate and is serviced and inspected to technical requirements as defined by section 10.
The technical requirements defined in the statement of work section 10.
and the delivery of reportable items included in 10 within one week of the site visit.
Maintenance performed to manufacturer specifications using OEM components for each piece of equipment listed in the scope of work section 10.
Monthly and one semi-annual work must be performed within the work week with minimal disruption to system. One monthly, one semi-annual, and the annual work must be performed over a single weekend to minimize system down time.
Visual verification of work completed and verifying required recorded measurements of the systems listed in 10 from the written report.
17. Ultra-Pure Water (UPW) annual: Performance Requirements and Surveillance Table
Task Performance Indicators
Performance Standards
Acceptable Quality Level
Surveillance Method
Ultra-Pure Water monthly:
As defined in the statement of work section 11 to meet the requirements listed.
The system provides Electronic Type E-1 water, flow rate and is serviced and inspected to technical requirements as defined by section 11.
The technical requirements defined in the statement of work section 11.
and the delivery of reportable items included in 11 within one week of the site visit.
Maintenance performed to manufacturer specifications using OEM components for each piece of equipment listed in the scope of work section 11.
Monthly and one semi-annual work must be performed within the work week with minimal disruption to system. One monthly, one semi-annual, and the annual work must be performed over a single weekend to minimize system down time.
Visual verification of work completed and verifying required recorded measurements of the systems listed in 11 from the written report.
18. PLACE OF PERFORMANCE:
All work shall be performed at the 325 Broadway, Boulder, Colorado location.
PAGE 21 OF 95 SB134117RP0041
Access to Building 1 and Building 81 shall be granted to the contractor for the entire period of performance of this contract.
The day-today supervision and direct control over the work performed by the on-site contractor personnel will be the sole responsibility of the contractor.
19. PERIOD OF PERFORMANCE: 52 weeks ARO Confidentiality: The information developed under this contract is the property of the U.S.
Government and shall be kept in strict confidence.
20. Qualifications:
The contractor shall provide experienced contractor personnel to maintain the PW and UPW systems.
21. Safety:
Provide personnel that are US Citizens that pass required government background checks to be issued badges for work on site.
All staff from selected vendor must be badged by NIST Security. No one may enter the site without a badge.
A minimum of two people shall be hard badged with 24-hour access.
All maintenance will be scheduled with the COR and TPOC at least 1 week prior to arrival to do the work.
During the performance of the work, if the contractor deems it necessary to shut down either the PW or UPW system, the contractor shall notify the COR or TPOC for approval.
However, if there is imminent threat of damage to life or property, contractor has the authority to shut down the system without notifying the COR or TPOC for approval.
22. References:
a. CAP Type II (Resistivity: 2 MOhm/cm @ 25 C): College of American Pathologists
Standards
b. Electronic Type E-1 (Resistivity 18.2 MOhm/cm @ 25 C, without dissolved oxygen requirements): ASTM D-5127
c. Manuals for all systems will be available to each potential vendor.
d. Building 81 submittal requirements: Section 15485 “High Purity Water Piping
System”:
e. The attached document (pages 17-36) describes the original requirements for the PW and UPW systems when the current building was constructed. The systems described are already built. The purpose of this document is to describe the system and the standards used in its construction. The PW and UPW systems must be maintained to the same standards and produce the same quality of product as described in this document.
PAGE 22 OF 95 SB134117RP0041
07575/089687 NIST September 11, 2009 Final Building 1 Extension Build-Out Posted Set: February 26, 2010
HIGH PURITY WATER PIPING SYSTEM
15485 - 1
SECTION 15485
HIGH PURITY WATER PIPING SYSTEM
PART 1 - GENERAL
1.1 DESCRIPTION
A. Description of systems:
1. High purity water systems shall include all piping and equipment shown on the high purity water system schematics and included in this specification section.
2. Furnish all labor, materials, tools, equipment and services to provide complete and operable high purity water systems as indicated and in accord with the provisions of the Contract Documents.
3. Systems:
a. Pure Water (PW) = CAP Type II (Resistivity: 2 meg-ohm/cm @ 25 C): College of
American Pathologists Standards.
b. Ultra Pure Water (UPW) = Electronic Type E-1 (Resistivity: 18.2 meg-ohm/cm @ 25
C, without Dissolved Oxygen requirements): ASTM D-5127.
4. Provide a skid mounted system, factory packaged and wired including all components including control panel. If size of system makes shipping as a single unit impractical, ship package in sections which are easily field assembled to produce a complete operating system.
5. Products:
a. Piping and fittings.
b. Valves.
c. Equipment.
1.2 QUALITY CONTROL
A. Water quality standards:
1. CAP Type II: College of American Pathologists Standards.
2. Electronics Type E-1: American Society for Testing and Materials.
B. Water analysis:
1. Perform a water analysis of the domestic water supply and base final selection of equipment on the analysis.
C. Piping standards: Section 15060.
D. High purity plastic piping systems, for Ultra Pure Water: Section 15479.
1.3 SUBMITTALS
A. Shop drawings:
1. Piping and equipment package layout.
2. Complete system wiring diagram.
B. Product data:
1. Pipe and fittings.
2. Thermostatic mixing valves.
3. Filtration devices.
4. Reverse osmosis equipment.
5. Deionization equipment.
6. Storage vessels.
7. Pumps.
8. Ultraviolet sterilizers.
9. Valves.
PAGE 23 OF 95 SB134117RP0041
HIGH PURITY WATER PIPING SYSTEM
15485 - 2
10. Water quality instrumentation.
C. Project information: Not required for review.
D. Contract closeout information:
1. Test reports:
a. Pressure tests.
b. Sterilization tests.
2. Operating and maintenance data.
3. Local service office and response time for service.
E. For each type of product or material specified in this section, supplied for the Project, submit written certification, on company stationer, executed by an authorized agent of the particular product or material company, certifying that the particular product or material provided for the project qualifies as a domestic material or product under FAR 52.225-23.
PART 2 - PRODUCTS
2.1 GENERAL
A. Acceptable manufacturers:
1. Pipe and fittings:
a. Base:
1) George Fischer, Inc.
b. Optional:
1) Asahi/America.
2) Orion Industries, Inc.
3) Enfield Industrial Corp.
4) Chemtrol.
5) Sani-Tech.
2. Thermostatic mixing valves:
a. Base:
1) Powers.
b. Optional:
1) Leonard Valve.
2) Symmons.
3. Filtration devices:
a. Base:
1) U.S. Filter/Siemens.
b. Optional:
1) Bruner Corporation.
2) Hydro Service and Supplies.
3) Vaponics.
4) Millipore.
5) Culligan.
6) Zenon Environmental Systems, Inc.
7) Shelco Filters.
4. Reverse osmosis equipment:
a. Base:
1) U.S. Filter/Siemens.
b. Optional:
1) Bruner Corporation.
2) Hydro Service and Supplies.
3) Vaponics.
4) Millipore.
5) Culligan.
PAGE 24 OF 95 SB134117RP0041
HIGH PURITY WATER PIPING SYSTEM
15485 - 3
6) Zenon Environmental Systems, Inc.
5. Deionization equipment:
a. Base:
1) U.S. Filter/Siemens.
b. Optional:
1) Bruner Corporation.
2) Hydro Service and Supplies.
3) Vaponics.
4) Millipore.
5) Culligan.
6) Zenon Environmental Systems, Inc.
7) Agape Water Solutions, Inc.
6. Storage vessels:
a. Base:
1) U.S. Filter/Siemens.
b. Optional:
1) Hydro Service and Supplies.
2) Vaponics.
3) Nalgene.
4) Zenon Environmental Systems, Inc.
7. Distribution pumps:
a. Base:
1) Grundfos.
b. Optional:
1) Tonkaflo.
2) Goulds.
3) Sta-rite.
8. Ultraviolet sterilizers:
a. Base:
1) U.S. Filter/Siemens.
b. Optional:
1) Aqua Fine.
2) R-Can International (Sterilight).
3) Vaponics.
4) Hydro Service and Supplies.
5) Zenon Environmental Systems, Inc.
9. Pure water faucets:
a. Base:
1) Chicago Faucet.
2) Speakman.
b. Optional:
1) Continental.
2) Sani-tech.
3) T&S Brass.
10. Valves:
a. Base:
1) Same as manufacturer of piping.
b. Optional:
1) Waukesha Cherry-Burrell
2) DeZurik
3) Gulf
4) SSI Equipment, Inc.
11. Water quality instrumentation:
a. Base:
1) Thorton.
b. Optional:
PAGE 25 OF 95 SB134117RP0041
HIGH PURITY WATER PIPING SYSTEM
15485 - 4
1) Bruner Corporation.
2) US Filter/Siemens.
3) GE.
4) Vaponics.
5) Millipore.
6) Culligan.
7) Zenon Environmental Systems, Inc.
12. Other manufacturers desiring approval comply with Section 00440 .
2.2 PIPE AND FITTINGS
A. Provide polypropylene pipe and fittings where indicated on the Pure Water system schematic.
1. Polypropylene pipe and fittings:
a. Pipe and fittings shall be manufactured from a Group I, Class 2, Beta nucleated homopolymer conforming to the requirements of ASTM-410l. Pipe and fittings shall be equal to Beta Polypropylene as manufactured by George Fischer.
b. Pipe shall be Schedule 80 and conform to the dimensional requirements of ASTM- D2447, ASTM-D1785, or SDR.
c. Fittings shall be Schedule 80 type and conform to the dimensional requirements of ASTM-D2447, ASTM-D1785, or SDR.
2. Joints:
a. Heat fused socket type utilizing an electrically heated, thermostatically controlled fusion bonding tool and conforming to the requirements of ASTM-FD2657.
b. Threaded joints shall be allowed only at interface between polypropylene and stainless steel pipe and shall be made with teflon tape applied to the male fitting. Pipe dope is not permitted.
c. Joints at connections to equipment shall be flanged.
d. Chemical fusing shall not be permitted.
B. Provide polyvinylidene fluoride (PVDF) pipe and fittings where indicated on the Ultra Pure Water system schematic. Refer to Section 15479.
2.3 THERMOSTATIC MIXING VALVE ASSEMBLY
A. The thermostatic mixing (PMV-1) valve.
1. Assembly shall consist of a thermostatic controller with union check stops, removable cartridge with strainer, stainless steel piston and liquid fill thermal motor with bellows element mounted out of water, volume control shut-off valve, dial thermometer, wall brackets and fasteners. All components shall be chrome plated brass.
2. Capacity shall be 25 GPM.
3. Manufacturer: Powers Model e432.
2.4 FILTRATION DEVICES
A. Multimedia filtration (MMF-1):
1. The unit shall be a fully automatic, multi-layered, granular media filter consisting of a minimum of 3 distinct filter layers in addition to a supporting layer. The filter layers shall be stratified with the coarsest layer at the top and the finest layer at the bottom. Particle retention shall be 10 micron and larger.
2. Tank shall be constructed of ASME designed/coded stamped carbon steel and shall have flanged inlet and outlet connections. Access openings shall be provided in the tank.
3. Support shall be provided for the unit. The support shall consist of a full bottom tank skirt or structural legs and leveling shims.
4. Provide a separate pipe connection to serve the system back wash mode of operation.
5. Tank coating: 4 to 6 mil DFT epoxy.
6. Tank lining: 12 to 16 mil DFT epoxy.
PAGE 26 OF 95 SB134117RP0041
HIGH PURITY WATER PIPING SYSTEM
15485 - 5
7. The internal distribution system shall consist of an upper and lower component. The distribution system shall be a fine-slotted self cleaning plastic manifold, or , a fine-slotted self cleaning stainless steel manifold, or, multi fine slotted self cleaning plastic manifolds mounted on a hub radial. The lower distribution system shall be embedded in a single layer subfill of washed and graded quartz underbedding a minimum of 2 IN deep.
8. Vessel shall be fitted with a unitized 5-cycle multi-functional main control valve to accomplish the operational steps of backwash, slow rinse, and fast rinse.