SOW_FOR_RFQ.pdf
PDF 254 KB Posted
- Attached to
- Maintenance of Bruker Biospin Instruments
- Solicitation number
- SB1341-15-RQ-0580
View the file
Other files
| File | Type | Posted |
|---|---|---|
| syn_sol.pdf | ||
| subcontracting_plan_outline_attachment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Quotation Number SB1341-15-RQ-0580
Statement of Work
BACKGROUND
The National Institute of Standards and Technology (NIST) include four Directorates that utilize Bruker instruments to support its mission. These Directorates are the Center for Nanoscale Science and Technology (CNST), the Engineering
Laboratory (EL), the Material Measurement Laboratory (MML), and the Physical Measurement Laboratory (PML), The NIST Center for Nanoscale Science and Technology (CNST) supports the U.S. nanotechnology enterprise from discovery to production by providing industry, academia, NIST, and other government agencies with access to world-class nanoscale measurement and fabrication methods and technology. The CNST's shared-use NanoFab gives researchers economical access to and training on a commercial state-of-the-art tool set required for cutting-edge nanotechnology development. The simple application process is designed to get projects started in a few weeks.
Looking beyond the current commercial state of the art, the CNST's NanoLab offers opportunities for researchers to collaborate on creating and using the next generation of nanoscale measurement instruments and methods. As the
Department of Commerce nanocenter, the CNST provides:
A unique facility offering access to the instrumentation, methods, and technical expertise required to make and measure components at the nanometer scale.
Expertise in a wide variety of disciplines; from physics, chemistry, materials science, molecular biology, computer science, and electrical, mechanical, chemical, and aeronautical engineering.
A world-class, 60,000 square foot (5600 m ) shared resource for nanofabrication and measurement — with over 19,000 square feet (1,800 m ) of cleanroom laboratory space.
A hub linking the international nanotechnology community to the comprehensive related measurement expertise throughout NIST.
The EL promotes U.S. innovation and industrial competitiveness in areas of critical national priority by anticipating and meeting the measurement science and standards needs for technology-intensive manufacturing, construction, and cyber-physical systems, including the Smart Grid Program Office in ways that enhance economic prosperity and improve the quality of life. The EL is actively engaged with technical committees and standards developing organizations (SDOs) that are key to implementing technologies that are aligned with the Laboratory's five strategic goals. Staff members serve on about 130 committees and working groups, many in leadership positions. For example, the output of BFRL research is a source of technical information for ASTM International (ASTM), the American Society of Heating, Refrigerating and
Air-Conditioning Engineers, Inc. (ASHRAE), the American Society of Mechanical Engineers (ASME), the American
Society of Civil Engineers (ASCE), the American Concrete Institute (ACI), the American Institute of Steel Construction
(AISC), the National Fire Protection Association (NFPA), Underwriters Laboratories, Inc.(UL), the Society of Fire
Protection Engineers (SFPE), the International Organization for Standardization (ISO), the International Council for
Research and Innovation in Building and Construction (CIB), the International Code Council (ICC), and the Construction
Industry Institute.
The EL carries out mission related activities in:
Fire prevention and control;
National earthquake hazards reduction;
National windstorm impact reduction;
National construction safety teams;
http://www.nist.gov/cnst/nanofab/index.cfm http://www.nist.gov/cnst/focus_areas.cfm http://www.nist.gov/cnst/about_res.cfm http://www.nist.gov/smartgrid/index.cfm
Building materials and structures;
Engineering and manufacturing materials, products, processes, equipment, technical data, and standards;
Manufacturing enterprise integration;
Collaborative manufacturing research pilot grants; and
Manufacturing fellowships.
The EL carries out other mission related engineering research that includes:
Systems integration and engineering, Intelligent systems and control, Robotics and automation, Cyber-physical systems, Sustainability and energy efficiency, Economic analysis and life cycle assessment, Productivity measurement, and
Safety and environmental performance.
The Material Measurement Laboratory is one of two metrology laboratories within the National Institute of Standards and
Technology (NIST). The laboratory supports the NIST mission by serving as the national reference laboratory for measurements in the chemical, biological and material sciences. Our activities range from fundamental and applied research on the composition, structure and properties of industrial, biological and environmental materials and processes, to the development and dissemination of tools including reference measurement procedures, certified reference materials, critically evaluated data, and best practice guides that help assure measurement quality. Our research and measurement services support areas of national importance, such as:
Advanced materials, from nanomaterials to structural steels to complex fluids
Electronics, from semiconductors to organic electronics
Energy, from characterization and performance of fossil and alternative fuels to next-generation renewable sources of energy
The environment, from the measurement of automotive exhaust emissions and other pollutants to assessment of climate change and the health and safety aspects of man-made nanomaterials
Food safety and nutrition, from contaminant monitoring to ensuring the accuracy of nutrition labels
Health care, from clinical diagnostics to tissue engineering and more efficient manufacturing of biologic drugs
Infrastructure, from assessing the country's aging bridges and pipelines to the quality of our drinking water
Manufacturing, from lightweight alloys for fuel-efficient automobiles to biomanufacturing and data for chemical manufacturing
Safety, security and forensics, from gunshot and explosive residue detection, to ensuring the performance of body armor materials, to DNA-based human identity testing http://www.nist.gov/public_affairs/mission.cfm http://www.nist.gov/mml/amat.cfm http://www.nist.gov/mml/elec.cfm http://www.nist.gov/mml/nrg.cfm http://www.nist.gov/mml/env.cfm http://www.nist.gov/mml/food.cfm http://www.nist.gov/mml/bio.cfm http://www.nist.gov/mml/infr.cfm http://www.nist.gov/mml/mfg.cfm http://www.nist.gov/mml/safe.cfm
Address measurement needs and support innovation in biomanufacturing, biotechnology, biomedical research using research facilities at the University of Maryland
The Material Measurement Laboratory also coordinates the NIST-wide Standard Reference Materials® (SRM) and
Standard Reference Data programs, which include production, documentation, inventory, marketing, distribution and customer service.
The NIST Center for Neutron Research (NCNR) is part of the National Institute of Standards and Technology (NIST) in
Gaithersburg, Maryland. Its activities focus on providing neutron measurement capabilities to the U.S. research community. It is a national center for research using thermal and cold neutrons, offering its instrumentation for use by all qualified applicants. Many of its instruments rely on intense beams of cold neutrons emanating from an advanced liquid hydrogen moderator. The NCNR mission is threefold:
To operate the NCNR safely as a cost-effective national resource.
To conduct a broad program of research using neutron techniques, and to develop and apply new neutron measurement techniques.
o NCNR Instruments o Article about the scientific work done at the NCNR, please visit http://nvl.nist.gov/pub/nistpubs/jres/106/1/cnt106-1.htm
Title: Materials Research With Neutrons At NIST
To operate the NIST Center for Neutron Research as a national resource for researchers from industry, university and other government agencies.
o NCNR Scientific Programs o NCNR Educational Programs (includes the Summer School Program) o Neutron Interactions and Dosimetry Group o Nuclear Methods Group
The PML develops and disseminates the national standards of length, mass, force and shock, acceleration, time and frequency, electricity, temperature, humidity, pressure and vacuum, liquid and gas flow, and electromagnetic, optical, microwave, acoustic, ultrasonic, and ionizing radiation. Its activities range from fundamental measurement research through provision of measurement services, standards, and data. PML applies its measurement capabilities to problems of national significance through collaborations with industry, universities, professional and standards setting organizations, and other agencies of government. It supports the research community in such areas as communication, defense, electronics, energy, environment, health, lighting, manufacturing, microelectronics, radiation, remote sensing, space, and transportation. PML establishes spectroscopic methods and standards for infrared, visible, ultraviolet, x-ray, and gamma-ray radiation; investigates the structure and dynamics of atoms, molecules, and biomolecules; develops the electrical, thermal, dimensional, mechanical, and physical metrology for measuring the properties of precision measurement devices and exploratory semiconductor, quantum electronic, nano-electronic, bio-electronic, bio-optical, optoelectronic, and quantum information devices and systems; and examines the thermophysical and interfacial properties of streams of flowing fluids, fluid mixtures, and solids. It develops and disseminates national standards by means of calibrations, measurement quality assurance, standard reference materials, technology transfer, education/training, and a comprehensive weights and measurement program to promote uniformity and accuracy at the international, federal, state, and local levels. It generates, evaluates, and compiles atomic, molecular, optical, ionizing radiation, electronic, and electromagnetic data in response to national needs; measures and improves accuracy of the fundamental physical constants; and develops and operates major radiation sources for measurement science and metrology.
The Bruker instrument s owned and used by NIST are described in Table 1 of this Statement of Work (SOW).
http://www.nist.gov/srm/program_info.cfm http://www.nist.gov/srd/index.cfm http://www.nist.gov/welcome.html http://www.ncnr.nist.gov/why_neutrons.html http://www.ncnr.nist.gov/coldgains/ http://www.ncnr.nist.gov/coldgains/ http://www.ncnr.nist.gov/instruments/index.html http://nvl.nist.gov/pub/nistpubs/jres/106/1/cnt106-1.htm http://www.ncnr.nist.gov/programs/index.html http://www.ncnr.nist.gov/programs/CHRNS/outreach.html http://www.physics.nist.gov/Divisions/Div846/Gp3/gp3.html http://www.ncnr.nist.gov/div8395/index.html
SCOPE OF WORK
A. The Contractor shall provide a service agreement for the service and maintenance for the Bruker instruments and their associated components in Table 1. This effort shall include uninterrupted performance within manufacturers’ specifications on a scheduled and as-needed basis. The Contractor shall guarantee the full system performance of these instruments, including third-party accessories.
Service and maintenance shall include unlimited emergency visits during regular business hours in addition to scheduled preventive maintenance visits for one year, unless stipulated otherwise. Covered expenses shall include all parts, labor, travel, and per diem.
The Contractor shall repair/replace all parts (i.e., hardware, software, accessory components/systems) required for the operation of the systems listed in Table 1. Currently, all equipment listed in Table 1 is functioning in accordance with manufacturer’s specifications.
Table 1
NIST Operating Unit
Name/Division Instrument and Model Number Serial Number
Description of 3rd Party
Accessories NIST Campus
MML/642 NMR, model number H05130/1
DSX
BH30398 All OEM Gaithersburg
MML/644 NMR, 600 MHz AVII BH050005 All OEM including
1)
BCU05LT COOLING
UNIT (S/N
W12055351279)
2) SampleXpress Sample
Changer
3) PA BBI 600SB H-BB-
D-05 Z (S/N
Z814601/00028)
4) PA BBO 600SB BB-H-
Z847801/00033)
Gaithersburg
MML/645 NMR, AV TwinBay 3 Channel 600 BH006102 All OEM University of
MD
MML/645 NMR, AV TwinBay 3 Channel
900US
BH008910 All OEM including a
CP TCI 900 H-C/N-D-05
Z
University of
MD
MML/645 NMR, AV SingleBay 3 Channel
BH009110 All OEM including a
CP TCI 600 H-C/N-D-05
Z
University of
MD
MML/645 NMR, DRX 4 Channel 500 BH009597 All OEM University of
MD
MML/646 NMR, 800 MHz AVII BH041104 All OEM including
1)
B-ACS120/750-800SB
SAMPLECHANGER
(S/N
Hollings Marine
Laboratory
NIST Operating Unit
Name/Division Instrument and Model Number Serial Number
Description of 3rd Party
Accessories NIST Campus
H14224/0010)
2) BCU05LT COOLING
W1208411/0203)
3) CP TCI 800S6 H-C/N-
Z44909/00033)
4) GREAT 3/10A (S/N
W1208498/0350)
5) PA BBO 800SB BB-H-
D-05 Z BTO (S/N
Z553801/0004)
6) PA TXI 800SB H-C/N-
D-01 Z BTO (S/N
Z870301/00001)
7) PA TXI 800SB H-C/N-
D-05 XYZ BTO (S/N
Z843501/00011)
MML/646 NMR, 700 MHz AVII BH041204 All OEM including
1) SampleJet
SAMPLECHANGER
(S/N Z109954/00523)
2) SampleJet BCI (S/N
Z118229/46)
3) BCU05LT COOLING
W1208411/0177
4) CP TCI 700S4 H-C/N-
Z44908/00029)
5) GREAT 3/10A (S/N
W1208498/0311)
6) PA TXI 700S4 H-C/N-
D-05 XYZ BTO (S/N
Z561501/00026)
7) PA TXI 700SB H-C/N-
D-01 Z BTO (S/N
Z863501/00003)
8) PH CRYOFIT LC
700MHZ 3MM 30μL
(S/N H13499/0007)
9) PH HRMAS 500S2
Hollings Marine
Laboratory
NIST Operating Unit
Name/Division Instrument and Model Number Serial Number
Description of 3rd Party
Accessories NIST Campus
PHD 4 G (S/N
B3900/0414)
10) PH LCSEI700SB H-
C/D-3 Z N ATM BTO
30UL (S/N H13220/0203)
11) LC NMR SPE unit
12) Ion trap coverage with unlimited repair visits
MML/647 NMR, 600 MHz, AVIII BH009010
(system reference number
10026169)
All OEM including
1) CP QNP 600S3 P/C/N-
H-D-05 Z (S/N Z75819)
2) GREAT 1/60A FOR
AVANCE III (S/N
W1215323)
3) GREAT MASTER
UNIT E (S/N W1522066)
NIST Boulder
SPECIFIC TASKS
The Contractor shall perform the following tasks for the Bruker instruments and accessories described in Table 1.
A. Service Conditions and Repairs for all Instruments
1. All service provided under this agreement must be provided by personnel who are trained and fully competent in the operation of the covered instrument and/or third party accessories.
2. All parts shall be approved for use with the instrument by Bruker and/or the manufacturer of the third party accessories.
The Contractor shall only employ tools, instruments, test apparatus, methodologies, techniques, and practices approved for use with the instrument by the manufacturer. The service protocols and instrument specifications shall be adhered to at all times.
3. The standard manufacturer’s warranty for parts and labor shall apply to all work performed.
4. The Contractor shall respond to an unlimited number of requests for service calls in the event of instrument failure which requires immediate repair.
5. The Contractor shall respond to service calls Monday through Friday, during regular business hours only. The Contractor shall provide a service technician/engineer on-site at NIST Gaithersburg, MD, the NIST, Boulder, CO, the NIST facility at the Hollings Marine Laboratory, Charleston, SC, and the NIST facility at the University of Maryland within 72 hours after the service call is placed by the Government. No weekend service visits shall be required.
6. For any third party service calls, the Contractor shall provide a service technician/engineer on-site at NIST Gaithersburg, MD, at NIST Boulder, CO, the NIST facility at the Hollings Marine Laboratory, Charleston, SC, and the NIST facility at the University of Maryland within seven calendar days after the service call is placed by the Government. No weekend service visits shall be required.
7. In the event that the Contractor is unable to resolve the problem during the service call, the Contractor shall provide telephone support and on-site support as needed to expedite a solution for NIST.
8. The Contractor is responsible to obtain all parts required for all repairs and maintenance. The Contractor shall make a commercially reasonable effort to secure parts within 72 hours after identifying the need for a replacement part for the covered equipment.
9. Replacement parts provided under this agreement may be either new or remanufactured and the Contractor may exchange and/or repair existing components.
10. All repairs must result in the instruments meeting manufacturer’s specifications as specified in the most recent version of the operation and maintenance manual for the instrument.
11. Any parts or components removed for replacement shall become the property of the Contractor unless otherwise agreed to by the parties. The Contractor shall remove the parts from the NIST campus at the time of the service call. This statement of work assumes that the Contractor will take the component(s) with them at the time of the service call, and that no shipping charges will be incurred under this contract. The Contractor shall assume liability for all parts removed from the
NIST campus.
Clarification: Should a part need to be replaced and that part is determined to be contaminated, NIST will dispose of the item and will order a replacement. The Government understands that rebates cannot be provided for items deemed to be contaminated.
B. Preventive Maintenance for Instruments in Table 1
1. Provide one (1) preventive maintenance visit during each one year term of the service agreement as specified in the manufacturer’s operations and maintenance manual for each instrument. The Contractor shall utilize the most recent operation and maintenance manual available for each instrument.
2. Provide one (1) annual full-service preventative maintenance visit for each CryoPlatform system for serial numbers
BH041104 and BH041204.
3. Scheduling of the visits shall be consistent with the maintenance requirements of the instrument as detailed in the most recent operation and maintenance manual for each piece of equipment.
4. Preventive maintenance visits shall occur during NIST’s regular business hours as specified in this SOW. The NIST
Technical Point of Contact (TPOC) shall contact the Contractor to schedule a mutually acceptable date and time for the preventive maintenance visits. The scheduled maintenance visits may be made at the same time as an unscheduled visit for corrective or other action if such a visit occurs within one month before a scheduled preventive maintenance visit. All visits must be scheduled, in advance with the NIST TPOC.
5. Any parts or components removed for replacement shall become the property of the Contractor unless otherwise agreed to by the parties. The Contractor shall remove the parts from the NIST campus at the time of the service call. This statement of work assumes that the Contractor will take the component(s) with them at the time of the service call, and that no shipping charges will be incurred under this contract. The Contractor shall assume liability for all parts removed from the
NIST campus.
Clarification: Should a part need to be replaced and that part is determined to be contaminated, NIST will dispose of the item and will order a replacement. The Government understands that rebates cannot be provided for items deemed to be contaminated.
C. System Enhancements for Instruments in Table 1
1. Install all commercial software updates for the purposes of instrument optimization not later than 60 days after any such update is released. The software updates for the instrument in this requirement shall be free for the life of the contract, unless a hardware upgrade is required.
2. Prior to completion of the installation, the Contractor shall test the equipment, review the equipment’s performance, and take whatever steps are necessary to ensure the equipment is functioning in accordance with the manufacturers’ specifications as impacted or changed by the update.
D. Telephone Support for Instruments in Table 1
Provide telephone support for the covered equipment during regular business hours. Telephone support must include responses to questions about operating practices, application use, and service issues that can be diagnosed and resolved over the telephone.
E. Compliance with NIST Rules and Regulations for all Instruments in Table 1
1. While on the NIST campus, the Contractor’s representative(s) shall abide by all NIST rules and regulations pertaining to visitors.
2. The Contractor shall provide all information necessary for the COR or TPOC to authorize entrance to the NIST campus in accordance with NIST Security Policy and Procedures. In the case of preventive maintenance visits, the Contractor shall provide at least thirty (30) days’ notice to the COR or the TPOC.
ACCEPTANCE/INSPECTION BY THE GOVERNMENT
The Government reserves the right to conduct quality assurance testing to confirm that a given instrument meets the manufacturer’s performance specifications. All Government testing will be completed within five (5) working days of the completion date of a maintenance or repair visit.
OPTIONS
The Contractor shall perform the work described in Sections II and III of this SOW for one (1) year for each Bruker instrument and third party accessories. The Government may award up to four (4) 1-year options to continue the work specified in Section II and III of this SOW.
DELIVERABLES AND DELIVERABLE DUE DATES
The Contractor shall submit a service ticket prior to departure from NIST on any given service call for maintenance or repairs. The service ticket shall include the following for the Bruker instruments:
1. Model number.
2. Serial number.
3. Date and time of arrival to NIST.
4. Description of service performed.
5. Name and quantity of any parts that were repaired.
6. Name and quantity of any parts that were replaced.
7. Date and time of departure from NIST.
8. Diagnostic test results or narrative summary demonstrating that the Bruker instrument is meeting the performance standards.
9. Any additional comments or recommendations.
10. Printed name and signature of Bruker service person
11. Signature block for NIST personnel accepting the services rendered.
PERIOD OF PERFORMANCE AND PLACE OF PERFORMANCE
The period of performance shall be for one (1) base year from date of award with up to four (4) 1-year options. The period of performance shall not exceed five (5) years.
Performance will be at NIST, 100 Bureau Drive, Gaithersburg, MD, at NIST, 325 Broadway, Boulder, CO, and the NIST facility at the Hollings Marine Laboratory, 331 Fort Johnson Road, Charleston, SC campuses, and at the University of
Maryland.
GOVERNMENT-FURNISHED PROPERTY, DATA AND/OR INFORMATION
The Government will provide visitor’s access to the NIST facilities during the performance of this contract. If a given hand tool is available, the Government will provide such tools during the performance of a given service call.
CONTRACTOR’S MINIMUM QUALIFICATIONS
The Contractor shall provide engineers or technicians that are fluent in the operation of the equipment in question throughout the period of performance of this requirement. Contractor personnel shall have at least two (2) years of experience on the Bruker instrument or third party accessories for which the service is being rendered.
Due to timelines associated with clearance of non-US citizens, personnel performing repairs must be US citizens.
GENERAL INFORMATION
This work does not involve confidential or proprietary data. The certification and accreditation requirements of Clause
1352.239-73 do not apply and a security accreditation package is not required.
Security
NIST is a restricted campus. An identification badge is required for access for entry into buildings and also is shown to the armed Security Police when entering the campus. Contractor personnel must wear the identification badge issued by
NIST Security while working at any NIST campus.
Regular Business Hours
Regular business hours are Monday through Friday, 8:00 am to 5:00 pm local time.
Vehicle Registration
All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the
NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle in accordance with NIST Security Office instructions.
ADDENDUM TO BILLING INSTRUCTIONS
In addition to the information required by NIST LOCAL CLAUSE 04 entitled “Billing Instructions”, the Contractor shall also include all of the following with each invoice:
o A copy of the delivery ticket provided to NIST for the service call being billed;
o The model number of the instrument repaired; and o The serial number of the instrument repaired.
File details come from the government source that posted it. Updated .