SOLICITATION SB1341-13-RP-0051

View the file

Other files for this federal contract opportunity

Other files attached to class 1000 clean room mini environment, newest first.
File Type Posted
DRAWINGS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

�����
��������

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

���������������������������������
���������� ��!����������������������������"���

���� #$��%&'(�)'%(�*#�++��$,-&�.$(/%(0�&)$ )�+$&1�(�1�2*��&1�)%0.+$'$�-'�3-'#-& )�+$&1�(�1�2*��/'$(�($)$-4-&, &%'-)$�'%�.(%)$$1��� #-*�.$(/%(0�&)$�.$(-%1�-*�3�(15 0�&1�'%(2 &$,%'-��+$������� ��

�����������
����������������
���������6
����!"���!�������
�#��$���$�#�%�����

�������������� �7

1� �//$(*�.(%4-1-&,�+$**�'#�& )�+$&1�(�1�2*�/%(��%4$(&0$&'��))$.'�&)$��/'$(�'#$�1�'$�%//$(*��($�18$�3-++�&%'��$�)%&*-1$($1��&1�3-++��$

($9$)'$1�

++ �%//$(* ��($ �*8�9$)'�'%�'#$�"�: �3%(;�($<-8($0$&'*5��&1 �"�: �%'#$(�.(%4-*-%&*��&1�)+�8*$*�-&)%(.%(�'$1�-&�'#$�*%+-)-'�'-%&�-&�/8++�'$='�%(��2

&�%//$(�,8�(�&'$$ -*5 -*�&%'�($<8-($1�

�����$�+$1�%//$(*�-&�%(-,-&�+��&1 )%.-$*�'%�.$(/%(0�'#$�3%(;�($<8-($1��($�18$��'�'#$�.+�)$�*.$)-/-$1�-&��'$0����2 ���� �

+%)�+�'-0$ "1�'$:����/�'#-*�-*���*$�+$1��-1�*%+-)-'�'-%&5�%//$(*�3-++��$�.8�+-)+2�%.$&$1��'�'#�'�'-0$����$�+$1�$&4$+%.$*

)%&'�-&-&,�%//$(*�*#�++��$�0�(;$1�'%�*#%3�'#$�%//$(%(>*�&�0$��&1��11($**5�'#$�*%+-)-'�'-%&�&80�$(5��&1�'#$�1�'$��&1�'-0$�%//$(*��($�18$�

�����?@�A��A�??A���� �����
���

������"�����@A�?:

�($*)(-�$1��2��� �A��

��"@�����:�?����BA�"1:

@������
����� ?������������C�����
�������������

See Attached

6. PROJECT PLAN

OFFER (Must be fully completed by offeror)

�B������

��� #$�%//$(%(��,($$*�'%�.$(/%(0�'#$�3%(;�($<8-($1��'�'#$�.(-)$*�*.$)-/-$1��$+%3�-&�*'(-)'��))%(1�&)$�3-'#�'#$�'$(0*�%/�'#-*�*%+-)-'�'-%&5�-/�'#-*�%//$(�-*��))$.'$1

�2�'#$��%4$(&0$&'�-&�3(-'-&,�3-'#-& )�+$&1�(�1�2*��/'$(�'#$�1�'$�%//$(*��($�18$������&

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

�����������������
�����D�������������������/
��� ��)���������
�

AWARD (To be completed by Government)

���������
������7
��������
���������
�����������������������
���

�B��

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

��������������
��������������
�����D����������
���������
���
��������������������&��

'%�/8(&-*#��&1�1$+-4$(��++� -'$0*�%(�.$(/%(0��++�3%(;�($<8-($0$&'*�-1$&'-/-$1�%&�'#-* /%(0��&1��&2�)%&'-&8�'-%&�*#$$'*�/%(�'#$�)%&*-1$(�'-%&�*'�'$1�-&�'#-*�)%&'(�)'��� #$ (-,#'*��&1�%�+-,�'-%&*�%/�'#$�.�('-$*�'%�'#-*�)%&'(�)'�*#�++��$�,%4$(&$1��2�"�:�'#-* )%&'(�)'� �3�(15� "�:� '#$� *%+-)-'�'-%&5� �&1� "):� '#$� )+�8*$*5� ($.($*$&'�'-%&*5 )$('-/-)�'-%&*5� �&1� *.$)-/-)�'-%&*� -&)%(.%(�'$1� �2� ($/$($&)$� -&� %(� �''�)#$1� '%� '#-*

�E��

%8(�%//$(

%&�'#-*�*%+-)-'�'-%&�-*�#$($�2��))$.'$1��*�'%�'#$�-'$0*�+-*'$1��� #-*��3�(1�)%&*800�'$* '#$�)%&'(�)'5�3#-)#�)%&*-*'*�%/�"�:�'#$��%4$(&0$&'�*%+-)-'�'-%&��&1�2%8(�%//$(5��&1�"�:

'#-*�)%&'(�)'��3�(1����%�/8('#$(�)%&'(�)'8�+�1%)80$&'�-*�&$)$**�(2�

����������
�������������"��/
��� ��)���
� ������������
������
�����
���

������"�����@A�?:�����

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

PAGE 3 OF 82 SB1341-13-RP-0051

This is a solicitation for a firm-fixed price construction contract NAICS 332311. The Contractor shall provide all labor, material and equipment to provide, or fabricate and install a self-contained temperature and humidity controlled class 1000 clean room mini environment, (hereinafter referred to as the clean room) as described herein and the attached drawings.

The magnitude of the this project is Between $25,000 and $100,000.

Attachments:

1. Scope of Work (SOW)

2. Guidelines for Contractor

3. Drawings

The contractor is required to submit a safety plan for this project. The contractor shall provide a safety plan within (5) calendar days from contract award to the contracting Safety officer CORS. The government has

(7) calendar days to review and provide comments or approve the safety plan. The contractor has (3) calendar days to respond to the contracting officer to revise the safety plan.

NIST Contracting Safety Officer: Kathryn Ritchie, 301) 975-6999, kathryn.ritchie@nist.gov

The contractor shall not proceed with this award until a Notice to Proceed (NTP) is issued from the contracting officer.#

Contractor shall provide a firm-fixed price quote:

Quotation must include the following if applicable:

1. Work/Cost breakdown

2. Breakdown of Subcontractor with subcontractor's proposal

3. Percentage (%) of Field overhead

4. Percentage (%) of Prime Overhead on Subcontractor

5. Percentage (%) of Prime's Home Office Overhead

6. Percentage (%) of Prime's Profit

7. Percentage (%) of Labor performed by Prime on Site

Construct a Class 1000 cleanroom.

0001 Contractor shall supply all labor, material and equipment to provide and install a self-contained temperature and humidity controlled class 1,000 clean room mini environment as per the attached statement of work, drawings, and specifications.

1.00 JB

Provide site-specific health and safety plan.

0002 Provide 10 days after contract award a site-specific health and safety plan.

1.00 EA

Table of Contents

PAGE 4 OF 82 SB1341-13-RP-0051

SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 STATEMENT OF WORK

SECTION E INSPECTION AND ACCEPTANCE

E. 1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

SECTION F DELIVERIES OR PERFORMANCE

F. 1 52.247-34 F.O.B. DESTINATION (NOV 1991)

F. 2 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)

SECTION G CONTRACT ADMINISTRATION DATA

G. 1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

G. 2 1352.201-72 CONTRACTING OFFICER?s REPRESENTATIVE (C0R) (APR 2010)

G. 3 1352.237-75 KEY PERSONNEL (APR 2010)

G. 4 NIST LOCAL-04 BILLING INSTRUCTIONS

SECTION H SPECIAL CONTRACT REQUIREMENTS

H. 1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)

H. 2 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

H. 3 1352.228-70 INSURANCE COVERAGE (APR 2010)

H. 4 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)

H. 5 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

H. 6 1352.237-73 FOREIGN NATIONAL VISITOR AND GUEST ACCESS TO DEPARTMENTAL RESOURCES (APR

2010)

SECTION I CONTRACT CLAUSES

I. 1 52.203-3 GRATUITIES (APR 1984)

I. 2 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)

I. 3 52.203-7 ANTI-KICKBACK PROCEDURES (OCT 2010)

I. 4 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY

(JAN 1997)

I. 5 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)

I. 6 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)

I. 7 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)

I. 8 52.204-7 CENTRAL CONTRACTOR REGISTRATION (DEC 2012)

I. 9 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

I. 10 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (AUG 2012).. 27

I. 11 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER MAINTENANCE (DEC 2012)

I. 12 52.204-13 CENTRAL CONTRACTOR REGISTRATION MAINTENANCE (DEC 2012)

I. 13 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

I. 14 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

I. 15 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

I. 16 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

I. 17 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2011)

I. 18 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (APR 2012)

I. 19 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

I. 20 52.222-3 CONVICT LABOR (JUN 2003)

I. 21 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT--OVERTIME COMPENSATION (JUL 2005).. 28

I. 22 52.222-6 DAVIS-BACON ACT (JUL 2005)

I. 23 52.222-7 WITHHOLDING OF FUNDS (FEB 1988)

I. 24 52.222-8 PAYROLLS AND BASIC RECORDS (JUN 2010)

PAGE 5 OF 82 SB1341-13-RP-0051

I. 25 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

I. 26 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

I. 27 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (JUL 2005)

I. 28 52.222-12 CONTRACT TERMINATION--DEBARMENT (FEB 1988)

I. 29 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS (FEB 1988)

I. 30 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

I. 31 52.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)

I. 32 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)

I. 33 52.222-26 EQUAL OPPORTUNITY (MAR 2007)

I. 34 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999)

I. 35 52.222-30 DAVIS-BACON ACT-PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD) (DEC

2001)

I. 36 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. [SEP 2010]

I. 37 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010

I. 38 52.222-37 EMPLOYMENT REPORTS VETERANS (SEP 2010)

I. 39 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC

2010)

I. 40 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)

I. 41 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JUL 2012)

I. 42 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)

I. 43 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

I. 44 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I. 45 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION

CONTRACTS (MAY 2008)

I. 46 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011). 30

I. 47 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

I. 48 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

I. 49 52.228-11 PLEDGES OF ASSETS (JAN 2012)

I. 50 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (OCT 1995)

I. 51 52.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999)

I. 52 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

I. 53 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I. 54 52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)(FEB 2013)

I. 55 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (SEP 2002)

I. 56 52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)

I. 57 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (OCT 2008)

I. 58 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--CENTRAL CONTRACTOR REGISTRATION (OCT

2003)

I. 59 52.233-1 DISPUTES (JUL 2002)

I. 60 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

I. 61 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

I. 62 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

I. 63 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

I. 64 52.236-8 OTHER CONTRACTS (APR 1984)

I. 65 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

I. 66 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

I. 67 52.236-12 CLEANING UP (APR 1984)

I. 68 52.236-13 ACCIDENT PREVENTION (NOV 1991)

I. 69 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

I. 70 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

PAGE 6 OF 82 SB1341-13-RP-0051

I. 71 52.236-21 I SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)--ALTERNATE I (APR

1984)

I. 72 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

I. 73 52.242-13 BANKRUPTCY (JUL 1995)

I. 74 52.242-14 SUSPENSION OF WORK (APR 1984)

I. 75 52.243-4 CHANGES (JUN 2007)

I. 76 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (DEC 2010)

I. 77 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

I. 78 52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2010)

I. 79 52.249-2 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)--

ALTERNATE I (SEP 1996)

I. 80 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

I. 81 52.203-12 DEV 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(DEVIATION NOV 1990) (JUN 1997)

I. 82 52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL ITEMS) (AUG

2012)

I. 83 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

I. 84 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)

I. 85 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION

CONTRACTS (JUL 2012)

I. 86 52.225-9 BUY AMERICAN ACT--CONSTRUCTION MATERIALS (SEP 2010)

I. 87 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

I. 88 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (APR 1984)

I. 89 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I. 90 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

I. 91 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

SECTION J LIST OF ATTACHMENTS

SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K. 1 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)

K. 2 52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OERATIONS IN SUDAN--CERTIFICATION

(AUG 2009)

K. 3 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR

TRANSACTIONS RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS (DEC 2012)

K. 4 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2012)

K. 5 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (APR 2012)

K. 6 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--CONSTRUCTION MATERIALS (FEB 2009)

K. 7 1352.209-70 POTENTIAL ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L. 1 52.211-6 BRAND NAME OR EQUAL (AUG 1999)

L. 2 52.215-16 FACILITIES CAPITAL COST OF MONEY (JUN 2003)

L. 3 52.204-6 DATA UNIVERSAL NUMBERING SYSTEM NUMBER (DEC 2012)

L. 4 52.215-20 IV REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED

COST OR PRICING DATA (OCT 2010)--ALTERNATE IV (OCT 2010)

L. 5 52.216-1 TYPE OF CONTRACT (APR 1984)

L. 6 52.222-5 DAVIS-BACON ACT -- SECONDARY SITE OF THE WORK (JUL 2005)

L. 7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

L. 8 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

PAGE 7 OF 82 SB1341-13-RP-0051

L. 9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

L. 10 1352.215-72 INQUIRIES (APR 2010)

L. 11 1352.233-70 AGENCY PROTESTS (APR 2010)

L. 12 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)

SECTION M EVALUATION FACTORS FOR AWARD

PAGE 8 OF 82 SB1341-13-RP-0051

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 STATEMENT OF WORK

STATEMENT OF WORK

Project Name: Installation of Mass Spectrometer Procurement and Installation of Class 1,000 Temperature and Humidity Controlled Clean Room Mini- Environment

Project Location: Building 245 Rooms C-10 Basement

Start Date: 1 Week from contract award

A. Brief description of work:

Contractor shall supply all labor, material and equipment to provide, or fabricate and install a self-contained temperature and humidity controlled class 1,000 clean room mini environment (hereinafter referred to as the clean room) as described herein and the attached drawings.

B. Period of Performance:

1) The clean room mini environment shall be designed, fabricated and installed within 90 days from contract award.

2) On-site installation shall not start until all material and components are delivered on site.

C. Product Requirements:

1) Refer to attached drawings for clean room area outline, doors and type of panels and locations.

2) The clean room shall consist of two sections separated by a sliding glass door;

a. A 12’x12’ temperature and humidity controlled clean room

b. A 4’x6’ gowning vestibule/anteroom

3) The clean room enclosure shall be standalone and provided with its own HVAC equipment to provide air circulation as well as temperature and humidity control.

4) Entrance to the clean room shall be via removable entry vestibule. The removable vestibule shall be configured such that it can demounted and temporarily moved away to enable the passage of instrument in and out of the room. The two spaces shall be separated by a 48”x84” sliding glass door.

Otherwise, the vestibule shall be securely fastened to the clean room enclosure.

PAGE 9 OF 82 SB1341-13-RP-0051

Parameter Main Room Gowning Area Notes

Class 1,000 1,000 1, Dimensions (LxW)

12’x12’ (nominal) 4’x6’ (nominal) 1, 2

Type Free standing panel-post designs

Matching 1, 2, 3

Dimensions (L x W)

12’-2” x 12’-2” 4’-0” x 6’-2” 1, 2

Ceiling Height 9’-0” Matching 1, 2 Structure Tubular steel or anodized aluminum posts

Matching 1, 3

Ceiling grid T-Bar (self supporting) Matching 1, 3 Panels

Opaque Laminated w/epoxy coating

Matching 2, 3

Transparent Clear acrylic Matching 2, 3

Door 48”x84” Sliding 36”x84” Single Swing 2, 5, 13 Filtration 2’x4’ HEPA filter media Matching Filter Housing Aluminum or epoxy coated sheet metal or steel

Matching 3, 4

Lights 24”x48” Fluorescent Matching 2 Power receptacles

120V, 60Hz, Single Phase

None Required 2

Telephone and Data Outlets

2 1 2, 11

Mounting brackets

4 Additional for instrument disconnect, EPO, fire alarm & spare

None Required 2, 11

Penetrations Through Ceiling:

12” Exhaust manifold

None Required 2

Through Wall: Chilled Water 2x¾” Power, Ar and N2

PAGE 10 OF 82 SB1341-13-RP-0051

Temperature & Humidity Control Type Self-Contained, air cooled DX 6, 10 Design Temperature

64–75 oF 7

Temperature Stability

< 3 oF/Hour 7

Relative Humidity 50-60% 7 Heat Load 6 KW 7, 8 Occupancy 1 Person 7 Exhaust/makeup air

400 CFM 7

Makeup Air temperature

65 oF Summer 75 oF Winter

Air Distribution Supply:

Pressurized plenum or individually ducted fan powered modules

Return:

Low mounted grilles ducted to A/C unit 12

Accessories T-stat Humidistat Condensate pan Condensate pump Control panel

NOTES:

1. HEPA coverage in anti/gowning room is limited to a single 24”x48” filter module.

Therefore, may be limited to a different clean room classification.

2. Refer to attached drawings for details.

3. Clean room construction shall allow for static electricity dissipation.

4. Nonmetallic filter housing not allowed.

5. Provide with provisions for owner installed locking mechanism.

6. One system for both areas.

7. Inside clean room conditions

8. Excludes light & ballast, if required.

9. Makeup air drawn from ambient air conditioned indoor space or ducted to main duct serving space.

10. Cleanroom and its dedicated HVAC system to be provided and installed by a single source. Provide with temperature and humidity sensors inside the clean room space and main controller mounted on the outside wall of cleanroom.

11. Devices provided and installed by NIST. Mounted brackets are required only if cutting and/or drilling into panels causes damage to the wall system.

12. Supplier to provide space requirements for review by NIST.

13.Swinging door lock shall be Schlage standard duty commercial ANSI A156.2 Series

4000 grade 2 cylindrical Entrance/office lock in interchangeable Core format

PAGE 11 OF 82 SB1341-13-RP-0051

5) Entrance to the vestibule shall be via a 36”x84” swinging door. The swinging door shall be equipped with vision glass a minimum of 28% of its surface area.

D. Material of Construction:

1) Clean Room and Entry Vestibule Enclosure, General:

i. The two sections shall be sized and arranged as listed above and as shown on attached drawings.

ii. Together with its self-contained HVAC system, ductwork and accessories, the clean room mini environment shall be designed and fabricated to fit in the designated area in the lab and accessible via a single door located as shown.

iii. The thickness of the mini environment wall assemblies shall not exceed 2¼" at any location except at the single sliding glass door separating the gowning room and the main clean room.

iv. The clean room mini environment shall be able to be disassembled in sections and/or pieces for future reconfiguration, disassembly, storage and/or disposal.

v. All surfaces, edges and corners shall be true to line and free from projections that could cause injury or damage.

vi. Accessibility:

The clean room assembly shall be provided with means to move the instruments in and out. This can be accomplished by means of a service door and/or hinged or removable panels.

2) Framing Components

i. All studs and battens shall be aluminum extrusions with anodized clear finish.

ii. Studs and battens shall fasten together tightly creating a sealed joint connection and secure alignment of panels.

iii. All connections of horizontal and vertical framing shall be secured properly utilizing engineered devices as specified by the clean room manufacturer to pull all joints together.

iv. The batten shall clamp against the front of the post and permit the attachment of conduit, shelving, and utility hardware through the screw boss in the batten.

v. The back of the stud post shall provide a strut design to support utility lines and piping.

PAGE 12 OF 82 SB1341-13-RP-0051

vi. A removable enclosure cap conceals fasteners of the batten to the stud post.

vii. Studs and battens shall allow wall panels to be installed or removed easily without disturbing adjacent wall panels or ceiling. All vertical framing members and corners, shall be interchangeable and capable of being placed anywhere along the wall plane and corners without loss of strength.

viii. Materials and connections shall be manufacturer's standard, capable of supporting design forces. Provision shall be made for movement of surrounding structure in design of separations and joints. Structural members shall be sufficiently stiff to allow proper operations of vibration isolation equipment and ceiling filter sealant systems.

ix. The framing system shall be coordinated with building structure to perform under vertical and lateral design loads and seismic requirements.

x. Deflection head must be capable of 3/4" downward movement.

xi. Materials:

1. Metal Framing: Aluminum 6063-T5 alloy.

2. Fittings: ASTM-A36 or ASTM-A635.

3. Finish: 201R1 anodized, clear finish.

3) Clean Room Wall Panel System:

i. Wall panels shall be finished flush on one side and minimize the need for field cutting.

ii. Opaque Panels:

Opaque wall panels shall be .032" smooth aluminum with a smooth conductive epoxy finish laminated to both sides of an aluminum honeycomb core.

a. Wall panel shall have a surface resistivity in the range of 106 to 109 ohms/square per EOS/ESD-S11.11-1993, which supersedes ASTM- D257, and an electrostatic decay of <10% IN, .5/sec. per method 4066 Federal Test Method Standard 101B.

b. Colors: As selected by the Owner from manufacturer's standard panel colors.

iii. Transparent Panels:

Transparent Panels shall be 1/4" tempered safety glass.

iv. Return Air Grilles:

PAGE 13 OF 82 SB1341-13-RP-0051

Return air grilles shall be manufacturer's standard installation designed to fit the clean room’s wall system.

4) Electrical Requirements:

Provide top mounted independent single point connection junction boxes as follows:

i. Instrument Power:

a) Provide 3P-30A, 25A Fuse, 600V, HD Disconnect Switch with locking provision plate Cat#: EATON DH321NGK.

b) Provide feeder 4-6AWG+1-10AWG Gnd THHN Copper wire in 1” EMT conduit from disconnect to a terminal junction box by terminating wires to a terminal blocks with separation barrier mounted on the ceiling for easy connection of power feed at site.

ii. Power Strip

a) Provide Aluminum Wiremold raceway Type ALA4800 with dividers one for power and one for mounting Tele-data devices, along the wall.

b) Provide 20A, 120V, 6 orange color isolated ground dedicated duplex receptacles (4 on west & 2 on east) on the raceway.

c) Provide 20A, 120V, 4 ivory color duplex receptacles 2 on either side on the raceway.

d) Provide 12AWG wire for receptacle circuit with 10 twists per foot. The circuits run in raceway power channel and terminate above ceiling at terminal blocks with separation barrier in a box for easy connection of circuit at site.

iii. HVAC Power & Lighting Provide Terminal block with separation barrier junction box for mechanical AC units and ceiling lighting for easy connection at site.

Power available 208V single or 3 Phase.

iv. Emergency Power Trip Provide Emergency Trip Pushbutton with push to trip 2 separate 120V contacts and wire with 12AWG THHN Copper wire. Terminate 2 Trip circuit and terminate above ceiling at terminal blocks with separation barrier in a box for easy connection of circuit at site.

v. Fire Alarm Provide a junction box with empty 3/4” conduit with pull string up to a junction box for installing Fire Alarm Strobe and wiring by NIST at site.

E. Manufacturers:

1) The use of a manufacturer's name, model or catalog number is for the purpose of establishing the standard of quality and general configuration.

PAGE 14 OF 82 SB1341-13-RP-0051

Provide clean room mini environment designed, fabricated and assembled by a single supplier listed or approved equal.

2) Contractor shall provide and install a Class 1000 hard wall modular cleanroom enclosure with packaged HVAC system, per specification and attached drawings. The entire clean room assembly shall be the end product of a firm who is experienced in the design and manufacturing of modular cleanrooms and guarantees achieving the required performance and the standardization for appearance, maintenance, and replacement parts.

3) Acceptable manufacturers include:

The contractor may provide and install a complete temperature and humidity controlled modular cleanroom system from any of the manufactures listed below or approved equal.

a. Porta-Fab Corporation 18080 Chesterfield Airport Road Chesterfield, MO 63005 U.S.A.

Phone: (636) 537-5555 Fax: (636) 537-2955

b. Huntair, Inc.

19855 SW 124th Avenue Tualatin, Oregon 97062 Phone: 503-639-0113 Fax: 503-639-1269

c. Cleanair Solutions, Inc.

826 Bayridge Place Fairfield, CA 94534 Phone: (707) 864-9499 Fax: (707) 864-9399

d. Ultrapure Technology, Inc.

325 Brogdon Road, Suite A Suwanee, GA 30024 Phone: (770) 932-0309 Fax: (770) 932-0809

E. General Requirements:

The Contractor and his employees and subcontractors shall become familiar with and obey all NIST Site Regulations, including fire, traffic, and security regulations. All personnel employed on the site shall keep within the limits of the work (and avenues of ingress and egress), and shall not enter any restricted areas unless required to do so and are cleared for such entry.

PAGE 15 OF 82 SB1341-13-RP-0051

F. Material / Equipment Storage

1) Contractor access shall be limited to the designated work area and the general areas in the building.

2) All material must be stored in the area designated by the COR outside the building. The Contractor shall adequately protect all materials from the weather.

3) The Contractor shall not store any material inside the building.

4) The Contractor’s tools and equipment shall be conspicuously marked for identification. The contractor shall be responsible for securing and protecting all tools, equipment and/or material used, stored or staged on the job site at all times.

G.Environmental Protection

1) Disposal of Refuse:

a. Unless otherwise noted, the Contractor is totally responsible for the removal and disposal of all demo material, refuse, garbage and trash associated with this project. Disposal of such material shall be in accordance with the requirements of the local jurisdiction.

2) Disposal of Hazardous Wastes:

a. Any hazardous wastes generated by the Contractor shall be properly controlled and disposed by the Contractor in accordance with applicable RCRA (40CFR) and COMAR (Title 26) regulations.

3) Covered Chutes:

a. All chutes for refuse, and the like, shall be covered, or of such a design to fully confine the material to prevent the dissemination of dust.

H.Construction Site Maintenance:

1) The Contractor and all Subcontractors on, or delivering material to, the site shall conform to all local regulations regarding load limits.

2) The Contractor shall store all Contractor tools, equipment and material supplies on project site so as to preclude mechanical and climatic damage and maintain site in a neat and orderly manner.

3) Contractor shall be responsible for maintaining any temporary structures clean, visually pleasant and in good repair.

I. Noise Control:

PAGE 16 OF 82 SB1341-13-RP-0051

The Contractor shall comply with all applicable local laws, ordinances, and regulations relative to noise control. Any noise generating activities shall be planned and the building occupants notified in advance.

J. Asbestos Material:

No asbestos containing material is expected to be encountered by the Contractor on this project. If material is encountered that looks suspicious but must be disturbed, do not touch the material and immediately notify the COR in writing. Within fourteen

(14) calendar days, the Government will perform laboratory tests to determine if there is asbestos. If asbestos is not a danger, the Contracting Officer will direct the Contractor to proceed without change. If the material encountered is suspect or confirmed to contain asbestos, the Contracting Officer will direct a change.

K.Occupational Safety and Health:

1) NIST, as a Federal government facility in the State of Maryland, is under the jurisdiction of the OSHA Region III regional office, which may assign an OSHA Compliance Safety and Health Officer (CSHO) to conduct safety and health inspections of the Contractor’s operations at the NIST Gaithersburg site.

Accordingly, the Contractor is subject to OSHA Citations and Notices of Penalty for noncompliance with OSHA standards.

2) To protect its own interests, NIST may also conduct periodic safety and health inspections to assure that NIST employees/property are not at risk of injury/damage from Contractor operations, and to avoid the risk of OSHA Citations under the OSHA multi-employer worksite provisions.

3) Control of Hazardous Energy (Lockout/Tag-out): In accordance with the provisions of OSHA standards 29CFR1910.147 and 29CFR1926.417, the Contractor shall establish and implement a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on electrical circuits/equipment, machines or other equipment/systems where the unexpected energizing, start up or release of stored energy could occur and cause injury, the circuit/machine/equipment/system shall be isolated from the energy source and rendered inoperative.

4) Electrical Installations and Work Practices: The Contractor shall comply with all applicable installation safety requirements, safety-related maintenance and environmental considerations, and safety requirements for special equipment as contained in Subpart K (Electrical) of 29CFR1926.

5) Personal Protective and Life Saving Equipment: In accordance with the provisions of Subpart E (Personal Protective and Life Saving Equipment) of 29CFR1926, the Contractor shall ensure that protective equipment (including personal protective equipment for eyes, head, face, head and extremities;

protective clothing; respiratory devices; and protective shields and barriers) shall

PAGE 17 OF 82 SB1341-13-RP-0051

be provided, used and maintained in a sanitary and reliable condition whenever it is necessary by reason of hazards of process or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of the body through absorption, inhalation or physical contact. The contractor shall wear safety glasses at all times at NIST.

6) Tools-Hand and Power: The Contractor shall ensure compliance with all applicable safety requirements for tools (hand and power) as outlined in Subpart I (Tools-Hand and Power) of 29CFR1926.

L. Security:

1) The Contractor(s) shall be on the NIST grounds only between the hours of 6:30 a.m. and 5:30 p.m. (normal work hours) on normal Federal work days. Should the Contractor(s) desire to work at times other than those specified above, the dates and hours must be scheduled at least seven (7) working days in advance and approved by the NIST Security Office through the Contracting Officer. After hours work will require a Government escort 100% of the time.

2) Prior to the employment of any foreign national at the contract work site, the Contractor must have such employees approved by the Servicing Security Office in consultation with the Department’s Office of Security in accordance with the National Security Threat List. The name, country of citizenship, and employer for each Contractor and subcontractor’s employee (visitor) working on the NIST site shall be submitted to the COR for review thirty (30) days prior to the work date.

Non U.S. citizens to be employed under this contract must have official legal status in the U.S. and have continuously resided in the United States for the last five years.

3) Contractor personnel may be required to wear picture identification badges at all times on the NIST grounds, as determined by the Contracting Officer. Contractor will be required to complete a Department of Commerce background check.

4) The main gate at the National Institute of Standards and Technology site shall be used for material supply and personnel by the Contractor and subcontractors unless otherwise directed by the COR. The gate will be open from 6:30 a.m. and 5:30 p.m., Monday through Friday inclusive. Special arrangements may be made through the Contracting Officer and National Institute of Standards and Technology for normal access, material supply, and/or overtime beyond these hours or on Holidays.

M. Submittals:

Submit the following in addition to the standard requirements.

1) Manufacturer's literature, specifications, details, and installation instructions for each cleanroom wall component proposed. Including technical data as may be

PAGE 18 OF 82 SB1341-13-RP-0051

required to show compliance with applicable codes and standards as well as design and specifications.

2) Provide one sample of each wall system component with proposed finishes, gaskets, and connectors. Include any other components as necessary to illustrate a completed wall assembly.

3) One set of samples of each finish and color required. Submit sample finishes on aluminum having the specified alloy, temper, finish-coating treatment, and thickness of metal required for the work.

4) Provide 6-inch (minimum) square color samples of available standard wall panel colors and finishes.

5) All samples will be reviewed for color and finish only. Compliance with all other requirements is the exclusive responsibility of the Contractor.

N. Delivery Storage and Handling:

1) Deliver materials in their original, unopened packages.

2) Wall system panels shall be delivered with an approved clear PVC film. Wall system shall be packaged to prevent transit and construction dust from contaminating surfaces. Stripping of packaging and coatings to be done after installation of wall panels.

3) Exercise extreme care in handling all cleanroom wall system components to prevent damage.

4) Store materials within the building in the space designated for cleanroom component storage. Store materials in such manner as to prevent damage or intrusion of foreign matter. Conspicuously mark "Rejected" on materials, which have been damaged, and remove from the job-site.

O. Installation and Testing:

1) Final installation of partition components shall assemble into a rigid structure with tight straight-line joints. Completed installation shall be free of exposed bolts, nuts, rivets, and fasteners within the cleanroom area and shall interface with a ll mechanical and electrical work in a clearly preplanned and craftsman-like installation.

2) Contractor shall obtain third party testing and certification of cleanroom to Federal Standard 209E Class 1000 (ISO 6) after initial installation per ISO Standards 14644-1, 14644-2, and 14644-3. Minimum tests should include:

a. Particle Counts

b. HEPA Filter Leak Test

c. Room Pressurization

PAGE 19 OF 82 SB1341-13-RP-0051

d. Temperature/Relative Humidity

3) Contractor shall provide startup, testing and balancing, and commissioning of HVAC system.

P. Warranty

1) Provide sub-system and component manufacturer standard warranties.

2) Provide warranty against defects and workmanship for a period of one (1) year from date of startup and commissioning.

Q. Additional Materials Provide spare parts as recommended by system manufacturer.

R. Attachments The attached drawings (A1.1, A1.02, A1.03, A1.04 and E1-CR1) are to be used for reference and are considered integral to this solicitation.

------------------------------------------------------ END OF SOW

PAGE 20 OF 82 SB1341-13-RP-0051

SECTION E

INSPECTION AND ACCEPTANCE

E. 1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(Reference 52.246-12)

PAGE 21 OF 82 SB1341-13-RP-0051

SECTION F

DELIVERIES OR PERFORMANCE

F. 1 52.247-34 F.O.B. DESTINATION (NOV 1991)

(Reference 52.247-34)

F. 2 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)

(a) The base period of performance of this contract is from the date of award through 90 days after the date of award . If an option is exercised, the period of performance shall be extended through the end of that option period.

(b) The option periods that may be exercised are as follows:

Period Start Date End Date Option I Option II Option III Option IV

(c)The notice requirements for unilateral exercise of option periods are set out in FAR 52.217-9.

(End of clause)

PAGE 22 OF 82 SB1341-13-RP-0051

SECTION G

CONTRACT ADMINISTRATION DATA

G. 1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

G. 2 1352.201-72 CONTRACTING OFFICER?s REPRESENTATIVE (C0R) (APR 2010)

(a) (TO BE IDENTIFIED AT THE TIME OF AWARD) is hereby designated as the Contracting Officer?s Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:

CONTACT INFORMATION SHALL BE IDENTIFIED AT THE TIME OF AWARD

Phone Number:

Email:

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer.

The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.

G. 3 1352.237-75 KEY PERSONNEL (APR 2010)

(a) The contractor shall assign to this contract the following key personnel:

(TO BE IDENTIFIED AT THE TIME OF AWARD) PROJECT MANAGER

(b) The contractor shall obtain the consent of the Contracting Officer prior to making key personnel substitutions. Replacements for key personnel must possess qualifications equal to or exceeding the qualifications of the personnel being replaced, unless an exception is approved by the Contracting Officer.

(c) Requests for changes in key personnel shall be submitted to the Contracting Officer at least 15 working days prior to making any permanent substitutions. The request should contain a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. The Contracting Officer will notify the contractor within 10 working days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes.

(End of Clause)

G. 4 NIST LOCAL-04 BILLING INSTRUCTIONS

PAGE 23 OF 82 SB1341-13-RP-0051

(a) NIST prefers electronic Invoice/Voucher submissions and they should be emailed to AMDINV@NIST.GOV and INVOICE@NIST.GOV

(b) Each Invoice or Voucher submitted shall include the following: (1) Contract Number. (2) Contractor Name and Address. (3) Date of Invoice. (4) Invoice Number. (5) Amount of Invoice and Cumulative Amount Invoiced to-date. (6) Contract Line Item Number (CLIN). (7) Description, Quantity, Unit of Measure, Unit Price, and Extended Price of Supplies/Services Delivered. (8) Prompt Payment Discount Terms, if Offered. (9) Any other information or documentation required by the contract.

(c) In the event electronic submissions are not used, The Contractor shall submit an original invoice or voucher in accordance with the payment provisions of this contract to:

NIST: Accounts Payable Office 100 Bureau Drive, Mail Stop 1621 Gaithersburg, MD 20899-1621

PAGE 24 OF 82 SB1341-13-RP-0051

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H. 1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)

(Reference 1352.208-70)

H. 2 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

The contractor shall comply with all applicable laws, rules and regulations which deal with or relate to performance in accord with the terms of the contract.

H. 3 1352.228-70 INSURANCE COVERAGE (APR 2010)

(a) Workers Compensation and Employer?s Liability. The contractor is required to comply with applicable federal and state workers'' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer?s liability section of the insurance policy, except when contract operations are so commingled with a contractor?s commercial operations that it would not be practical to require this coverage. Employer?s liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers'' compensation to be written by private carriers.

(b) General liability.

(1) The contractor shall have bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

(2) When special circumstances apply in accordance with FAR 28.307-2(b), Property Damage Liability Insurance shall be required in the amount of $$500,000.00 .

(c) Automobile liability. The contractor shall have automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract.

Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

(e) Vessel liability. When contract performance involves use of vessels, the Contractor shall provide, vessel collision liability and protection and indemnity liability insurance as determined by the Government.

H. 4 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)

When the Government is injured, wholly or partially as a result of the contractor?s actions and such actions are covered by the insurance required by 1352.228-70, Insurance Coverage, the Government is entitled to recover from the contractor the full amount of any such injury attributable to the contractor regardless of a deductible. The Contracting Officer may offset the amount of recovery against any payment due to the contractor.

H. 5 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

PAGE 25 OF 82 SB1341-13-RP-0051

(a) Investigative Requirements for Low Risk Contracts. All contractor (and subcontractor) personnel proposed to be employed under a Low Risk contract shall undergo security processing by the Department?s Office of Security before being eligible to work on the premises of any Department of Commerce owned, leased, or controlled facility in the United States or overseas, or to obtain access to a Department of Commerce IT system. All Department of Commerce security processing pertinent to this contract will be conducted at no cost to the contractor.

(b) Investigative requirements for Non-IT Service Contracts are:

(1) Contracts more than 180 days - National Agency Check and Inquiries (NACI)

(2) Contracts less than 180 days - Special Agency Check (SAC)

(c) Investigative requirements for IT Service Contracts are:

(1) Contracts more than 180 days - National Agency Check and Inquiries (NACI)

(2) Contracts less than 180 days - National Agency Check and Inquiries (NACI)

(d) In addition to the investigations noted above, non-U.S. citizens must have a background check that includes an Immigration and Customs Enforcement agency check.

(e) Additional Requirements for Foreign Nationals (Non-U.S. Citizens). Non-U.S. citizens (lawful permanent residents) to be employed under this contract within the United States must have:

(1) Official legal status in the United States;

(2) Continuously resided in the United States for the last two years; and

(3) Obtained advance approval from the servicing Security Officer in consultation with the Office of Security headquarters.

(f) DOC Security Processing Requirements for Low Risk Non-IT Service Contracts. Processing requirements for Low Risk non-IT Service Contracts are as follows:

(1) Processing of a NACI is required for all contract employees employed in Low Risk non-IT service contracts for more than 180 days. The Contracting Officer?s Representative (COR) will invite the prospective contractor into e-QIP to complete the SF-85. The contract employee must also complete fingerprinting.

(2) Contract employees employed in Low Risk non-IT service contracts for less than 180 days require processing of Form OFI-86C Special Agreement Check (SAC), to be processed. The Sponsor will forward a completed Form OFI-86C, FD-258, Fingerprint Chart, and Credit Release Authorization to the servicing Security Officer, who will send the investigative packet to the Office of Personnel Management for processing.

(3) Any contract employee with a favorable SAC who remains on the contract over 180 days will be required to have a NACI conducted to continue working on the job site.

(4) For Low Risk non-IT service contracts, the scope of the SAC will include checks of the Security/Suitability Investigations Index (SII), other agency files (INVA), Defense Clearance Investigations Index (DCII), FBI Fingerprint (FBIF), and the FBI Information Management Division

(FBIN).

(5) In addition, for those individuals who are not U.S. citizens (lawful permanent residents), the Sponsor may request a Customs Enforcement SAC on Form OFI-86C, by checking Block #7, Item I. In Block 13, the Sponsor should enter the employee?s Alien Registration Receipt Card number to aid in verification.

(6) Copies of the appropriate forms can be obtained from the Sponsor or the Office of Security.

Upon receipt of the required forms, the Sponsor will forward the forms to the servicing Security Officer. The Security Officer will process the forms and advise the Sponsor and the Contracting Officer whether the contract employee can commence work prior to completion of the suitability determination based on the type of work and risk to the facility (i.e., adequate controls and restrictions are in place). The Sponsor will notify the contractor of favorable or unfavorable findings of the suitability determinations. The Contracting Officer will notify the contractor of an approved contract start date.

(g) Security Processing Requirements for Low Risk IT Service Contracts. Processing of a NACI is required for all contract employees employed under Low Risk IT service contracts.

(1) Contract employees employed in all Low Risk IT service contracts will require a National Agency Check and Inquiries (NACI) to be processed. The Contracting Officer?s Representative (COR) will invite the prospective contractor into e-QIP to complete the SF-85. Fingerprints and a Credit Release Authorization must be completed within three working days from start of work, and provided to the Servicing Security Officer, who will forward the investigative package to OPM.

(2) For Low Risk IT service contracts, individuals who are not U.S. citizens (lawful permanent residents) must undergo a NACI that includes an agency check conducted by the Immigration and Customs Enforcement Service. The Sponsor must request the ICE check as a part of the NAC.

(h) Notification of Disqualifying Information. If the Office of Security receives disqualifying information on a contract employee, the Sponsor and Contracting Officer will be notified. The Sponsor shall coordinate with the Contracting Officer for the immediate removal of the employee from duty requiring access to Departmental facilities or IT systems. Contract employees may be barred from working on the premises of a facility for any of the following reasons:

(1) Conviction of a felony crime of violence or of a misdemeanor involving moral turpitude.

PAGE 26 OF 82 SB1341-13-RP-0051

(2) Falsification of information entered on security screening forms or of other documents submitted to the Department.

(3) Improper conduct once performing on the contract, including criminal, infamous, dishonest, immoral, or notoriously disgraceful conduct or other conduct prejudicial to the Government regardless of whether the conduct was directly related to the contract.

(4) Any behavior judged to pose a potential threat to Departmental information systems, personnel, property, or other assets.

(i) Failure to comply…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .