Sample_Task_Order_SB1341-13-RP-0001.pdf
PDF 248 KB Posted
- Solicitation number
- SB1341-13-RP-0031
About this file
Sample Task Order SB1341-13-RP-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_004.pdf | ||
| Questions__2.pdf | ||
| Amendment_002.pdf | ||
| Amendment_001.pdf | ||
| SB1431-13-RP-0031-001.docx | DOCX document | |
| Safety_Instructions.doc | DOC document | |
| Specification.zip | ZIP file | |
| SB1431-13-RP-0031_(Final).pdf | ||
| relocation_drawings.zip | ZIP file | |
| Guidelines_for_Contractors_ _A-E_Firms.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
NB1341-13-00001
6. PROJECT PLAN
7. ISSUED BY CODE 000SB 8. ADDRESS OFFER TO 000SB
NATIONAL INST OF STDS AND TECHNOLOGY
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
NATIONAL INST OF STDS AND TECHNOLOGY
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
9. FOR INFORMATION
CALL:
a. NAME
WILLIAM YOUNG
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
301-975-6289
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
SB1341-13-RP-0001
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
1 15
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
SOLICITATIO
N
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
See Attached
11. The Contractor shall begin performance 10 calendar days and complete it within 120 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See .)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12b).
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, X is not required.
c. All o ffers a re subject to the (1) work requirements, and(2) other r provisions and clauses incorporated in the solicitation in full text or by
d. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
30c. DATE
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum re-quirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
STANDARD FORM 1442 (REV. 4-85) BACK
PAGE 3 OF 15 SB1341-13-RP-0001
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE $ AMOUNT $
Accounting and Appropriation Data:
XX.11.0003.070102000.1951863.000.
1019019500000000.XXXXXXXXXXXXX
This is a Firm-Fixed-Price task order for construction services at the NIST Gaithersburg, MD Campus. This is an order against the IDIQ Contract No. SB1341-13-
CQ-XXXX. The terms and conditions of the IDIQ apply as well as the additional clauses included in this order.
Magnitude of Construction is between $250,000 and $500,000.
Period of Performance: 120 calendar days from issuance of NTP.
The Contractor shall coordinate schedule with the NIST Contracting Officer listed below. During performance of this requirement, any out-of-hours work shall be approved by the Contracting Officer. The Contractor shall submit the out-of-hours request to the Contracting Officer Technical Representative at least 48 hours prior to performance.
A letter from its surety demonstrating bonding capacity of $3,000,000, proof of insurance, and safety plan are required for this project. Once the safety plan has been approved by the NIST COR and the bond and insurance has been received, a Notice- to-Proceed will be executed by the Contracting Officer. The Contractor shall not begin work until the Notice is executed.
SECURITY ACCESS LEVEL: LOW
IT SECURITY ACCESS LEVEL: N/A
FOR INFORMATION CONCERNING THIS ORDER,
CONTACT THE FOLLOWING INDIVIDUALS:
The NIST Contracting Officer's Technical Representative (COTR) for this order is John Blank at (301) 975-XXX or email: John.blank@nist.gov.
mailto:%20or%20email:%20John.blank@nist.gov.
mailto:%20or%20email:%20John.blank@nist.gov.
PAGE 4 OF 15 SB1341-13-RP-0001
SCHEDULE
Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE $ AMOUNT $
PAGE 5 OF 15 SB1341-13-RP-0001
The NIST Contracting Officer's Safety Representative (COSR) for this order is Sharon May at (301) 975-0000 or email: Shawn.Mayo@nist.gov.
The NIST Contract Specialist for this order is William Old at (301) 975-6289 or email:
willie.olds@nist.gov.
The Contractor shall furnish all labor, supervision, materials and equipment for relocation of cleanroom equipment and laboratory hook-up services at the
National Institute of Standards and Technology (NIST)
Advanced Measurement Laboratory (AML) project at
Gaithersburg, MD, Building 215. in accordance with the
Statement of Work, Guidelines for Contractors, Safety
Instructions and Safety Forms.
1.00
JB
mailto:%20or%20email:%20Shawn.Mayo@nist.gov.
mailto:%20or%20email:%20Shawn.Mayo@nist.gov.
mailto:robin.jeffries@nist.gov.
PAGE 6 OF 15 SB1341-13-RP-0001
DESCRIPTION
Relocation of cleanroom equipment and laboratory hook-up services at the National Institute of Standards and Technology (NIST) Advanced Measurement Laboratory (AML) project at Gaithersburg, MD, Building 215.
The contractor shall be responsible for:
Laboratory hook-up (routing of services to new or relocated equipment) necessary to specific laboratory needs. Hook-up consists of mechanical, plumbing, electrical, specialty welding, and related work for the following.
Solvent Bench shall be relocated from Lab A104 to Lab A105.
Seven Valve Manifold Boxes (VMBs) and three purge panels shall be relocated from the 1st floor cleanroom to the basement floor Sub-Fab support area.
Rigging, unpacking and uncrating of materials, temporary equipment, specialty test and welding equipment, VMBs, and laboratory equipment.
Miscellaneous specialty work, vendor coordination, and user group activities coordination.
Detailed logistical planning for specialty equipment relocation/installation.
Trade and professional management.
Construction Phasing to limit number of outages to service, gases, fire protection, and toxic gas monitoring system. The cleanroom is a user facility that operates 24hrs, seven day a week. All outages shall be out of normal working hours on weekends and coordinated with COTR for approval with minimum of 14 day notice for coordination. No outage will be approved for greater than two day weekend.
Contractor shall follow the “Guidelines for Contractors and A/E Firms Performing Site Investigations and Fieldwork at National Institute of Standards and Technology Gaithersburg, MD”.
Contractor shall provide a copy of the safety plan to all employees working on the project once approved. The contractor shall provide to the COTR a list of employees receiving a copy with employees’ signature. The contactor shall follow and submit documents as outlined in NIST’s “Outline of a NIST Safety and Health Plan for a Specific Contract” and “ACCIDENT PREVENTION PROVISIONS FOR CONTRACTORS - GUIDE FOR PREPARATION OF ACCIDENT PREVENTION
PLANS”.
Contractors’ and Sub-Contractors’ Employees work on project shall attend a 3hr safety training class before proceeding with work in Building 215.
All Contractors’ and Sub-Contractors’ Employees shall obtain security badging to gain access to site and buildings.
When separate contracts are awarded for different portions of the Project or other construction or operations on the site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate Government Contractor Agreement.
The Contractor shall cooperate with other contractors and the Government in reviewing their construction schedules when directed to do so.
If part of the Contractor's Work depends for proper execution or results upon construction or operations by the Government or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Government apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor to report shall constitute an acknowledgment that the
PAGE 7 OF 15 SB1341-13-RP-0001
Government or separate contractors' completed or partially completed construction is fit and proper to receive the Contractor's Work, except for defects that are not then reasonably discoverable.
Costs caused by delays or by improperly timed activities or defective construction shall be borne by the party responsible for the delays, improper timing or defects.
The Contractor shall promptly remedy damage wrongfully caused by the Contractor to completed or partially completed construction or to property of the Government.
If a dispute arises among the Contractor, separate contractors and the Government as to the responsibility under their respective contracts for maintaining the premises and surrounding area free from waste materials and rubbish, the Government may clean up and allocate the cost among those responsible.
End of Section C
PAGE 8 OF 15 SB1341-13-RP-0001
Section H. Special Contract Requirements
H.1 Wage Determination as implemented by FAR 52.222-6 Davis-Bacon Act.
General Decision Number: MD130057 02/22/2013 MD57
Superseded General Decision Number: MD20120081
State: Maryland
Construction Type: Building
County: Montgomery County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 01/04/2013
1 01/25/2013
2 02/01/2013
3 02/22/2013
ASBE0024-007 10/01/2012
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 33.13 13.60
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-010 10/01/2012
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 20.86 5.61
BRMD0001-006 05/01/2011
TILE SETTER......................$ 25.29 9.89
BRMD0001-009 05/01/2011
TILE FINISHER....................$ 20.48 8.74
BRMD0001-011 05/01/2012
PAGE 9 OF 15 SB1341-13-RP-0001
BRICKLAYER (Excluding
Pointing, Caulking and
Cleaning)........................$ 27.89 7.76
BRMD0001-012 05/01/2011
MASON - STONE....................$ 32.88 13.99
CARP0132-017 10/01/2012
CARPENTER (Including
Acoustical Ceiling
Installation, Drywall
Hanging, Metal Stud
Installation and Form Work)......$ 26.61 7.98
CARP1831-002 04/01/2012
MILLWRIGHT.......................$ 27.96 12.20
ELEC0026-021 09/01/2012
ELECTRICIAN (Communication and Sound Equipment).............$ 25.55 3%+7.77
ELEC0026-022 11/05/2012
ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 40.00 14.30+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin
Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after
Thanksgiving Day and Christmas Day.
ELEV0010-001 01/01/2012
ELEVATOR MECHANIC................$ 39.70 23.535+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for
PAGE 10 OF 15 SB1341-13-RP-0001
6 months to 5 years of service as vacation pay credit.
ENGI0077-018 05/01/2012
OPERATOR: Bulldozer.............$ 30.70 8.23+a
OPERATOR: Loader
Front End Loaders 3 1/2 cubic yards and above.......$ 31.43 8.23+a
Front End Loaders Below 3
1/2 cubic yards.............$ 30.70 8.23+a a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
IRON0005-005 06/01/2012
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 29.55 14.995
IRON0201-006 05/01/2012
IRONWORKER, REINFORCING..........$ 26.50 16.68
* LABO0657-017 06/01/2012
LABORER: Mason Tender -
Cement/Concrete..................$ 21.26 6.83
LABORER: Pipelayer..............$ 21.26 6.83
PAIN0051-014 06/01/2012
GLAZIER
Glazing Contracts $2 million and under...........$ 24.17 9.36
Glazing Contracts over $2 million.....................$ 27.14 9.36
PAIN0051-019 06/01/2012
PAINTER
Brush, Roller, Spray and
Drywall Finisher/Taper......$ 24.14 8.91
Industrial..................$ 28.18 8.91
PAGE 11 OF 15 SB1341-13-RP-0001
PLAS0891-005 07/01/2011
PLASTERER........................$ 27.66 5.82
PLAS0891-006 05/01/2010
CEMENT MASON/CONCRETE FINISHER...$ 27.15 9.58
PLAS0891-008 08/01/2011
PLASTERER (Fireproofing
Including Sprayer, Mixer, and
Handler)
Handler.....................$ 15.00 3.89
Mixer/Pump..................$ 17.00 3.89
Sprayer.....................$ 21.50 3.89
PLUM0005-010 08/01/2012
PLUMBER..........................$ 38.17 15.75+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's
Day, Martin Luther King's Birthday, Memorial Day and the
Fourth of July.
PLUM0602-011 08/01/2012
PIPEFITTER (Including HVAC
Pipe and System Installation)....$ 37.62 18.07+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
ROOF0030-016 09/01/2012
ROOFER...........................$ 26.90 10.18
SFMD0669-001 01/01/2013
SPRINKLER FITTER (Fire
Sprinklers)......................$ 30.53 17.62
PAGE 12 OF 15 SB1341-13-RP-0001
SHEE0100-015 07/01/2012
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 38.39 14.54
SUMD2010-091 08/04/2010
LABORER
Common or General...........$ 14.15 2.30
Grade Checker...............$ 16.00 2.90
Landscape...................$ 9.23
Mason Tender - Brick........$ 13.00 0.00
Mason Tender - Stone........$ 14.03 0.00
Mason Tender for Pointing, Caulking and Cleaning.......$ 13.21
Mortar Mixer................$ 16.61 9.08
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.19 0.00
POWER EQUIPMENT OPERATOR:
Asphalt Roller..............$ 21.35 5.38
Backhoe.....................$ 19.82 5.02
Bobcat/Skid Loader..........$ 18.05 8.78
Boom........................$ 21.44 8.29
Crane.......................$ 20.95 6.18
Excavator...................$ 20.00 0.00
Forklift....................$ 16.00 5.12
Gradall.....................$ 20.50 8.42
Grader/Blade................$ 14.50 5.18
Paver.......................$ 17.47 6.36
Roller excluding Asphalt....$ 17.60 3.88
TERRAZZO WORKER/SETTER...........$ 19.94 6.54
TRUCK DRIVER
Dump Truck..................$ 15.90 1.12
Tractor Haul Truck..........$ 17.87 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after
PAGE 13 OF 15 SB1341-13-RP-0001
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
PAGE 14 OF 15 SB1341-13-RP-0001
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
PAGE 15 OF 15 SB1341-13-RP-0001
PAGE 16 OF 15 SB1341-13-RP-0001
Section J, Attachments J.1. Relocation Drawings 215-1 through 215-11
J.2 Specifications:
DIVISION 1 – GENERAL REQUIREMENTS
01010 SUMMARY OF WORK
01012 WORK BY OTHERS
01016 CONTINUED OCCUPANCY OF EXISTING FACILITIES
01044 CUTTING AND PATCHING
01094 DEFINITIONS
01100 SPECIAL PROJECT PROCEDURES
01110 CHANGE ORDER PROCEDURES
01152 PARTIAL AND FINAL PAYMENT PROCEDURES
01200 PROJECT MEETINGS
01310 SCHEDULING
01340 SUBMITTALS
01400 QUALITY CONTROL
01500 CONSTRUCTION FACILITIES, TEMPORARY CONTROLS, UTILITIES
AND SAFETY
01610 DELIVERY, HANDLING AND STORAGE: MATERIALS AND
EQUIPMENT
01640 SUBSTITUTIONS PRIOR TO OFFERING
01641 PRODUCT OPTIONS AND SUBSTITUTIONS AFTER EXECUTION OF CONTRACT
01700 CONTRACT CLOSEOUT
01710 CLEANING
01720 PROJECT RECORD DOCUMENTS
01740 WARRANTIES AND GUARANTEES
01900 METRIC STANDARDS
01980 GENERAL METRIC ABBREVIATIONS
DIVISION 5 – METALS
05505 UNIVERSAL CHANNEL SUPPORT SYSTEM (UCSS)
DIVISION 7 – THERMAL AND MOSITURE PROTECTION
07270 FIRE STOPPING
DIVISION 9 – FINISHES
09000 ROOM FINISH AND COLOR SCHEDULE
DIVISION 13 – SPECIAL CONSTRUCTION
13001 CLEAN ZONE GENERAL REQUIREMENTS
13002 CLEANROOM PROTOCOL
DIVISION 15 – MECHANICAL
15010 SPECIAL MECHANICAL REQUIREMENTS
15140 SUPPORTS, ANCHORS, GUIDES, AND SLEEVES
15190 MECHANICAL IDENTIFICATION SYSTEMS
15250 PIPE INSULATION
15411 LABORATORY PIPING
15480 PROCESS PIPING SYSTEMS
15485 ULTRAPURE (MICROELECTRONICS GRADE) WATER SYSTEM
15486 LABORATORY GAS AND VACUUM SYSTEMS
15489 HIGH PURITY NITROGEN PROCESS GAS PIPING SYSTEM
15510 HYDRONIC PIPING SYSTEMS
15723 TOXIC GAS MONITORING AND CONTROL SYSTEM (TGMS)
15880 AIR DISTRIBUTION SYSTEM
15991 TESTING AND BALANCING
DIVISION 16 – ELECTRICAL
PAGE 17 OF 15 SB1341-13-RP-0001
16010 ELECTRICAL GENERAL REQUIREMENTS
16013 WIRING EQUIPMENT FURNISHED BY OTHERS
16110 RACEWAYS
16120 WIRE AND CABLE - 600 VOLT AND BELOW
16130 BOXES AND FITTINGS
16140 WIRING DEVICES
16440 DISCONNECT SWITCHES
16450 GROUNDING
16475 OVERCURRENT PROTECTIVE DEVICES
16741 EMPTY CONDUIT AND OUTLET BOXES
16901 VIBRATION ISOLATION OF ELECTRICAL SYSTEMS
J.3 Outline of a NIST Safety and Health Plan for a Specific Contract
J.4. Guidelines For OFPM/Contractors And A/E Firms Performing Site Investigations And Fieldwork (Including Construction) At The National Institute Of Standards And Technology, Gaithersburg, Md.
End of Section J
File details come from the government source that posted it. Updated .