1. Delivery: the new compressor should be delivered to the NIST Gaithersburg campus, building 233 room A121

2. Removal: The failing Ingersoll Rand air compressor (Model: SSR-HXP20SE) should be properly and safely removed from the building.

3. Mounting: The new compressor should be set on and securely mounted to the existing steel frame.

4. Plumbing: installation should include plumbing the compressor to the existing steel air tank and any necessary drains.

5. Electrical: installation should include electrically connecting (wiring) the new compressor with the existing fused electrical distribution.

6. Startup: installation should include startup and commissioning of the compressor by the company installing the new compressor

7. Training: installation should include training at least one NIST operator on how to operate the new compressor.