Requirements.docx
DOCX document 14 KB Posted
- Attached to
- Air compressor
- Solicitation number
- SB1341-12-RQ-0784
About this file
Requirements
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Delivery: the new compressor should be delivered to the NIST Gaithersburg campus, building 233 room A121
2. Removal: The failing Ingersoll Rand air compressor (Model: SSR-HXP20SE) should be properly and safely removed from the building.
3. Mounting: The new compressor should be set on and securely mounted to the existing steel frame.
4. Plumbing: installation should include plumbing the compressor to the existing steel air tank and any necessary drains.
5. Electrical: installation should include electrically connecting (wiring) the new compressor with the existing fused electrical distribution.
6. Startup: installation should include startup and commissioning of the compressor by the company installing the new compressor
7. Training: installation should include training at least one NIST operator on how to operate the new compressor.