SB021_26 Inv PROJECT MANUAL_Gateway Trailhead.pdf

PDF 2 MB Posted

Attached to
SB021-26 LAWRENCEVILLE GATEWAY TRAIL TRAILHEAD
Solicitation number
PE-66751-NONST-2026-000000083
Issued by
Gwinnett County, Georgia

About this file

This is a project manual and bid solicitation document for the City of Lawrenceville, Georgia for the construction of the Lawrenceville Gateway Trail Trailhead (Project SB021-26). The project encompasses comprehensive site development work including erosion control, demolition, earthwork, masonry, concrete installation, electrical systems, landscaping, and storm drainage infrastructure. Major work items include site preparation with kudzu eradication, installation of granite rubble seating walls, brick paver plaza with concrete base, a custom monument sign with foam core signage, parking lot and trail asphalt paving, site lighting and electrical infrastructure, and landscape planting. Sealed bids were due on March 26, 2026 at 10:00 AM to the Lawrenceville Purchasing Office, with a pre-bid conference scheduled for March 16, 2026 at City Hall. Questions regarding the bid had a deadline of March 19, 2026. The project requires completion within 120 consecutive calendar days from the Notice to Proceed, with liquidated damages set at $500 per day for delays beyond the contract time.

Contractors must submit a five percent (5%) bid bond with their proposal, with the successful bidder required to provide one hundred percent (100%) performance and payment bonds from surety companies rated A-5 or higher by AM Best. Contractors must also maintain comprehensive insurance coverage including workers' compensation, general liability, auto liability, and umbrella coverage as specified. The contractor is responsible for all permits, licenses, utility coordination, and compliance with federal, state, and local regulations and GDOT standards. The work must comply with the latest editions of applicable codes including the International Building Code and GDOT specifications. No specific funding source or total project cost is identified in the specifications, though all costs are to be included in the contractor's lump sum and unit price bids. The contract includes a one-year warranty period following final acceptance, and contractors must demonstrate at least three comparable projects of $500,000 or greater within the past five years and possess appropriate state licensing for their work.

View the file

Other files

File Type Posted
SB0021_26 Add1 w Plans.pdf PDF
SB021_26 Add2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

SB021-26

LAWRENCEVILLE GATEWAY TRAIL TRAILHEAD

CITY OF LAWRENCEVILLE

LAWRENCEVILLE, GEORGIA

The drawings, specifications, and other bidding documents of the City of Lawrenceville for the LAWRENCEVILLE GATEWAY TRAIL TRAILHEAD are provided for your use in offering bids in response to the Owner’s invitation to bidders. Supplying these documents for bidding purposes does not convey any type of license for copying or transfer of ownership or intellectual property right, including copyright, to plan holders.

No electronic devices, including photocopy, may be used to copy any part of these documents without the written permission of the Architect / Engineer or other copyright holder.

OWNER

70 S. CLAYTON STREET

LAWRENCEVILLE, GEORGIA 30046

SPECIFICATIONS

DIVISION 0 BIDDING AND CONTRACT REQUIREMENTS

00100 Notice to Bid

00200 Instructions to Bidders

00300 Statement of Equipment

00410 Bidding Form

00430 Bid Bond

00440 Statement of Bidder’s Qualifications

00480 Non-Collusion Affidavit

00520 Sample Contract

00610 Performance Bond

00620 Payment Bond

00700 General Conditions

00800 Supplemental General Conditions

00805 Special Assurances

00900 Pay Request Form 1

00901 Pay Request Form 2

DIVISION 1 GENERAL REQUIREMENTS

01010 Summary of Work

01025 Measurement and Payment

01026 Schedule of Values

01027 Testing

01046 Construction Sequencing

01055 Construction Staking

01060 Regulation Requirements

01091 Codes and Standards

01200 Project Meetings

01320 Construction Photographs

01340 Shop Drawings

01540 Job Site Facilities and Security

01570 Traffic Control

01611 Storage and Protection

01710 Cleaning

01720 Project Record Documents

01740 Warranties and Bonds

DIVISION 2 SITEWORK

02000 Mobilization

02005 General

02010 Subsurface Conditions

02100 Site Preparation

02125 Erosion Control Measures

02 41 00 Demolition

02180 Striping

DIVISION 3 CONCRETE

03 30 00 Cast In Place Concrete

DIVISION 4 MASONRY

04 23 00 Reinforced Masonry

04 42 00 Natural Thin Stone Veneer

04 43 00 Stone Masonry

04 72 00 Cast Stone

DIVISION 5 STRUCTURAL STEEL FRAMING

05 12 00 Structural Steel Framing

05 14 00 Structural Aluminum Framing

DIVISION 7 THERMAL AND MOISTURE PROTECTION

07 92 00 Joint Sealants

DIVISION 10 SPECIALTIES

10 00 00 Specialty Coated Foam Core Signage

10 14 00 Signage

DIVISION 26 ELECTRICAL

260100 Basic Electrical Requirements

260519 Cable, Wire And Connectors, 600 Volt

260533 Raceways, Conduit And Boxes

262416 Panelboards

262726 Wiring Devices

265100 Lighting Fixtures

DIVISION 31 EARTHWORK

31 11 00 Clearing and Grubbing

31 22 00 Grading

31 25 00 Erosion, Sedimentation Pollution Control

DIVISION 32 EXTERIOR IMPROVEMENTS

32 12 00 Flexible Pavement

32 13 73 Concrete Paving Joint Sealant

32 14 16 Brick Unit Paving

32 16 00 Curb, Gutter and Sidewalks

32 33 00 Site Furnishings

32 94 00 Landscape Planting

DIVISION 33 UTILITIES

33 40 00 Storm Systems

END OF SECTION

NOTICE TO BID

00100-5

March 5, 2026

NOTICE TO BID

FOR

The City of Lawrenceville is soliciting competitive sealed bids from Contractors for the

LAWRENCEVILLE GATEWAY TRAIL TRAILHEAD. Sealed bids will be received by the

Lawrenceville Purchasing Office, 70 S. Clayton Street, Lawrenceville, Georgia 30046 until 10:00 A.M.

local time on Thursday, March 26, 2026 and then publicly opened and read aloud. Any bid received after

10:00 A.M will not be accepted. Bid envelope should be marked on the outside with Bid Number, name of

Bidder, date and time of opening.

The work to be performed by the General Contractor consist of but is not limited to the following major items:

• EROSION CONTROL BMP’s including construction exit, silt fence, concrete washout area, mulching,and inlet sediment trap.

• DEMOLITION including kudzu eradication in the immediate work area, relocation of a water meter, and removal of curb and gutter.

• SITE WORK, EARTH WORK including the excavation and fine grading of the site to level out to accommodate a driveway, parking lot, pedestrian plaza, and trail.

• STONE MASONRY including the installation granite rubble seating walls around the perimeter of the plaza, and thin granite veneer on the monument sign.

• BRICK MASONRY including the installation of brick pavers and mortar on the pedestrian plaza, and the installation of truncated dome brick pavers at ADA ramps.

• CAST IN PLACE CONCRETE includes the installation of a 24” curb and gutter, sidewalks, walkways and bike rack pads from parking lot to trail and plaza, 8” wide banding around plaza and planter areas, and concrete base under the brick and mortar plaza surface.

• JOINT SEALANT includind sealing the joints between existing seating, sign, and plaza.

• STORM DRAIN STRUCTURES includes installation of tranch drains with grates on trail and walkway, and 18” to 60” HDPE and structures. The 60” HDPE is a storm water management storage device with a baffled outlet structure.

• SIGNAGE including a stop sign, city wayfinding sign, ADA parking sign, and a custom monument sign.

• SIGNANGE, MONUMENT includes the installation of a custom trailhead monument sign that is constructed of reinforced CMU base clad in thin stone granite, hollow steel tube roof supports, large timber vertical and horizontal members, fastened with custom steel and aluminum hardware, a standing seam metal roof and Epicore ceiling, foam core sign “cabinets” with vector work showing City logos and trail maps, and roof-mounted flood light.

• STRIPING (THERMO) including thermoplastic striping of parking spaces, ADA hashing and symbol, stop bar, and pedestrian crosswalk.

• SITE LIGHTING AND BURIED ELECTRICAL including the installation of parking lot lighting, pedestrian lighting, inset seat lighting, monument sign floodlight lighting, and the installation of a utility rack, transformer, and electric meter. This also includes running all conduit and lines/wires and coordinating with Jackson EMC for electrical hook up to underground electrical system.

• ASPHALT including the installation of a driveway and parking lot and a 10’ wide pedetrian trail.

Notice of Bid

Date: March 2, 2026

Bid Number: SB021-26

NOTICE OF BID

00100-6

• SITE FURNISHING including the installation of decorative bollards, bike racks, and waste bins.

• STEEL ORNAMENTAL FENCE including the installation of a security fence and double gate maintenance entry, and the fabrication and installation of a custom rolled railing on a granite rubble seating wall.

• LANDSCAPING including the planting of trees, shrubs, groundcover, and sod. This includes the mulching of the trees and planter beds. The contractor will also be responsible for watering the landscape through the construction period. No irrigation system is proposed for this project.

The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the Drawings and as described in the respective section of these specifications. All work shall comply with all current Federal, State, and local requirements and specifications.

Copies of the Plans, Specifications and Contract Documents may be obtained from the Lawrenceville

City website https://www.lawrencevillega.org/purchasing .

A pre-bid conference is scheduled for 2:00 P.M. on March 16, 2026 at Lawrenceville City Hall located at 70 South Clayton Street, 4th floor City Council Chambers, Lawrenceville, GA. 30046. All bidders are urged to attend.

Questions regarding bids should be submitted to Kenneth Morris, Purchasing Director, via email at purchasing@lawrencevillega.org no later than 3:00 p.m. local time, March 19, 2026. Bids are legal and binding upon the bidder when submitted.

Bids in the case of Corporations not chartered in Georgia, must be accompanied by proper certification stating that said Corporation is authorized to do business in the State of Georgia.

No Bidder may withdraw his Bid within ninety (90) days after the actual date of the opening thereof.

Bidder agrees to complete the Contract awarded within the "allowable calendar days for completion" from

10 days from the date of the "Notice to Proceed".

A five percent (5%) bid bond must be submitted with the bid. Successful contractor will be required to provide a one hundred percent (100%) payment and one hundred percent (100%) performance bond as well as an insurance certificate fulfilling requirements as stated in the bid documents. Surety and insurance companies must have an AM Best rating of A-5 or greater, be listed in the Federal Registry of Companies holding Certificate of Authority and acceptable sureties on Federal Bonds, be licensed by the Georgia

Insurance Department and the Georgia Secretary of State to do business in the State of Georgia.

All bonds must be submitted on forms provided by the City of Lawrenceville and agencies providing bonds and insurance should provide proof that they meet the criteria outlined in the bid and contract documents.

The City of Lawrenceville does not discriminate on the basis of disability in the admission or access to its programs or activities. The written Bid Documents supersede any prior verbal or written communications between the parties.

Award will be made to the contractor submitting the lowest responsive and responsible bid. The City of

Lawrenceville reserves the right to reject any or all bids to waive technicalities and to make an award deemed in its best interest. Bids may be split or awarded in entirety.

All companies submitting a bid will be notified in writing of award.

We look forward to your bid and appreciate your interest in the City of Lawrenceville.

https://www.lawrencevillega.org/purchasing mailto:%20purchasing@lawrencevillega.org mailto:%20purchasing@lawrencevillega.org

Notice of Bid

Date: March 2, 2026

Bid Number: SB021-26

NOTICE OF BID

00100-7

END OF SECTION 00100

INSTRUCTIONS TO BIDDERS

00200-1

SECTION I

1. Each bidder must examine the Notice to Bid, Instructions to Bidders, Contract, Contract General

Conditions, Specifications, Bid Schedule, Drawings, and Addenda. Failure to do so will be at the bidder’s risk.

2. Each bidder shall furnish all information required by the bidding requirements. The authorized representative must sign the bid as well as print or type his/her name on the bid schedule.

Erasures or other changes must be initialed by the authorized representative signing the bid. Bids can only be signed by a person authorized to commit company resources.

3. Bids are legal and binding upon the bidder when submitted. Receipt of addenda should be acknowledged on the bid schedule. No oral interpretations or information can be considered as binding.

4. Bid envelope should be marked on the outside with Bid Number, name of Bidder, date and time of opening. Faxed bids cannot be considered.

5. Bidding Requirements will consist of the following:

a) Bid Schedule

b) Bid Bond

c) Non-Collusion Affidavit

d) Statement of Bidder’s Qualifications

e) Statement of Equipment

6. Award will be made to the bidder submitting the lowest responsive and responsible bid. The

City reserves the right to make such investigations as it deems necessary to determine the ability of the bidder to perform, and the bidder shall furnish to the City, all such information for this purpose as the City may request. The City reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the City that such bidder is properly qualified to carry out the obligations of the contract.

7. Bids may be withdrawn only the case of mathematical error. The bidder shall give notice in writing of his claim of right to withdraw his bid without penalty due to an error within two (2) business days after the conclusion of the bid opening procedure. Bids may be withdrawn from consideration if the price was substantially lower than the other bids due solely to a mistake therein, provided the bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor or material made directly in the compilation of the bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents and material used in the preparation of the bid sought to be withdrawn. The bidder’s original work papers shall be the sole acceptable evidence of error and mistake if he elects to withdraw his bid. If a bid is withdrawn under the authority of this provision, the lowest remaining responsive bid shall be deemed to be low bid.

00200-2

No bidder who is permitted to withdraw a bid shall, for compensation, supply any material or labor or perform any subcontract or other work agreement for the person or firm to whom the contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid was submitted.

Bidder has up to forty-eight (48) hours to notify the City of Lawrenceville Purchasing Office of an obvious clerical error made in calculation of bid in order to withdraw a bid after bid opening.

Withdrawal of bid for this reason must be done in writing within the forty-eight (48) hour period.

Suppliers who fail to request withdrawal of bid by the required forty-eight (48) hours shall automatically forfeit bid bond. Bid may not be withdrawn otherwise. Bid withdrawal is not automatically granted and will be allowed solely at the City of Lawrenceville’s discretion.

8. The City of Lawrenceville reserves the right to reject any or all bids, to waive technicalities, and to make an award as deemed in its best interest.

9. The City is exempt from federal excise tax and Georgia sales tax with regard to goods purchased directly by the City. Nevertheless, contractors are responsible for federal excise tax and Georgia sales taxes, including taxes for materials incorporated in City construction contracts.

10. The attention of all bidders is directed to the fact that all applicable federal state laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the contract the same as though therein written.

11. Information submitted by a bidder in the bidding process shall be subject to disclosure after bid award in accordance with the Georgia Open Records Act of Compulsory Process.

12. Failure to observe any of the Instructions to Bidders or conditions in the Invitation to Bid may constitute grounds for rejection of the bid. Failure to use City Bidding Form and to acknowledge applicable addenda may result in a bid being deemed non-responsive an automatic rejection.

13. The Work shall be completed within 120 consecutive calendar days. The completion of the work will be computed from the date of the Notice to Proceed or as stated in the pre-construction meeting.

14. Add or deduct amounts indicated on the outside of the envelope are allowed and will be applied to the lump sum amount. Amount shall be clearly stated and should be initialed by an authorized company representative.

15. "Liquidated Damages" shall mean the negotiated sum of which the Bidder agrees to pay for each consecutive working day beyond the Contract Time required to complete the work.

16. Construction areas min. safety requirements & important issues:

• The contractor shall post warning signs at all construction zones for pedestrians to be aware of their surroundings.

• The contractor shall prevent any damage to adjacent sidewalks, utilities, or private property during construction.

00200-3

• Construction entrance, silt fences and any other required erosion control device shall be in place prior to clearing, construction, or demolition operations.

• All structures to be demolished shall be completely removed above and below grade.

• Abandoned service lines to the existing structures shall also be removed.

17. Standard Specifications:

All work shall comply with all Federal, State, and local requirements and specifications.

Contractor shall follow the latest GDOT, City of Lawrenceville codes, and International

Building Codes.

18. Addenda and Interpretations:

No interpretation of the meaning of the Drawings, Specifications or other bid documents will be made to any bidder orally. Every request for such interpretation should be made in writing. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Specifications. Failure of a bidder to receive any addendum shall not relieve him of any obligation under his bid. All addenda shall become part of the Contract Documents.

19. Site Examination:

The Bidder is advised to examine all the locations of the work and to inform himself fully as to its conditions, the conformation of the ground, the character, quality and quantity of the products needed preliminary to and during the execution of the work; the general and local conditions and all other matters which can in any way affect the work to be done under the Contract. The Plans are based on field run survey provided by the City of Lawrenceville, accuracy of this information shall be verified by the Bidder.

Failure to examine the site will not relieve the successful bidder of his obligation to furnish all products and labor necessary to carry out the provisions of his contract.

The Bidder shall notify the Owner of the date and time he proposes to examine the location of the work. The Bidder shall confine his examination to the specific areas designated for the proposed construction, including easements and public rights-of-way. If, due to some unforeseen reason, the Owner's proceedings for obtaining the proposed construction site

(including easements), have not been completed, the Bidder may enter the site only with the express consent of the property owner. The Bidder is solely responsible for any damages caused by his examination of the site.

PART II – BONDS AND INSURANCE

A) A Certified or Cashier’s Check payable to the City of Lawrenceville or a Bid Bond in the amount of five percent (5%) of the total bid must be submitted with the bid. Successful bidder will be required to furnish a payment and performance bond each in the amount of one hundred percent (100%) of the bid amount.

B) Bonding Company must be listed in the Federal Registry of Companies Holding certificates of authority as acceptable sureties on Federal bonds and must be listed in the AM Best catalog with a listing of A-5 or higher. Bonding company must also be licensed to do business by the Georgia

Insurance Department.

00200-4

The successful bidder, shall obtain, maintain, and furnish to the City certificates or insurance for the entire duration of the contract period. Insurance requirements starting on the next page.

00200-5

STANDARD INSURANCE REQUIREMENTS

(For projects less than $1,000,000)

1. Statutory Workers' Compensation Insurance

(a) Employers Liability:

✓ Bodily Injury by Accident - $100,000 each accident

✓ Bodily Injury by Disease - $500,000 policy limit

✓ Bodily Injury by Disease - $100,000 each employee

2. Commercial General Liability Insurance

(a) $500,000 limit of liability per occurrence for bodily injury and property damage

(b) The following additional coverage must apply:

✓ 1986 (or later) ISO Commercial General Liability Form

✓ Dedicated Limits per Project Site or Location (CG 25 03 or CG 25 04)

✓ Additional Insured Endorsement (Form B CG 20 10 with a modification for completed operations or a separate endorsement covering Completed Operations)

✓ Blanket Contractual Liability

✓ Broad Form Property Damage

✓ Severability of Interest

✓ Underground, explosion, and collapse coverage

✓ Personal Injury (deleting both contractual and employee exclusions)

✓ Incidental Medical Malpractice

✓ Hostile Fire Pollution Wording

3. Auto Liability Insurance

(a) $500,000 limit of liability per occurrence for bodily injury and property damage

(b) Comprehensive form covering all owned, non-owned, leased, hired, and borrowed vehicles

(c) Additional Insured Endorsement

(d) Contractual Liability

4. Umbrella Liability Insurance - $1,000,000 limit of liability

(a) The following additional coverage must apply

✓ Additional Insured Endorsement

✓ Concurrency of Effective Dates with Primary

✓ Blanket Contractual Liability

✓ Drop Down Feature

✓ Care, Custody, and Control - Follow Form Primary

✓ Aggregates: Apply Where Applicable in Primary

✓ Umbrella Policy must be as broad as the primary policy

5. The City of Lawrenceville should be shown as an additional insured on General Liability, Auto

Liability and Umbrella Liability policies.

6. The cancellation should provide 10 days’ notice for nonpayment and 30 days’ notice of cancellation.

7. Certificate Holder should read:

City of Lawrenceville

70 S. Clayton St.

PO Box 2200

Lawrenceville, Georgia 30046

00200-6

8. Insurance Company, except Worker' Compensation carrier, must have an A.M. Best Rating of A-5 or higher. Certain Workers' Comp funds may be acceptable by the approval of the Insurance Unit. European markets including those based in London and domestic surplus lines markets that operate on a non-admitted basis are exempt from this requirement provided that the contractor’s broker/agent can provide financial data to establish that a market is equal to or exceeds the financial strengths associated with the

A.M. Best’s rating of A-5 or better.

9. Insurance Company should be licensed to do business by the Georgia Department of Insurance.

10. Certificates of Insurance, and any subsequent renewals, must reference specific bid/contract by project name and project/bid number.

11. The Contractor shall agree to provide complete certified copies of current insurance policy (ies) or a certified letter from the insurance company (ies) if requested by the City to verify the compliance with these insurance requirements.

12. All insurance coverages required to be provided by the Contractor will be primary over any insurance program carried by the City.

13. Contractor shall incorporate a copy of the insurance requirements as herein provided in each and every subcontract with each and every Subcontractor in any tier, and shall require each and every Subcontractor of any tier to comply with all such requirements. Contractor agrees that if for any reason Subcontractor fails to procure and maintain insurance as required, all such required Insurance shall be procured and maintained by Contractor at Contractor's expense.

14. No Contractor or Subcontractor shall commence any work of any kind under this Contract until all insurance requirements contained in this Contract have been complied with and until evidence of such compliance satisfactory to the City of Lawrenceville as to form and content has been filed with the City.

The Acord Certificate of Insurance or a preapproved substitute is the required form in all cases where reference is made to a Certificate of Insurance or an approved substitute.

15. The Contractor shall agree to waive all rights of subrogation against the City of Lawrenceville, the Mayor, City Council members, its officers, officials, employees, and volunteers from losses arising from work performed by the contractor for the City.

16. Special Form Contractors’ Equipment and Contents Insurance covering owned, used, and leased equipment, tools, supplies, and contents required to perform the services called for in the Contract. The coverage must be on a replacement cost basis. The City will be included as a Loss Payee in this coverage for City owned equipment, tools, supplies, and contents.

17. The Contractor shall make available to the City, through its records or records of their insurer, information regarding a specific claim related to any City project. Any loss run information available from the contractor or their insurer relating to a City project will be made available to the City upon their request.

18. Compliance by the Contractor and all subcontractors with the foregoing requirements as to carrying insurance shall not relieve the Contractor and all Subcontractors of their liability provisions of the

Contract.

19. The Contractor and all Subcontractors are to comply with the Occupational Safety and Health Act of

1970, Public Law 91-956, and any other laws that may apply to this Contract.

20. The Contractor shall at a minimum apply risk management practices accepted by the contractors’ industry.

00200-7

Surety Bonds

All of the surety requirements will stay the same except the Surety Company must have the same rating as item

8 above.

PART III – CONTRACT AWARD AND EXECUTION

A. Within ten (10) days from receipt of the Notice of Award from the City, the successful bidder is required to:

1. Return to the City’s Purchasing Office contract documents executed by the authorized representative and attested by the corporate secretary of the bidder.

2. Provide insurance certificates as specified in the bidding documents; and

3. Provide a performance bond and a payment bond as specified in the bidding documents.

The City may extend this ten-day period at its discretion.

B. The successful bidder’s failure to execute the contract, provide a performance bond and a payment bond and furnish satisfactory proof of coverage of the insurance required within a ten-day period or any extension thereof may be just cause for annulment of the award and forfeiture of the bid guaranty to the

City of Lawrenceville, not as a penalty but as liquidation of damages sustained. At the discretion of the

City the award then may be made to the next lowest, responsible bidder, or the work may be re-advertised.

C. Samples of the payment bond and performance bond are included in Sections 00610 and 00620, Bonds

D. The contract documents, including the payment bond, performance bond, and insurance certificate, shall be executed and furnished to the City in duplicate.

END OF SECTION 00200

STATEMENT OF EQUIPMENT

00300-1

STATEMENT OF EQUIPMENT

Show machinery and other equipment available to Contractor for prosecuting the Work included in Contract.

(To be filled in by Contractor and submitted with Bid.)

Available Machinery and

Other Equipment

Kind - Size - Capacity

Location

Ownership

Date Proposed To

Be Placed On Job

Site

The above is a true statement of the equipment available to the undersigned Bidder for prosecuting the Work included in the Contract. Where it is shown that the equipment is not owned by the Bidder, arrangements have been made with the owners to furnish the equipment.

Signed: _________________________________________

Name: _________________________________________

Title: _________________________________________

BIDDING FORM

00410-1

Failure to return this page as part of bid document may result in rejection of bid.

Bidder submits the following lump-sum/unit prices for the LAWRENCEVILLE GATEWAY

TRAIL TRAILHEAD identified in Bid Form as part of this Bid. Failure to utilize and return this form as a part of the bidding documents may result in rejection of bid.

ITEM

NO.

ITEM DESCRIPTION QTY UNIT

UNIT

PRICE

TOTAL

PRICE

1 Warranties and Bonds 1 LS

2 Mobilization & Staging 1 LS

Erosion Control - All Complete per plans and specs.

1 LS

Demolition - All Complete per plans and specs.

See sheet C1.0

1 LS

Earthwork & Fine Grading - All Complete

(includes site clearing & removal of kudzu in immediate work area)

1 LS

6 Relocate existing water meter 1 EA

7 10” Precast Trench & Grates 20 LF

8" HPDE Storm Pipe, including pipe bedding and fill up to grade

87 LF

18" HPDE Storm Pipe, including pipe bedding and fill up to grade

132 LF

18” RCP Strom Pipe, including pipe bedding and fill up to grade

58 LF

60" HPDE Storm Storage Pipe, including pipe bedding and fill up to grade

120 LF

Drop Inlet Manhole Structure, Precast Conc. (3' deep, 4' dia.)

1 EA

Double Wing Catch Basin Structure, Precast

Conc. (6’ deep, 4' dia.)

1 EA

Junction Box Structure, Precast Conc. (12' deep, 7' dia.)

1 EA

Junction Box Structure, Precast Conc. (6.5' deep, 7' dia.) - WQ Outlet Structure

1 EA

16 Headwall, Precast Conc. (18" dia.) 1 EA

17 Rip Rap Type 3 & Filter Blanket 73 SF

18 24" Curb & Gutter, Conc. 1,023 LF

19 8" Edge Banding, Conc. (12" deep) 402 LF

Asphalt, 9.5 Superpave TP 2 GP 2. Including tack

Coat

130 TN

Asphalt, 19 Superpave GP 1 or 2 (binder).

Including tack Coat

125 TN

00410-2

ITEM

NO.

ITEM DESCRIPTION QTY UNIT

UNIT

PRICE

TOTAL

PRICE

22 GAB (6" deep under asphalt parking and trail) 327 TON

23 GAB (4" deep under concrete paving) 24 TON

Concrete for walkways, under plaza, bike rack, waste receptacle

22 CY

25 Truncated Dome (color red) 104 SF

Modular Brick Pavers 3/8” tooled mortar joints, ½” Mortar setting bed, 4” reinforced concrete w

6”x6” – W1.4 x W1.4WWM, and 4” GAB, 95%

STD Proctor. See detail on Sheet C5.2

1,865 SF

27 Thermoplastic Striping, White 24" 80 LF

28 Thermoplastic Striping, White 8" 96 LF

29 Thermoplastic Striping, White 4" 105 LF

Thermoplastic Striping, HC Striping and HC vertical signage. See detail on Sheet C5.3

1 EA

Granite Rubble Seat Wall, including but not limited to footing, GAB, rebar, granite cap, granite rubble, etc. See detail on Sheet C5.3

100 LF

32 Removable Bollards. See detail on Sheet C5.3 14 EA

33 Stop Sign & Post 1 EA

City Parking Sign Post including foundation. See detail on Sheet C5.1

1 EA

35 Bike Rack. See detail on Sheet C5.3 10 EA

36 Waste Bins, Double. See detail on Sheet C5.3 3 EA

Electrical Meter, Transformer, Panel. All completed per plans.

1 LS

Electrical Line/Wires/Conductors & Conduit. All completed per plans.

1 LS

Lighting & Pole (Cooper Lighting), Parking Lot.

Including foundation, junction box, wiring and conduits. 20 ft round tapered steel pole with a light fixture. All completed per plans.

7 EA

Lighting & Pole (Sternberg Lighting), Pedestrian

Plaza. Including foundation, junction box, wiring and conduits. 12 ft round aluminum pole with a light fixture. All completed per plans.

3 EA

Lighting Fixture (Recessed Mansory seat wall light), Seating Wall. Including wiring and conduits. All completed per plans.

10 EA

Lighting Fixture (adjustable flood led light), Monument Sign. Including wiring and conduits.

All completed per plans.

4 EA

Monument Sign, Complete (See sheets C6.0, C6.1, C6.2 for details)

1 LS

00410-3

ITEM

NO.

ITEM DESCRIPTION QTY UNIT

UNIT

PRICE

TOTAL

PRICE

44 Nuttall Oak (3” cal) 11 EA

45 Green Vase Zelkova (3” cal) 11 EA

46 Dwarf Yaupon (3 Gal) 40 EA

47 Variegated Liriope (1 Gal) 175 EA

48 Tiftuf Bermuda Sod 27,000 SF

49 Hardwood Mulch 8 CY

TOTAL $

00410-4

Amounts are to be shown in numbers only. It is understood; that the estimated quantities in the Bid Proposal are approximate and are used only for comparison of bids, and are subject to increase or decrease as required to properly complete the Contract work. Low bidder shall be determined on the basis of the TOTAL BID

PRICE. Furthermore, the Contractor shall be responsible for including all items required to perform the project as indicated on the plans and specifications and including all costs into the most appropriate unit prices, if not explicitly described in the Payment paragraph of each section.

NOTES

*Individuals, firms and businesses seeking an award of a City of Lawrenceville contract may not initiate or continue any verbal or written communications regarding a solicitation with any City officer, elected official, employee or other City representative without permission of the Purchasing Manager named in the solicitation between the date of the issuance of the solicitation and the date of the final contract award by the City Council. Violations will be reviewed by the Purchasing Manager. If determined that such communication has compromised the competitive process, the offer submitted by the individual, firm or business may be disqualified from consideration for award.

00410-5

Failure to return this page as part of bid document may result in rejection of bid.

BIDDING FORM CONTINUED

(This Bid Form is part of the Bid Documents)

BID NUMBER: SB021-26 BID DATE: 3/26/2026

SUBMITTAL DATE:

BY:

(Bidder)

PROJECT DESCRIPTION: Lawrenceville Gateway Trail Trailhead

THIS BID IS SUBMITTED TO: City of Lawrenceville, Georgia (hereinafter called Owner)

This bid is submitted to the City of Lawrenceville in accordance with the instructions, requirements, and forms included in the bidding documents, and the bidder agrees to complete all work for the bid price and substantially complete the work within 120 calendar days from the written notice to proceed.

The bidder agrees if the bid is accepted by the City of Lawrenceville within ninety (90) days of the date of bid opening, the bidder shall within ten (10) days after receipt of notification of this acceptance execute a contract upon the terms, conditions, and prices set forth herein and in the form and manner required by the City of Lawrenceville. The bidder further accepts the terms and conditions contained in the bidding requirements for disposition of bid security.

In submitting this bid, bidder makes representations required by Instructions to Bidders and further warrants and represents:

a. Bidder has examined Bid Document Package, including Advertisement for Bids and

Instructions to Bidders, and following addenda:

No. Dated No. Dated

b. Bidder has examined site and locality where the work is to be performed and legal requirements (federal, state, and local laws, ordinances, rules, and regulations) and conditions affecting work cost, difficulty, progress, or performance and has made independent investigations as bidder deems necessary.

c. Bidder has carefully studied reports and drawings indicating subsurface conditions and drawings depicting physical conditions as identified in General Conditions and accepts

BIDDING FORM

00410-6 determination concerning technical data contained in reports and drawings on which bidder is entitled to rely.

d. Bidder has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) examinations, investigations, explorations, tests, and studies (in addition to or to supplement those referred to in "c." above) pertaining to subsurface or physical conditions at site or otherwise affecting cost, progress, performance, or furnishing work as bidder considers necessary for performing or furnishing work at contract price, within contract time, and in accordance with terms and conditions contained in bid document package, including specifically provisions stated in General Conditions and no additional examinations, investigations, explorations, tests, reports, or similar information or data are or will be required by bidder.

e. Bidder has reviewed and checked plans and data shown or indicated on bid document package with respect to existing underground facilities at or contiguous to site and assumes responsibility for accurately locating underground facilities. No additional examinations, investigations, explorations, tests, reports, or similar information or data concerning underground facilities are or will be required by bidder in order to perform and furnish work at contract price, within contract time, and in accordance with terms and conditions contained in bid document package, including specifically provisions stated in General

Conditions.

f. Bidder has correlated results from observations, examinations, investigations, explorations, tests, reports, and studies with terms and conditions contained in bid document package.

g. Bidder has given Owner written notice concerning conflicts, errors, or discrepancies discovered in bid document package and written resolution by Owner is acceptable to bidder.

h. This bid is genuine and not made in interest of or for any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules produced by any group, association, organization, or corporation; bidder has not directly or indirectly induced or solicited any other bidder to submit false or sham bid; bidder has not solicited or induced any person, firm, or corporation to refrain from bidding; and bidder has not sought by collusion to obtain for itself any advantage over any other bidder or over Owner.

i. The City requires that all who enter into a contract for the physical performance of services with the City must satisfy O.C.G.A. 13-10-91 and Rule 300-10-1-.02, in all manner, and such are conditions of the contract.

j. By submitting a bid to the City, contractor agrees that they are in compliance with O.C.G.A.

13-10-91 and Rule 300-10-1-.02. Such attestation(s) shall be maintained and may be inspected by the City at any time. Any such attestation shall become a part of the contractor/subcontractor agreement.

k. An affidavit of such compliance with O.C.G.A. 13-10-91 and Rule 300-10-1-.02 will be initiated by the City, signed by the contractor, and will become part of the contract.

BIDDING FORM

00410-7

l. It is the policy of the City of Lawrenceville that unauthorized aliens shall not be employed to perform work on City contracts involving the physical performance of services.

Therefore, the City shall not enter into a contract for the physical performance of services within the State of Georgia unless the contractor shall provide evidence on City-provided forms that it and its subcontractors have registered for and are participating in the federal work authorization program as defined by O.C.G.A. 13-10-90(2) to verify information of all new employees.

m. The Purchasing Manager shall be authorized to conduct random audits of a contractor’s or subcontractors’ compliance with O.C.G.A. 13-10-91 and the rules and regulations of the

Georgia Department of Labor. The contractor and subcontractors shall retain all documents and records of its compliance for a period of three (3) years following completion of the contract. Whenever it appears that a contractor’s or subcontractor’s records are not sufficient to verify the work eligibility of any individual in the employ of such contractor or subcontractor, the Purchasing Manager shall report same to the Department of Homeland

Security.

A contractor’s failure to participate in the federal work authorization program as defined by

O.C.G.A. 13-10-90(2) may be sanctioned by termination of the contract. If it is determined that a subcontractor is not participating in the federal work authorization program as defined by O.C.G.A. 13-10-90(2), the City of Lawrenceville may direct the contractor to terminate that subcontractor. A contractor’s failure to follow the City’s instruction to terminate a subcontractor that is not participating in the federal work authorization program as defined by O.C.G.A. 13-10-90(2) may be sanctioned by termination of the contract.

n. The above requirements shall be in addition to the requirements of state and federal law, and shall be construed to be in conformity with those laws.

In compliance with the attached specifications, the undersigned offers and agrees, if this bid is accepted by the City Council within ninety (90) days of the date of bid opening, to furnish any or all of the items upon which prices are quoted within the time specified in the bid schedule.

Legal Business Name

Federal Tax ID

Address

Representative Signature

Print Authorized Representative's Name

Telephone Number Fax Number

E-Mail Address

BIDDING FORM

00410-8

BIDDER'S ACKNOWLEDGEMENT

The undersigned bidder acknowledges all requirements outlined in the above "Instructions to

Bidders Package" and all documents referred to therein. This signed form must accompany the completed bid form submitted at the time of bid.

SIGNATURE: DATE:

(President, Vice President or Corporate Officer)

PRINTED NAME: TITLE:

ATTESTED BY: DATE:

(Secretary of Corporation)

PRINTED NAME: TITLE:

SEAL

(Corporate Seal Required if Bidder is a Corporation)

COMPANY NAME:

ADDRESS:

CITY: STATE: ZIP:

TELEPHONE NO.:

BID BOND

00430-1

KNOW ALL MEN BY THESE PRESENTS: that

(Name of Contractor)

(Address of Contractor) a

(Corporation, Partnership or Individual) hereinafter called Principal, and

(Name of Surety)

(Address of Surety) a Corporation of the State of , and a surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held and firmly bound unto

City of Lawrenceville (Name of Obligee)

70 S. Clayton Street, Lawrenceville, Georgia 30046 (Address of Obligee)

Thereinafter referred to as Obligee: in the penal sum of Dollars ($ ) in lawful money of the United States, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

WHEREAS, the Principal is about to submit, or has submitted, to Lawrenceville, Georgia, a proposal for furnishing materials, labor, and equipment for:

WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder's check otherwise required to accompany this Proposal.

NOW, THEREFORE, the conditions of this obligation are such that if the proposal be accepted, the Principal shall within ten days after receipt of notification of the acceptance, execute a Contract in accordance with the Proposal and upon the terms, conditions, and prices set forth in the form and manner required by Lawrenceville, Georgia, and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to Lawrenceville, Georgia, each in the amount of 100% of the total Contract Price, in form and with security satisfactory to said Lawrenceville, Georgia, and otherwise, to be and remain in full force and virtue in law, and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of Lawrenceville, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.

00430-2

PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. 6-91-1 et seq., and is intended to be and shall be constructed as a bond in compliance with the requirements thereof.

Signed, sealed and dated this day of , A.D., 20 .

ATTEST:

(Principal)

(Principal Secretary)

By:

(SEAL)

(Address)

(Witness as to Principal)

(Surety)

ATTEST: By:

(Attorney-in-Fact)

Resident or Nonresident Agent

(Witness as to Surety)

NOTE: If Contractor is Partnership, all partners should execute Bond. Surety Companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the Project is located.

BIDDER QUALIFICATIONS

00440-1

STATEMENT OF BIDDER'S QUALIFICATIONS

All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information desired. Attach all additional sheets to this statement.

1. Name of Bidder:

2. Permanent main office address:

3. When organized:

4. If a Corporation, where incorporated:

5. How many years have you been engaged in the contracting business under your present firm or trade name?

6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion. Attach copy of the contracts on hand).

7. General description of work performed by your company. Attach copy.

8. Have you ever failed to complete any work awarded to you?_________________________ If so, where and why_________________________________________________________________.

9. Have you ever defaulted on a contract?______________________________ If so, where and why?_________________________________________________________________________.

10. List the most important projects recently completed by your company, stating the approximate cost for each, and the month and year completed. Attach copy.

11. Experience in construction work similar in importance to this project. Attach copy.

12. Background and experience of the principal members of your organization, including officers:

Attach copy.

13. List any litigation the firm or any parent firm has been in or is currently involved in and state the status and/or outcome: __________________________________________________________

00440-2

MINIMUM REQUIREMENTS

The bidder must:

• Maintain a permanent place of business.

• Have the appropriate technical experience and working knowledge, to perform the work.

• Have the right equipment and personnel to perform the work.

• Have suitable financial means to meet obligations incidental to the work.

• Show proof of no less than THREE Contracts of similar character to the work being bid for a public agency, each with an original contract price of no less than $500,000.00 within the past five years.

• Have visited and examined the location of the work.

• Have Underground Utility Contractor’s license and/or Utility Manager license, and/or

General Contractor license. (A copy must be attached to the “Statement Of Builders

Qualifications” sheet)

• Enter into a binding contract with the City to perform the work.

• Sign the City’s affidavit verifying compliance with O.C.G.A. 13-10-91 and Georgia

Dept. of Labor Rule 300-10-1.02

00440-3

The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the local public agency in verification of the recitals comprising this

Statement of Bidder's Qualifications.

Dated this _______________ day of ____________________, 20___.

(Name of Bidder)

By:_____________________________________

Title:_____________________________________

State of ___________________

County of ___________________

___________________________________________ being duly sworn deposes and says that he or she is ___________________________ of ______________________ and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this __________________ day of ___________________________, 20___.

(Notary Public)

My Commission Expires:

_______________________________ (SEAL)

(Date)

NON-COLLUSION AFFIDAVIT

00480-1

CITY OF LAWRENCEVILLE, GEORGIA

FORM OF NON-COLLUSION AFFIDAVIT

(This Non-Collusion Affidavit is Part of the Bid Documents)

BID NUMBER: SB021-26 BID DATE: 3/26/2026

Project Name: Lawrenceville Gateway Trail Trailhead

STATE OF )

SS.

COUNTY OF )

being first duly sworn, deposes and says that he is

(Sole owner, partner, president, secretary, etc.)

The party making the foregoing Proposal or Bid; that such Bid is genuine and not collusive or sham;

that said Bidder has not colluded, conspired, connived, or agreed, directly or indirectly, with any Bidder or person, to put in a sham Bid, or that such other person shall refrain from bidding, and has not in any manner, directly or indirectly sought by agreement or collusion, or communication or conference, with any person, to fix the Bid Price of affiant or any other Bidder, or to fix any overhead, profit or cost element of said Bid Price, or of that of any other Bidder, or to secure any advantage against the City of

Lawrenceville, or any person interested in the proposed Contract; and that all statements in said Proposal or Bid are true; and further, that such Bidder has not, directly or indirectly submitted this Bid, or the contents thereof, or divulged information or data relative thereto to any association or to any member or agent thereof.

(Affiant)

Subscribed and Sworn to before me this Day of 20

(Notary Public in and for)

(County)

My Commission expires , 20

SAMPLE CONTRACT FORM

00520-1

CONTRACT

This CONTRACT made and entered into this day of , 20 by and between the City of Lawrenceville, Georgia, a Georgia Municipal Corporation, duly organized and existing under the laws of the State of Georgia (Party of the First Part, hereinafter called the

City), and , (Party of the Second Part, hereinafter called the Contractor).

WITNESSETH: That the Contractor has agreed, and by these presents does agree, with the City for the consideration herein mentioned to furnish all equipment, tools, material, skill, knowledge and labor of every description necessary to carry out and complete in a good, firm, substantial and workmanlike manner the work required under the Contract Documents and under the provisions of the Performance Bond and Payment Bond. The term Contract Documents shall include: the

Drawings and Specifications of the project, the Proposal made by the Contractor, the

Advertisement, the Instructions to Bidder, the Bid Form, the General Conditions and this

Contract. The work shall be performed in strict conformity with the Contract Documents and said

Contract Documents shall all form essential parts of the Contract. The work covered by this

Contract includes all work shown on the plans and specifications and listed in the conditions and specifications to wit:

The Contractor awarded work under this contract shall commence work within ten (10) days after the issuance of the Notice to Proceed and shall fully complete all work hereunder within 120 consecutive calendar days from and after said date.

CITY and CONTRACTOR recognize that time is the essence of this Agreement. If the WORK is not substantially complete within the time specified (plus any extension of time allowed in the

General Conditions), the CITY will suffer damage and loss that is difficult to calculate. The CITY and CONTRACTOR recognize and agree that the damage and loss that CITY will suffer if the

WORK is not completed in a timely manner in accordance with the contract terms is difficult or impossible to accurately calculate. Therefore, CITY and CONTRACTOR agree that a reasonable amount to fully compensate CITY for damage and loss it would incur as a result of the failure of

CONTRACTOR to complete the WORK in the time allowed by this Agreement shall be the sum of $500.00 per day. The amount in this provision is an amount CITY and CONTRACTOR agree upon as a reasonable amount of damages to fully compensate the CITY for any damage or loss it would suffer from a delay in the timely completion of the WORK, and is intended to provide CITY with reasonable liquidated damages and is not intended as a penalty.

The City shall pay and the Contractor shall receive the unit prices stipulated in the proposal hereto attached as full compensation for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .