SB007_27Inv.pdf
PDF 13 MB Posted
- Attached to
- SB007-27 Downtown Lawrenceville Streetscape
- Solicitation number
- PE-66751-NONST-2027-000000103
- Issued by
- Gwinnett County, Georgia
About this file
This is a Notice to Bid and Instructions to Bidders document issued by the City of Lawrenceville, Georgia for the Downtown Lawrenceville Streetscape project (Bid Number SB007-27). The City is soliciting competitive sealed bids from contractors to perform comprehensive streetscape improvements including night work construction (9:00 PM to 5:00 AM), electrical pedestrian and decorative lighting installation, demolition and removal of existing pavement and infrastructure, concrete curb and gutter installation, sidewalk and driveway apron construction, brick masonry work, landscaping, utility structure adjustments, and thermoplastic pavement striping. The project includes 32 line items with quantities ranging from 1 lump sum to 1,400 square feet, including 16 lighting fixtures, 610 linear feet of bored underground conduit, and 250 linear feet of concrete valley gutter. Sealed bids must be received by 2:00 PM on Thursday, September 3, 2026, at the Lawrenceville Finance Office. A pre-bid conference is scheduled for 10:00 AM on Tuesday, August 18, 2026, at Lawrenceville City Hall. Questions regarding bids must be submitted to Kenneth Morris, Purchasing Director, by 3:00 PM on Friday, August 21, 2026. The work shall be completed within 30 consecutive calendar days from the Notice to Proceed, which will be issued within 10 days of contract award.
Bidders must submit a five percent (5%) bid bond with their proposal, with the successful contractor required to provide one hundred percent (100%) payment and performance bonds. Award will be made to the lowest responsive and responsible bidder. The contractor must demonstrate three prior contracts of similar character for public agencies, each with an original contract price of no less than $500,000 within the past five years, and must possess appropriate licensing (Underground Utility Contractor's license, Utility Manager license, or General Contractor license). Insurance requirements include Workers' Compensation, Commercial General Liability with $500,000 per occurrence limits, Auto Liability with $500,000 per occurrence limits, and Umbrella Liability with $1,000,000 limits. All insurance companies must maintain an AM Best rating of A-5 or higher. The contractor must comply with O.C.G.A. 13-10-91 regarding employee work authorization verification through E-Verify and must provide proof of no less than three comparable projects completed in Georgia within the past five years. Liquidated damages are assessed at $1,000 per day for failure to complete work within the contract time. No addenda were included with the original bid documents as of the publication date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO BID
00100-5
August 1, 2026
NOTICE TO BID
FOR
Downtown Lawrenceville Streetscape
SB007-27
Notice of Bid
Date: August 1, 2026 Bid Number: SB007-27
NOTICE OF BID
00100-2
The City of Lawrenceville is soliciting competitive sealed bids from Contractors for the Downtown Lawrenceville Streetscape. Sealed bids will be received by the Lawrenceville Finance Office,70 S. Clayton Street, Main Level, Room M46A, Lawrenceville, Georgia 30046 until 2:00 PM local time on Thursday, September 3rd, 2026 and then publicly opened and read aloud. Any bid received after 2:00 P.M. will not be accepted. Bid envelope should be marked on the outside with Bid Number, name of Bidder, date and time of opening.
The work to be performed by the General Contractor consist of but is not limited to the following major items:
• Night Work: Contractor shall perform all construction activities between the hours of 9:00 PM and 5:00 AM. Include all costs associated with night work, traffic control, lighting, labor, and equipment.
• Electrical pedestrian lighting, including concrete lighting pole foundations (per manufacturer's specifications), decorative street/parking lighting, wiring, conduits, pull boxes, electrical service components, and all associated electrical infrastructure in accordance with the plans.
• Demolition and removal of existing pavement, curb and gutter, sidewalks, driveway apron, landscape features, striping (gridding), signage, utilities, and other improvements as required by the plans.
• Mobilization: project management, traffic control, erosion and sedimentation control, and all associated temporary construction measures.
• (18-24 Inch)varies Curb & Gutter: Removal and replacement or installation of concrete curb and gutter, including standard and mountable curb sections (steel), as required by the plans.
• 4-Inch-thick Sidewalk: Removal and replacement or installation of concrete curb and gutter, including standard and mountable curb sections, as required by the plans. Contractor to follow Gwinnett County/GDOT Standards.
• 8-Inch thick reinforced Concrete Driveway Apron: Removal and replacement or installation of concrete curb and gutter, including standard and mountable curb sections, as required by the plans.
Contractor to follow Gwinnett County/GDOT Standards.
• Brick Masonry: includes the installation of 2.5” thick brick pavers and mortar on the pedestrian plaza, and the installation of truncated dome brick pavers at ADA ramps.
• Landscaping, including topsoil placement, sod installation, and all associated materials in accordance with the plans and specifications.
• Adjustment of existing utility structures, valves, manholes, and drainage structures to final grade.
• Thermoplastic Stripping: Installation of thermoplastic pavement markings and striping, parking spaces, and all associated traffic control markings, complete in accordance with the plans, specifications, and MUTCD requirements.
• Contractor is responsible for all required permits.
• All materials must be on hand before construction is to begin.
The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the Drawings and as described in the respective section of these specifications. All work shall comply with all current Federal, State, and local requirements and specifications.
Copies of the Plans, Specifications and Contract Documents may be obtained from the Lawrenceville City website https://www.lawrencevillega.org/purchasing .
A pre-bid conference is scheduled for 10:00 A.M. on Tuesday, August 18th at Lawrenceville City Hall located at 70 South Clayton Street, 4rd floor City Council Chambers, Lawrenceville, GA. 30046. All bidders are urged to attend.
https://www.lawrencevillega.org/purchasing
Notice of Bid
Date: August 1, 2026 Bid Number: SB007-27
NOTICE OF BID
00100-3
Questions regarding bids should be submitted to Kenneth Morris, Purchasing Director, via email at Kenneth.Morris@Lawrencevillega.org no later than 3:00 p.m. local time, Friday, 8/21/26. Bids are legal and binding upon the bidder when submitted.
Bids in the case of Corporations not chartered in Georgia, must be accompanied by proper certification stating that said Corporation is authorized to do business in the State of Georgia.
No Bidder may withdraw his Bid within ninety (90) days after the actual date of the opening thereof.
Bidder agrees to complete the Contract awarded within the "allowable calendar days for completion" from 10 days from the date of the "Notice to Proceed".
A five percent (5%) bid bond must be submitted with the bid. Successful contractor will be required to provide a one hundred percent (100%) payment and one hundred percent (100%) performance bond as well as an insurance certificate fulfilling requirements as stated in the bid documents. Surety and insurance companies must have an AM Best rating of A-5 or greater, be listed in the Federal Registry of Companies holding Certificate of Authority and acceptable sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia.
All bonds must be submitted on forms provided by the City of Lawrenceville and agencies providing bonds and insurance should provide proof that they meet the criteria outlined in the bid and contract documents.
The City of Lawrenceville does not discriminate on the basis of disability in the admission or access to its programs or activities. The written Bid Documents supersede any prior verbal or written communications between the parties.
Award will be made to the contractor submitting the lowest responsive and responsible bid. The City of Lawrenceville reserves the right to reject any or all bids to waive technicalities and to make an award deemed in its best interest. Bids may be split or awarded in entirety.
All companies submitting a bid will be notified in writing of award.
We look forward to your bid and appreciate your interest in the City of Lawrenceville.
END OF SECTION 00100
mailto:Kenneth.Morris@Lawrencevillega.org labor or perform any subcontract or other work agreement for the person or firm to whom the
INSTRUCTIONS TO BIDDERS
00200-1
SECTION I
1. Each bidder must examine the Notice to Bid, Instructions to Bidders, Contract, Contract General Conditions, Specifications, Bid Schedule, Drawings, and Addenda. Failure to do so will be at the bidder’s risk.
2. Each bidder shall furnish all information required by the bidding requirements. The authorized representative must sign the bid as well as print or type his/her name on the bid schedule.
Erasures or other changes must be initialed by the authorized representative signing the bid. Bids can only be signed by a person authorized to commit company resources.
3. Bids are legal and binding upon the bidder when submitted. Receipt of addenda should be acknowledged on the bid schedule. No oral interpretations or information can be considered as binding.
4. Bid envelope should be marked on the outside with Bid Number, name of Bidder, date and time of opening. Faxed bids cannot be considered.
5. Bidding Requirements will consist of the following:
a) Bid Schedule
b) Bid Bond
c) Non-Collusion Affidavit
d) Statement of Bidder’s Qualifications
e) Statement of Equipment
6. Award will be made to the bidder submitting the lowest responsive and responsible bid. The
City reserves the right to make such investigations as it deems necessary to determine the ability of the bidder to perform, and the bidder shall furnish to the City, all such information for this purpose as the City may request. The City reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the City that such bidder is properly qualified to carry out the obligations of the contract.
7. Bids may be withdrawn only the case of mathematical error. The bidder shall give notice in writing of his claim of right to withdraw his bid without penalty due to an error within two (2) business days after the conclusion of the bid opening procedure. Bids may be withdrawn from consideration if the price was substantially lower than the other bids due solely to a mistake therein, provided the bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor or material made directly in the compilation of the bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents and material used in the preparation of the bid sought to be withdrawn. The bidder’s original work papers shall be the sole acceptable evidence of error and mistake if he elects to withdraw his bid. If a bid is withdrawn under the authority of this provision, the lowest remaining responsive bid shall be deemed to be low bid.
No bidder who is permitted to withdraw a bid shall, for compensation, supply any material or
00200-2 contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid was submitted.
Bidder has up to forty-eight (48) hours to notify the City of Lawrenceville Purchasing Office of an obvious clerical error made in calculation of bid in order to withdraw a bid after bid opening.
Withdrawal of bid for this reason must be done in writing within the forty-eight (48) hour period.
Suppliers who fail to request withdrawal of bid by the required forty-eight (48) hours shall automatically forfeit bid bond. Bid may not be withdrawn otherwise. Bid withdrawal is not automatically granted and will be allowed solely at the City of Lawrenceville’s discretion.
8. The City of Lawrenceville reserves the right to reject any or all bids, to waive technicalities, and to make an award as deemed in its best interest.
9. The City is exempt from federal excise tax and Georgia sales tax with regard to goods purchased directly by the City. Nevertheless, contractors are responsible for federal excise tax and Georgia sales taxes, including taxes for materials incorporated in City construction contracts.
10. The attention of all bidders is directed to the fact that all applicable federal state laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the contract the same as though therein written.
11. Information submitted by a bidder in the bidding process shall be subject to disclosure after bid award in accordance with the Georgia Open Records Act of Compulsory Process.
12. Failure to observe any of the Instructions to Bidders or conditions in the Invitation to Bid may constitute grounds for rejection of the bid. Failure to use City Bidding Form and to acknowledge applicable addenda may result in a bid being deemed non-responsive an automatic rejection.
13. The Work shall be completed within 30 consecutive calendar days. The completion of the work will be computed from the date of the Notice to Proceed or as stated in the pre-construction meeting.
14. Add or deduct amounts indicated on the outside of the envelope are allowed and will be applied to the lump sum amount. Amount shall be clearly stated and should be initialed by an authorized company representative.
15. "Liquidated Damages" shall mean the negotiated sum of which the Bidder agrees to pay for each consecutive working day beyond the Contract Time required to complete the work.
16. Construction areas min. safety requirements & important issues:
• The contractor shall post warning signs at all construction zones for pedestrians to be aware of their surroundings.
• The contractor shall prevent any damage to adjacent sidewalks, utilities, or private property during construction.
• Construction entrance, silt fences and any other required erosion control device shall be in place prior to clearing, construction, or demolition operations.
• All structures to be demolished shall be completely removed above and below grade.
• Abandoned service lines to the existing structures shall also be removed.
00200-3
17. Standard Specifications:
All work shall comply with all Federal, State, and local requirements and specifications.
Contractor shall follow the latest GDOT, City of Lawrenceville codes, and International Building Codes.
18. Addenda and Interpretations:
No interpretation of the meaning of the Drawings, Specifications or other bid documents will be made to any bidder orally. Every request for such interpretation should be made in writing. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Specifications. Failure of a bidder to receive any addendum shall not relieve him of any obligation under his bid. All addenda shall become part of the Contract Documents.
19. Site Examination:
The Bidder is advised to examine all the locations of the work and to inform himself fully as to its conditions, the conformation of the ground, the character, quality and quantity of the products needed preliminary to and during the execution of the work; the general and local conditions and all other matters which can in any way affect the work to be done under the Contract. The Plans are based on field run survey provided by the City of Lawrenceville, accuracy of this information shall be verified by the Bidder.
Failure to examine the site will not relieve the successful bidder of his obligation to furnish all products and labor necessary to carry out the provisions of his contract.
The Bidder shall notify the Owner of the date and time he proposes to examine the location of the work. The Bidder shall confine his examination to the specific areas designated for the proposed construction, including easements and public rights-of-way. If, due to some unforeseen reason, the Owner's proceedings for obtaining the proposed construction site (including easements), have not been completed, the Bidder may enter the site only with the express consent of the property owner. The Bidder is solely responsible for any damages caused by his examination of the site.
20. REQUIREMENTS:
The minimum requirements; the bidder must have:
1) Have the appropriate technical experience and working knowledge, to perform the work.
2) Have the right equipment and personnel to perform the work.
3) Have suitable financial means to meet obligations incidental to the work.
4) Have done and show proof of no less than THREE Contracts of similar character to the work being bid in the State of Georgia, each with an original contract price of no less than $500,000 within the past five years. A list of similar projects of this kind done by the contractor shall be attached to the bid including, the company's name and contact information.
5) Have visited and examined the locations of the work.
6) Be required to enter into a binding contract with the City to perform the work.
7) Be required to sign the City’s affidavit verifying compliance with O.C.G.A. 13-10-91 and Georgia Dept. of Labor Rule 300-10-1.02.
00200-4
PART II – BONDS AND INSURANCE
A) A Certified or Cashier’s Check payable to the City of Lawrenceville or a Bid Bond in the amount of five percent (5%) of the total bid must be submitted with the bid. Successful bidder will be required to furnish a payment and performance bond each in the amount of one hundred percent (100%) of the bid amount.
B) Bonding Company must be listed in the Federal Registry of Companies Holding certificates of authority as acceptable sureties on Federal bonds and must be listed in the AM Best catalog with a listing of A-5 or higher. Bonding company must also be licensed to do business by the Georgia Insurance Department.
The successful bidder, shall obtain, maintain, and furnish to the City certificates or insurance for the entire duration of the contract period. Insurance requirements starting on the next page.
00200-5
STANDARD INSURANCE REQUIREMENTS
(For projects less than $1,000,000)
1. Statutory Workers' Compensation Insurance
(a) Employers Liability:
Bodily Injury by Accident - $100,000 each accident Bodily Injury by Disease - $500,000 policy limit Bodily Injury by Disease - $100,000 each employee
2. Commercial General Liability Insurance
(a) $500,000 limit of liability per occurrence for bodily injury and property damage
(b) The following additional coverage must apply:
1986 (or later) ISO Commercial General Liability Form Dedicated Limits per Project Site or Location (CG 25 03 or CG 25 04) Additional Insured Endorsement (Form B CG 20 10 with a modification for completed operations or a separate endorsement covering Completed Operations) Blanket Contractual Liability Broad Form Property Damage Severability of Interest Underground, explosion, and collapse coverage Personal Injury (deleting both contractual and employee exclusions) Incidental Medical Malpractice Hostile Fire Pollution Wording
3. Auto Liability Insurance
(a) $500,000 limit of liability per occurrence for bodily injury and property damage
(b) Comprehensive form covering all owned, non-owned, leased, hired, and borrowed vehicles
(c) Additional Insured Endorsement
(d) Contractual Liability
4. Umbrella Liability Insurance - $1,000,000 limit of liability
(a) The following additional coverage must apply Additional Insured Endorsement Concurrency of Effective Dates with Primary Blanket Contractual Liability Drop Down Feature Care, Custody, and Control - Follow Form Primary Aggregates: Apply Where Applicable in Primary Umbrella Policy must be as broad as the primary policy
5. The City of Lawrenceville should be shown as an additional insured on General Liability, Auto
Liability and Umbrella Liability policies.
6. The cancellation should provide 10 days’ notice for nonpayment and 30 days’ notice of cancellation.
7. Certificate Holder should read:
City of Lawrenceville 70 S. Clayton St.
PO Box 2200 Lawrenceville, Georgia 30046
8. Insurance Company, except Worker' Compensation carrier, must have an A.M. Best Rating of A-5 or higher. Certain Workers' Comp funds may be acceptable by the approval of the Insurance Unit. European
00200-6 markets including those based in London and domestic surplus lines markets that operate on a non-admitted basis are exempt from this requirement provided that the contractor’s broker/agent can provide financial data to establish that a market is equal to or exceeds the financial strengths associated with the A.M. Best’s rating of A-5 or better.
9. Insurance Company should be licensed to do business by the Georgia Department of Insurance.
10. Certificates of Insurance, and any subsequent renewals, must reference specific bid/contract by project name and project/bid number.
11. The Contractor shall agree to provide complete certified copies of current insurance policy (ies) or a certified letter from the insurance company (ies) if requested by the City to verify the compliance with these insurance requirements.
12. All insurance coverages required to be provided by the Contractor will be primary over any insurance program carried by the City.
13. Contractor shall incorporate a copy of the insurance requirements as herein provided in each and every subcontract with each and every Subcontractor in any tier, and shall require each and every Subcontractor of any tier to comply with all such requirements. Contractor agrees that if for any reason Subcontractor fails to procure and maintain insurance as required, all such required Insurance shall be procured and maintained by Contractor at Contractor's expense.
14. No Contractor or Subcontractor shall commence any work of any kind under this Contract until all insurance requirements contained in this Contract have been complied with and until evidence of such compliance satisfactory to the City of Lawrenceville as to form and content has been filed with the City.
The Acord Certificate of Insurance or a preapproved substitute is the required form in all cases where reference is made to a Certificate of Insurance or an approved substitute.
15. The Contractor shall agree to waive all rights of subrogation against the City of Lawrenceville, the Mayor, City Council members, its officers, officials, employees, and volunteers from losses arising from work performed by the contractor for the City.
16. Special Form Contractors’ Equipment and Contents Insurance covering owned, used, and leased equipment, tools, supplies, and contents required to perform the services called for in the Contract. The coverage must be on a replacement cost basis. The City will be included as a Loss Payee in this coverage for City owned equipment, tools, supplies, and contents.
17. The Contractor shall make available to the City, through its records or records of their insurer, information regarding a specific claim related to any City project. Any loss run information available from the contractor or their insurer relating to a City project will be made available to the City upon their request.
18. Compliance by the Contractor and all subcontractors with the foregoing requirements as to carrying insurance shall not relieve the Contractor and all Subcontractors of their liability provisions of the Contract.
19. The Contractor and all Subcontractors are to comply with the Occupational Safety and Health Act of 1970, Public Law 91-956, and any other laws that may apply to this Contract.
20. The Contractor shall at a minimum apply risk management practices accepted by the contractors’ industry.
00200-7
Surety Bonds
All of the surety requirements will stay the same except the Surety Company must have the same rating as item 8 above.
PART III – CONTRACT AWARD AND EXECUTION
A. Within ten (10) days from receipt of the Notice of Award from the City, the successful bidder is required to:
1. Return to the City’s Purchasing Office contract documents executed by the authorized representative and attested by the corporate secretary of the bidder.
2. Provide insurance certificates as specified in the bidding documents; and
3. Provide a performance bond and a payment bond as specified in the bidding documents.
The City may extend this ten-day period at its discretion.
B. The successful bidder’s failure to execute the contract, provide a performance bond and a payment bond and furnish satisfactory proof of coverage of the insurance required within a ten-day period or any extension thereof may be just cause for annulment of the award and forfeiture of the bid guaranty to the City of Lawrenceville, not as a penalty but as liquidation of damages sustained. At the discretion of the City the award then may be made to the next lowest, responsible bidder, or the work may be re-advertised.
C. Samples of the payment bond and performance bond are included in Sections 00610 and 00620, Bonds
D. The contract documents, including the payment bond, performance bond, and insurance certificate, shall be executed and furnished to the City in duplicate.
END OF SECTION 00200
Lawrenceville Streetscape Design
STATEMENT OF EQUIPMENT
00300-1
STATEMENT OF EQUIPMENT
Show machinery and other equipment available to Contractor for prosecuting the Work included in Contract.
(To be filled in by Contractor and submitted with Bid.)
Available Machinery and Other Equipment
Kind - Size - Capacity Location Ownership
Date Proposed To Be Placed On Job
Site
The above is a true statement of the equipment available to the undersigned Bidder for prosecuting the Work included in the Contract. Where it is shown that the equipment is not owned by the Bidder, arrangements have been made with the owners to furnish the equipment.
Signed:
Name:
Title:
END OF SECTION
BIDDING FORM
00410-1
Failure to return this page as part of bid document may result in rejection of bid.
Bidder submits the following lump-sum/unit prices for the Downtown Lawrenceville Streetscape identified in Bid Form as part of this Bid. Failure to utilize and return this form as a part of the bidding documents may result in rejection of bid.
ITEM
NO. ITEM DESCRIPTION QTY UNIT UNIT
PRICE
TOTAL
PRICE
1 Warranties and Bonds 1 LS
Mobilization & Demobilization Night Work – All construction activities shall be performed between 9:00 PM and 5:00 AM, in accordance with the Project Manual.
1 LS
3 Traffic Control (Pedestrian and Vehicular).
Contractor to follow MUTCD.
1 LS
4 Earthwork and Grading 1 LS
Thermoplastic Striping. All included per plans and specs. Contractor to follow MUTCD and GDOT standards.
1 LS
Existing Thermoplastic Pavement Marking Removal (Grinding) – Remove existing thermoplastic pavement markings by grinding prior to installation of new pavement markings (In lieu of painting over existing striping with black paint, remove existing pavement markings by grinding).
1 LS
Demolition and Haul Off -including but not limited pavement, curb and gutter, drainage structures, saw cutting, removing brick, etc.
Contractor to use plans as reference. All included per plans and specs.
LS
(18-24)-Inch Varies Concrete Curb & Gutter – Furnish and install concrete curb and gutter in accordance with the plans and specifications.
700 LF
4-Inch Barrier Curb – Match existing barrier curb, including all labor, materials, and equipment necessary for a complete installation in accordance with the plans and specifications.
(Refer to Sheet C-107.)
42 LF
10 1-Inch Topsoil (All Landscape Islands to be filled) 1,400 SF
11 Sod (Bermuda) 1,400 SF
Concrete Driveway Apron (8-Inch Thick Reinforced) – Per Gwinnett County Standards.
Include all utility adjustments at the Contractor's expense. (Driveway apron shall not extend pass the right-of-way line. Refer to Sheet C-107).
100 SF
00410-2
ADA Sidewalk Ramps – Construct ADA-compliant sidewalk ramps using truncated dome ADA paver bricks in accordance with the plans and specifications.
250 SF
Concrete Sidewalk 4” thick per Gwinnett County Standards. All utility adjustments must be at contractor cost and responsibility.
250 SF
Replace and/or repair all missing, damaged, or deteriorated red brick 4”x8”x2-1/4” with buff mortar as required in accordance with the plans and specifications. (Refer to Sheets C-106 and C-108.)
250 SF
Drainage Structure Adjustment – Raise Drop Inlet Top and/or Curb Inlet Top Only. Work shall include adjustment of the inlet top elevation as required by the plans; (Adjustment of the entire drainage structure is not included). Contractor shall perform all work in accordance with GDOT Standards and Specifications.
4 EA
Concrete Valley Gutter, including all required steel gutter plates, shall be furnished and installed in accordance with the plans and specifications.
(Refer to Detail Sheet C-300.)
250 LF
Utility Adjustment- Adjust existing utility meter box tops by raising to the proposed elevations as indicated in the plans. Contractor shall coordinate all utility adjustments with the Gwinnett County Department of Water Resources (DWR), including all required approvals and inspections.(Refer to Plans sheets C-105, C-106, and C-107).
3 EA
Removal of existing signs and poles, including all necessary labor, equipment, and disposal, shall be performed in accordance with the plans and specifications. (Refer to Sheets C-106 and C- 107.)
2 EA
Utility Adjustment – Replace existing electrical box top and fill abandoned/open excavation areas as required. All work shall be completed in accordance with the plans and specifications.
(Refer to Detail Sheet C-107.)
1 EA
Lighting STD, 11-15FT MH, including Concrete Foundation (per manufacture). STERNBERG (Model Number 4212FP4-.125-ABC-SKT/BKT
POLE)
16 EA
Luminaire, TP 3, LED. TERNBERG HERITAGE (Model Number PT_6130CLED-12L40T3-
MDL014-CSA-FHC-PEC/BKT FIXTURE)
16 EA
Installation of Pull Box. (1419 Carson box to be provided by City (box only). 17 EA
GFCI Receptacle in weatherproof cast aluminum box and cover 16 EA
Exterior Lighting Conduit Run and Wiring per manufacturer specifications. See Detail on Sheet E-001.
16 EA
00410-3
Bored 2-Inch Underground Conduit HDPE – Provide and install 2-inch underground conduit with six (6) #4 AWG conductors and one (1) #4 G ground conductor in accordance with the plans and specifications. (Refer to Sheets E-101 through E-104.)
610 LF
Bored 2-Inch Underground Conduit HDPE – Provide and install 2-inch underground conduit with ten (10) #4 AWG conductors and one (1) #4G ground conductor in accordance with the plans and specifications. (Refer to Sheets E-101 through E-104.)
145 LF
Bored 3-Inch Underground Conduit HDPE – Furnish and install 3-inch underground conduit, including fourteen (14) #4 AWG conductors and one (1) #4G ground conductor, complete in accordance with the plans and specifications.
(Refer to Sheets E-101 through E-104.)
305 LF
Bored 3-Inch Underground Conduit HDPE – Furnish and install 3-inch underground conduit, including ten (10) #4 AWG conductors and one
(1) #4G ground conductor, complete in accordance with the plans and specifications.
(Refer to Sheets E-101 through E-104.)
755 LF
Panel LP-1-Provide (4) new 20AMP/1-pole circuit breakers in existing Panel LP-1. Connect new street lighting circuits and receptacle circuits to existing Panel LP-1. Provide a photocell and 8-pole relay contactor housed within a NEMA 3R enclosure for control of the lighting circuits.
(Refer to Sheet E-102).
1 EA
Panel "S" or “T” - Provide and install new 208/120V, 3-phase, 60A NEMA 3R sub-panel, including feeders from existing Panel "S" or “T”.
Mount sub-panel on back of existing H-frame.
Provide four (4) new 20AMP/1-pole breakers.
Connect new street lighting circuits and receptacle circuits to new sub-panel. Provide a photocell and 8-pole relay contactor within a NEMA 3R enclosure to control light circuits.
(Refer to Sheet E-104.)
1 EA
32 Remove Existing Light Pole and Associated Overhead Line on S Clayton St (Refer to Sheets E-103)
1 LS
TOTAL $
00410-4
Amounts are to be shown in numbers only. It is understood; that the estimated quantities in the Bid Proposal are approximate and are used only for comparison of bids, and are subject to increase or decrease as required to properly complete the Contract work. Low bidder shall be determined on the basis of the TOTAL BID PRICE. Furthermore, the Contractor shall be responsible for including all items required to perform the project as indicated on the plans and specifications and including all costs into the most appropriate unit prices, if not explicitly described in the Payment paragraph of each section.
NOTES
*Individuals, firms and businesses seeking an award of a City of Lawrenceville contract may not initiate or continue any verbal or written communications regarding a solicitation with any City officer, elected official, employee or other City representative without permission of the Purchasing Manager named in the solicitation between the date of the issuance of the solicitation and the date of the final contract award by the City Council. Violations will be reviewed by the Purchasing Manager. If determined that such communication has compromised the competitive process, the offer submitted by the individual, firm or business may be disqualified from consideration for award.
00410-5
Failure to return this page as part of bid document may result in rejection of bid.
BIDDING FORM CONTINUED
(This Bid Form is part of the Bid Documents)
BID NUMBER: SB007-27 BID DATE: September 3, 2026
SUBMITTAL DATE:
BY:
(Bidder)
PROJECT DESCRIPTION: Downtown Lawrenceville Streetscape
THIS BID IS SUBMITTED TO: City of Lawrenceville, Georgia (hereinafter called Owner)
This bid is submitted to the City of Lawrenceville in accordance with the instructions, requirements, and forms included in the bidding documents, and the bidder agrees to complete all work for the bid price and substantially complete the work within 30 calendar days from the written notice to proceed.
The bidder agrees if the bid is accepted by the City of Lawrenceville within ninety (90) days of the date of bid opening, the bidder shall within ten (10) days after receipt of notification of this acceptance execute a contract upon the terms, conditions, and prices set forth herein and in the form and manner required by the City of Lawrenceville. The bidder further accepts the terms and conditions contained in the bidding requirements for disposition of bid security.
In submitting this bid, bidder makes representations required by Instructions to Bidders and further warrants and represents:
a. Bidder has examined Bid Document Package, including Advertisement for Bids and
Instructions to Bidders, and following addenda:
b. Bidder has examined site and locality where the work is to be performed and legal requirements (federal, state, and local laws, ordinances, rules, and regulations) and conditions affecting work cost, difficulty, progress, or performance and has made independent investigations as bidder deems necessary.
c. Bidder has carefully studied reports and drawings indicating subsurface conditions and drawings depicting physical conditions as identified in General Conditions and accepts
No. Dated No. Dated No. Dated No. Dated No. Dated No. Dated No. Dated No. Dated
00410-6 determination concerning technical data contained in reports and drawings on which bidder is entitled to rely.
d. Bidder has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) examinations, investigations, explorations, tests, and studies (in addition to or to supplement those referred to in "c." above) pertaining to subsurface or physical conditions at site or otherwise affecting cost, progress, performance, or furnishing work as bidder considers necessary for performing or furnishing work at contract price, within contract time, and in accordance with terms and conditions contained in bid document package, including specifically provisions stated in General Conditions and no additional examinations, investigations, explorations, tests, reports, or similar information or data are or will be required by bidder.
e. Bidder has reviewed and checked plans and data shown or indicated on bid document package with respect to existing underground facilities at or contiguous to site and assumes responsibility for accurately locating underground facilities. No additional examinations, investigations, explorations, tests, reports, or similar information or data concerning underground facilities are or will be required by bidder in order to perform and furnish work at contract price, within contract time, and in accordance with terms and conditions contained in bid document package, including specifically provisions stated in General Conditions.
f. Bidder has correlated results from observations, examinations, investigations, explorations, tests, reports, and studies with terms and conditions contained in bid document package.
g. Bidder has given Owner written notice concerning conflicts, errors, or discrepancies discovered in bid document package and written resolution by Owner is acceptable to bidder.
h. This bid is genuine and not made in interest of or for any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules produced by any group, association, organization, or corporation; bidder has not directly or indirectly induced or solicited any other bidder to submit false or sham bid; bidder has not solicited or induced any person, firm, or corporation to refrain from bidding; and bidder has not sought by collusion to obtain for itself any advantage over any other bidder or over Owner.
i. The City requires that all who enter into a contract for the physical performance of services with the City must satisfy O.C.G.A. 13-10-91 and Rule 300-10-1-.02, in all manner, and such are conditions of the contract.
j. By submitting a bid to the City, contractor agrees that they are in compliance with O.C.G.A.
13-10-91 and Rule 300-10-1-.02. Such attestation(s) shall be maintained and may be inspected by the City at any time. Any such attestation shall become a part of the contractor/subcontractor agreement.
k. An affidavit of such compliance with O.C.G.A. 13-10-91 and Rule 300-10-1-.02 will be initiated by the City, signed by the contractor, and will become part of the contract.
00410-7
l. It is the policy of the City of Lawrenceville that unauthorized aliens shall not be employed to perform work on City contracts involving the physical performance of services. Therefore, the City shall not enter into a contract for the physical performance of services within the State of Georgia unless the contractor shall provide evidence on City-provided forms that it and its subcontractors have registered for and are participating in the federal work authorization program as defined by O.C.G.A. 13-10-90(2) to verify information of all new employees.
m. The Purchasing Manager shall be authorized to conduct random audits of a contractor’s or subcontractors’ compliance with O.C.G.A. 13-10-91 and the rules and regulations of the Georgia Department of Labor. The contractor and subcontractors shall retain all documents and records of its compliance for a period of three (3) years following completion of the contract. Whenever it appears that a contractor’s or subcontractor’s records are not sufficient to verify the work eligibility of any individual in the employ of such contractor or subcontractor, the Purchasing Manager shall report same to the Department of Homeland Security.
A contractor’s failure to participate in the federal work authorization program as defined by O.C.G.A. 13-10-90(2) may be sanctioned by termination of the contract. If it is determined that a subcontractor is not participating in the federal work authorization program as defined by O.C.G.A. 13-10-90(2), the City of Lawrenceville may direct the contractor to terminate that subcontractor. A contractor’s failure to follow the City’s instruction to terminate a subcontractor that is not participating in the federal work authorization program as defined by O.C.G.A. 13-10-90(2) may be sanctioned by termination of the contract.
n. The above requirements shall be in addition to the requirements of state and federal law, and shall be construed to be in conformity with those laws.
In compliance with the attached specifications, the undersigned offers and agrees, if this bid is accepted by the City Council within ninety (90) days of the date of bid opening, to furnish any or all of the items upon which prices are quoted within the time specified in the bid schedule.
Legal Business Name
Federal Tax ID
Address
Representative Signature
Print Authorized Representative's Name
Telephone Number Fax Number
E-Mail Address
00410-8
BIDDER'S ACKNOWLEDGEMENT
The undersigned bidder acknowledges all requirements outlined in the above "Instructions to Bidders Package" and all documents referred to therein. This signed form must accompany the completed bid form submitted at the time of bid.
SEAL
(Corporate Seal Required if Bidder is a Corporation)
COMPANY NAME:
ADDRESS:
TELEPHONE NO.:
SIGNATURE: DATE:
(President, Vice President or Corporate Officer)
PRINTED NAME: TITLE:
ATTESTED BY: DATE:
(Secretary of Corporation)
PRINTED NAME: TITLE:
CITY: STATE: ZIP:
BID BOND
00430-1
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor) a
(Corporation, Partnership or Individual) hereinafter called Principal, and
(Name of Surety)
(Address of Surety) a Corporation of the State of , and a surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held and firmly bound unto
City of Lawrenceville (Name of Obligee)
70 S. Clayton Street, Lawrenceville, Georgia 30046 (Address of Obligee)
Thereinafter referred to as Obligee: in the penal sum of Dollars ($ ) in lawful money of the United States, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
WHEREAS, the Principal is about to submit, or has submitted, to Lawrenceville, Georgia, a proposal for furnishing materials, labor, and equipment for:
WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder's check otherwise required to accompany this Proposal.
NOW, THEREFORE, the conditions of this obligation are such that if the proposal be accepted, the Principal shall within ten days after receipt of notification of the acceptance, execute a Contract in accordance with the Proposal and upon the terms, conditions, and prices set forth in the form and manner required by Lawrenceville, Georgia, and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to Lawrenceville, Georgia, each in the amount of 100% of the total Contract Price, in form and with security satisfactory to said Lawrenceville, Georgia, and otherwise, to be and remain in full force and virtue in law, and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of Lawrenceville, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.
00430-2
PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. 6-91-1 et seq., and is intended to be and shall be constructed as a bond in compliance with the requirements thereof.
Signed, sealed and dated this day of , A.D., 20 .
ATTEST:
(Principal)
(Principal Secretary)
(SEAL)
By:
(Address)
(Witness as to Principal)
(Surety)
ATTEST: By:
(Attorney-in-Fact)
Resident or Nonresident Agent
(Witness as to Surety)
NOTE: If Contractor is Partnership, all partners should execute Bond. Surety Companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the Project is located.
BIDDER QUALIFICATIONS
00440-1
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information desired. Attach all additional sheets to this statement.
1. Name of Bidder:
2. Permanent main office address:
3. When organized:
4. If a Corporation, where incorporated:
5. How many years have you been engaged in the contracting business under your present firm or trade name?
6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion. Attach copy of the contracts on hand).
7. General description of work performed by your company. Attach copy.
8. Have you ever failed to complete any work awarded to you? If so, where and why .
9. Have you ever defaulted on a contract? If so, where and why? .
10. List the most important projects recently completed by your company, stating the approximate cost for each, and the month and year completed. Attach copy.
11. Experience in construction work similar in importance to this project. Attach copy.
12. Background and experience of the principal members of your organization, including officers:
Attach copy.
13. List any litigation the firm or any parent firm has been in or is currently involved in and state the status and/or outcome:
MINIMUM REQUIREMENTS
The bidder must:
• Maintain a permanent place of business.
• Have the appropriate technical experience and working knowledge, to perform the work.
• Have the right equipment and personnel to perform the work.
• Have suitable financial means to meet obligations incidental to the work.
• Show proof of no less than THREE Contracts of similar character to the work being bid for a public agency, each with an original contract price of no less than $500,000.00 within the past five years.
• Have visited and examined the location of the work.
• Have Underground Utility Contractor’s license and/or Utility Manager license, and/or
General Contractor license. (A copy must be attached to the “Statement Of Builders Qualifications” sheet)
• Enter into a binding contract with the City to perform the work.
• Sign the City’s affidavit verifying compliance with O.C.G.A. 13-10-91 and Georgia
Dept. of Labor Rule 300-10-1.02
00440-2
00440-3
The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the local public agency in verification of the recitals comprising this Statement of Bidder's Qualifications.
Dated this day of , 20 .
(Name of Bidder)
Title:
State of
County of being duly sworn deposes and says that he or she is of and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 20 .
(Notary Public) My Commission Expires:
(Date)
END OF SECTION
NON-COLLUSION AFFIDAVIT
00480-1
CITY OF LAWRENCEVILLE, GEORGIA
FORM OF NON-COLLUSION AFFIDAVIT
(This Non-Collusion Affidavit is Part of the Bid Documents)
BID NUMBER: SB007-27 BID DATE: September 3, 2026
Project Name: Downtown Lawrenceville Streetscape
STATE OF )
SS.
COUNTY OF )
being first duly sworn, deposes and says that he is
(Sole owner, partner, president, secretary, etc.)
The party making the foregoing Proposal or Bid; that such Bid is genuine and not collusive or sham;
that said Bidder has not colluded, conspired, connived, or agreed, directly or indirectly, with any Bidder or person, to put in a sham Bid, or that such other person shall refrain from bidding, and has not in any manner, directly or indirectly sought by agreement or collusion, or communication or conference, with any person, to fix the Bid Price of affiant or any other Bidder, or to fix any overhead, profit or cost element of said Bid Price, or of that of any other Bidder, or to secure any advantage against the City of Lawrenceville, or any person interested in the proposed Contract; and that all statements in said Proposal or Bid are true; and further, that such Bidder has not, directly or indirectly submitted this Bid, or the contents thereof, or divulged information or data relative thereto to any association or to any member or agent thereof.
(Affiant)
(Notary Public in and for)
(County)
Subscribed and Sworn to before me this Day of 20
My Commission expires , 20
LAWRENCEVILLE, GEORGIA
SAMPLE CONTRACT FORM
00520-1
CONTRACT
This CONTRACT made and entered into this day of , 20 by and between the City of Lawrenceville, Georgia, a Georgia Municipal Corporation, duly organized and existing under the laws of the State of Georgia (Party of the First Part, hereinafter called the City), and , (Party of the Second Part, hereinafter called the Contractor).
WITNESSETH: That the Contractor has agreed, and by these presents does agree, with the City for the consideration herein mentioned to furnish all equipment, tools, material, skill, knowledge and labor of every description necessary to carry out and complete in a good, firm, substantial and workmanlike manner the work required under the Contract Documents and under the provisions of the Performance Bond and Payment Bond. The term Contract Documents shall include: the Drawings and Specifications of the project, the Proposal made by the Contractor, the Advertisement, the Instructions to Bidder, the Bid Form, the General Conditions and this Contract.
The work shall be performed in strict conformity with the Contract Documents and said Contract Documents shall all form essential parts of the Contract. The work covered by this Contract includes all work shown on the plans and specifications and listed in the conditions and specifications to wit:
The Contractor awarded work under this contract shall commence work within ten (10) days after the issuance of the Notice to Proceed and shall fully complete all work hereunder within 30 consecutive calendar days from and after said date.
CITY and CONTRACTOR recognize that time is the essence of this Agreement. If the WORK is not substantially complete within the time specified (plus any extension of time allowed in the General Conditions), the CITY will suffer damage and loss that is difficult to calculate. The CITY and CONTRACTOR recognize and agree that the damage and loss that CITY will suffer if the WORK is not completed in a timely manner in accordance with the contract terms is difficult or impossible to accurately calculate. Therefore, CITY and CONTRACTOR agree that a reasonable amount to fully compensate CITY for damage and loss it would incur as a result of the failure of CONTRACTOR to complete the WORK in the time allowed by this Agreement shall be the sum of $1,000.00 per day. The amount in this provision is an amount CITY and CONTRACTOR agree upon as a reasonable amount of damages to fully compensate the CITY for any damage or loss it would suffer from a delay in the timely completion of the WORK, and is intended to provide CITY with reasonable liquidated damages and is not intended as a penalty.
The City shall pay and the Contractor shall receive the unit prices stipulated in the proposal hereto attached as full compensation for everything furnished and done by the Contractor under this contract, which shall in no event exceed ($ ) based on the proposal which sum shall be paid in the manner and terms specified in the Contract Documents, but before issuance of certificate of payment, if the Contractor shall not have submitted evidence satisfactory to the City that all payrolls, materials bills, and other indebtedness connected with the work have been paid, the City may withhold, in addition to the retained percentages, such amount or amounts as may be necessary to pay just claims for labor and services rendered and materials in and about the work, and such amount or amounts withheld or retained may be applied by the City to the payment of such just claims.
00520-2
When the Contractor has performed in accordance with the provisions of this Contract, the City of…