This is a Certificate of Permission issued by the Connecticut Department of Energy and Environmental Protection (DEEP) and related project site plan documents for shoreline structure repair and public access walkway improvements at Saybrook Point in Old Saybrook, Connecticut. The project, identified as License Number 202503154-COP and issued July 3, 2025, authorizes the Town of Old Saybrook and The Point, LLC to conduct comprehensive seawall repair work at 145 & Lot 42-2 College Street. The authorized activities include retention of pre-1995 structures (timber deck, concrete footing, timber breakwater, riprap slope, stone bulkhead, concrete wall, and existing concrete walkway), rebuilding of the timber deck in-place to elevation 5.3' NAVD88 with pile replacement, repair of riprap by restacking dislodged stones and adding approximately 10% new stone, reconstruction of the stone bulkhead to elevation 4.5' NAVD88 with associated drainage improvements, rebuilding of the concrete wall to elevation 7.5' NAVD88, and installation of a new 10' x 510' pedestrian access concrete walkway to elevation 5.3' NAVD88. The license is valid for five years from issuance and establishes comprehensive conditions governing the work execution.
The license imposes significant operational and environmental restrictions on project execution. Work on the stone bulkhead and concrete seawall must occur during lower water periods to minimize sedimentation, while barge staging is limited to higher water periods to prevent substrate contact. No pile driving is permitted between April 1st and June 30th to protect anadromous fish migration, and pile driving from May 1st through November 1st must incorporate soft-start procedures for Atlantic and Shortnose Sturgeon protection. Construction of the stone bulkhead must proceed in 50-foot sections with turbidity curtains maintained throughout work to minimize environmental impact. Prior to commencing work, the licensee must submit a Work Commencement Form identifying all contractors and expected construction dates, provide copies of the license to all contractors, file a Land Record Filing with the municipality within 30 days of license issuance, and submit a Compliance Certification Form within 90 days of project completion. All waste materials must be placed at approved upland sites, and temporary hydraulic facilities must be designed by qualified professionals in accordance with Connecticut Guidelines for Soil Erosion and Sediment Control and the 2004 Connecticut Stormwater Quality Manual.
Text of this file
An Affirmative Action/Equal Opportunity Employer 79 Elm Street Hartford, CT 06106-5127 860.424.3000 cc: File 202503154-COP cc (via email): Town of Old Saybrook & The Point, LLC Jennifer.Donahue@oldsaybrookct.gov
Christina Fluckiger, christina@coastlineconsulting.com
Encl(s): LWRD General Conditions; Land Record Filing; Site Plan Set ; Compliance Certification Form
Maeve Rourke, Analyst Land & Water Resources Division Bureau of Water Protection & Land Reuse
Sincerely, If you should have any questions or concerns, please contact Maeve Rourke, (860) 424-3659, maeve .rourke@ct.gov.
If you have not already done so, you should contact your local Planning and Zoning Office and the U. S.
Army Corps of Engineers to determine local and federal permit requirements on your project, if any.
Write the Corps' New England District, Regulatory Branch, 696 Virginia Road, Concord, MA 01742- 2751; http://www.nae.usace.army.mil/ or call 1-800-343-4789.
Your initiation of authorized activities will be relied upon as your agreement to comply with the terms and conditions of the license.
Any work in regulated areas of the State which has not been authorized by a valid license is a violation of state law and subject to enforcement action by the Department of Energy & Environmental Protection and the Office of the Attorney General.
Please find attached a copy of your subject license and relevant enclosures which are being issued pursuant to your application of April 10, 2025. Your attention is directed to the conditions of the license.
All work must conform to that which is specifically authorized.
Dear Ms. Jennifer Donahue:
202503154-COP
145 & Lot 42-2 College Street, Old Saybrook CT
SUBJECT:
Town of Old Saybrook & The Point, LLC 302 Main Street Old Saybrook, CT 06475
~~ Connecticut ~~ Department of Energy & f_Y Environmental Protection
July 3, 2025
860.424.3000
*Connecticut's Uniform Administrative Procedure Act defines License to include, "the whole or part of any agency permit, certificate, approval, registration, charter or similar form of permission required by law ... "
License Enclosures: L WRD General Conditions; Land Record Filing; Site Plan Set;
LWRD Work Commencement Form; LWRD Compliance Certification Form
Project Site Plan Set: Eight (8) sheets of plans titled "Bulkhead Repair & Pedestrian Walkway Project," prepared by Coastline Consulting & development on 5/5/2025.
License Expiration: Five (5) years from the date of issuance of this license.
Agency Contact: Land & Water Resources Division, Bureau of Water Protection & Land Reuse, 860-424-3019
Applicable Regulations of CT State Agencies:
Authorizing CT Statute(s) CGS Section 22a-359 to 363g and/or Federal Law:
Waters: Connecticut River
Project Address/Location: 145 & Lot 42-2 College Street
Project Description: Shoreline structure repair and public access walkway.
Municipality: Old Saybrook
License Number(s): 202503154-COP
PO Box 477 Mystic, CT 06355
Licensee Address(s): 302 Main Street Old Saybrook, CT 06475
The Point, LLC Licensee(s): Town of Old Saybrook
Certificate of Permission
Connecticut Department of Energy and Environmental Protection License*
~~ Connecticut ~~ Department of Energy & 11_::.F Environmental Protection
This license is subject to the following Terms and Conditions:
1. License Enclosure(s) and Conditions. The Licensee shall comply with all applicable terms and conditions as may be stipulated within the License Enclosure(s) listed above.
Failure to comply with the terms and conditions of this license shall subject the Licensee and I or the Licensee's contractor(s) to enforcement actions and penalties as provided by law.
The Licensee is hereby authorized to conduct the following work as described in application # 202503154 and as depicted on any site plan sheets I sets cited herein:
1. Retain the following pre-1995 structures:
a. An over-water 49' x 49' timber deck and 16 support piles with a top elevation of
4.9' NAVD88,
b. An 8" x 48' concrete footing beneath the timber deck along the shore,
c. A 2" by 32' timber breakwater with six (6) 12" timber piles, along the northern perimeter of the deck,
d. A 210' long, 1,800 SF riprap slope located beneath the deck and extending from the deck to the north and to the south along the shore,
e. A 3.5' x 525' stone bulkhead and a 3.5' x 12.5' northerly return with a top elevation ranging from 3.6' to 4.7' NAVD88.
f. A 1' x 350' concrete wall atop the northern section of the stone bulkhead, with a top elevation of 7.5' NAVD88.
g. An approximately 4.5' x 525' concrete walkway atop the stone bulkhead.
h. A 15' x 50' (30 CY) area ofriprap to the northwest of the bulkhead return.
2. Rebuild the timber deck described in I.a. above, in-place to a top elevation of 5.3' NA VD88 and replace deteriorated piles.
3. Repair the riprap described in 1.d above by:
a. Restacking dislodged stones within the existing footprint, and
b. Adding approximately 10% new stone.
4. Repair the stone bulkhead described in 1.e above by:
a. Placing a temporary turbidity curtain around active construction areas,
b. Placing approximately 250 CY of concrete fill landward of the bulkhead,
c. Installing approximately 180 CY of crushed stone beneath the bulkhead area and concrete fill,
d. Installing approximately 355 CY crushed stone drainage apron with filter fabric landward of the concrete fill,
e. Rebuilding the stone bulkhead in-place to a top elevation of 4.5' NAVD88, and
f. Removing the temporary turbidity curtain to an upland location.
5. Rebuild the concrete wall described in 1.f above in-place and in-kind, to a top elevation of 7.5' NAVD88.
6. Install a new pedestrian access walkway atop the bulkhead as follows:
a. Install a 10' x 510' (130 CY) concrete walkway to a top elevation of 5.3'
NAVD88, and
b. Install a 14.5' x 14.5' (6 CY) concrete pad to a top elevation of 5.3' NAVD 88 on the northern end of the walkway.
Authorized Activities:
Page 2of4 License Number(s): 202503154-COP
2. Other Approvals. Prior to the commencement of the work authorized herein the Licensee shall obtain all appropriate state, local and federal authorizations as necessary.
3. Barge Staging and Storage. Any barge utilized in the execution of the work authorized herein shall occur only during periods of higher water to prevent the barge from resting on, or coming into contact with, the substrate at any time.
4. Height of Tide Restriction. All work authorized herein conducted on the stone bulkhead and concrete seawall shall be conducted during periods of lower water to minimize sedimentation.
5. Waste Material. All waste material generated by the performance of the work authorized herein shall be placed by the Licensee at an upland site approved by applicable state and/or municipal regulatory authorities for the placement of such waste material. The Licensee shall not allow debris, concrete, or other waste material to enter the Connecticut River and shall immediately remove such debris or waste material that does enter the Connecticut River.
6. Time of Year Restriction. In order to protect anadromous fish migration, no pile driving shall occur between April I st through June 30th, inclusive, of any year.
7. Atlantic & Shortnose Sturgeon Protection. All pile driving done from May l " to November 1 si, inclusive of any year, shall be done with a "soft start" to allow sufficient time for these fish to leave the project area before the impacts become injurious. Soft starts should be used at the beginning of each workday and any time pile driving ceases for a period of 30 minutes or more.
a. A soft start with an impact hammer is defined as three strikes with the hammer at 40% energy, followed by a one-minute wait period, then two subsequent three strike sets at 40% energy, each with one-minute wait periods, before initiating continuous impact driving at full energy.
b. A soft start with a vibratory hammer is defined as pile driving for 15 seconds at reduced energy, followed by a one-minute wait period. This sequence of 15 seconds of reduced energy pile driving followed by one-minute waiting periods should be repeated two additional times, followed immediately by pile driving at full rate and energy.
8. Turbidity Curtain. Prior to the repair of the stone bulkhead authorized herein, the Licensee shall install a turbidity curtain extending from the water surface to the substrate around the work area. Such erosion and sediment control structures shall be maintained in optimal operating condition until project completion at which time the erosion and sediment controls shall be removed to an upland location.
9. Construction Phasing. The repair of the stone bulkhead authorized herein shall be conducted in 50' sections to minimize turbidity and maintain structural integrity of the slope.
Page 3of4 License Number(s): 202503154-COP
Brian P. Thompson Division Director Land & Water Resources Division
Date
Issued under the authority of the Commissioner of Energy and Environmental Protection on: pr-~
Page 4of4 License Number(s): 202503154-COP
July 3, 2025
860.424.3000
1 The Work Commencement condition and the need for a Work Commencement Form is not applicable to Flood Management Certification approvals.
5. Unauthorized Activities. Except as specifically authorized, no equipment or material, including but not limited to, fill, construction materials, excavated material or debris, shall be deposited, placed or stored in any wetland or watercourse on or off-site. The Licensee may not
4. For Coastal Licenses Only - License Notice. The Licensee shall post the first page of the License in a conspicuous place at the work area while the work authorized therein is undertaken.
3. Work Commencement1• Not later than two (2) weeks prior to the commencement of any work authorized herein, the Licensee shall submit to DEEP.LWRDRegulatory@ct.gov, on the Work Commencement Form attached hereto, the name(s) and address(es) of all contractor(s) employed to conduct such work and the expected date for commencement and completion of such work, if any.
• For water diversion activities authorized pursuant to 22a-377(c)-1 of the Regulations of Connecticut State Agencies, the Licensee shall also notify the Commissioner in writing two weeks prior to initiating the authorized diversion.
• For emergency activities authorized pursuant Connecticut General Statutes Section 22a-6k, the Licensee shall notify the Commissioner, in writing, of activity commencement at least one (1) day prior to construction and of activity completion no later than five (5) days after conclusion.
2. Contractor Notification. The Licensee shall give a copy of the license and its attachments to the contractor(s) who will be carrying out the authorized activities prior to the start of construction and shall receive a written receipt for such copy, signed and dated by such contractor(s). The Licensee's contractor(s) shall conduct all operations at the site in full compliance with the license and, to the extent provided by law, may be held liable for any violation of the terms and conditions of the license. At the work site, the contractor( s) shall, whenever work is being performed, have on site and make available for inspection a copy of the license and the authorized plans.
1. Land Record Filing (for Structures Dredging & Fill, Tidal Wetlands, Certificate of Permission, and Long Island Sound General Permit Licenses only). The Licensee shall file the Land Record Filing on the land records of the municipality in which the subject property is located not later than thirty (30) days after license issuance pursuant to Connecticut General Statutes (CGS) Section 22a-363g. A copy of the Notice with a stamp or other such proof of filing with the municipality shall be submitted to DEEP.LWRDRegulatory@ct.gov no later than sixty (60) days after license issuance. If a Land Record Filing form is not enclosed and the work site is not associated with an upland property, no filing is required.
L WRD General Conditions
~~ Connecticut c:;_:;:: Environmental Protection
10. Excavated Materials. Unless otherwise authorized, all excavated material shall be staged and
9. Temporary Hydraulic Facilities for Water Handling. If not reviewed and approved as a part of the license application, temporary hydraulic facilities shall be designed by a qualified professional and in accordance with the Connecticut Guidelines for Soil Erosion and Sediment Control, the 2004 Connecticut Stormwater Quality Manual, or the Department of Transportation's ConnDOT Drainage Manual, as applicable. Temporary hydraulic facilities may include channels, culverts or bridges which are required for haul roads, channel relocations, culvert installations, bridge construction, temporary roads, or detours.
8. For State Actions Only - Material or Equipment Storage in the Floodplain. Unless approved by a Flood Management Exemption, the storage of any materials at the site which are buoyant, hazardous, flammable, explosive, soluble, expansive, radioactive, or which could in the event of a flood be injurious to human, animal or plant life, below the elevation of the five-hundred (500) year flood is prohibited. Any other material or equipment stored at the site below said elevation by the Licensee or the Licensee's contractor must be firmly anchored, restrained or enclosed to prevent flotation. The quantity of fuel stored below such elevation for equipment used at the site shall not exceed the quantity of fuel that is expected to be used by such equipment in one day. In accordance with the licensee's Flood Contingency Plan, the Licensee shall remove equipment and materials from the floodplain during periods when flood warnings have been issued or are anticipated by a responsible federal, state or local agency. It shall be the Licensee's responsibility to obtain such warnings when flooding is anticipated.
• The confinement technique used shall completely isolate and protect the confined area from all flowing water. The use of silt boom/curtain or similar technique as a means for confinement is prohibited.
7. Unconfined Instream Work. Unless otherwise noted in a condition of the license, the following conditions apply to projects in non-coastal waters:
• Unconfined instream work is limited to the period June I through September 30.
• Confinement of a work area by cofferdam techniques using sand bag placement, sheet pile installation (vibratory method only), portadam, or similar confinement devices is allowed any time of the year. The removal of such confinement devices is allowed any time of the year.
• Once a work area has been confined, in-water work within the confined area is allowed any time of the year.
6. Management of Materials. Any materials removed from the site shall be managed in accordance with all federal, state, and local requirements, including Chapter 446K Water Pollution Control, Chapter 445 Hazardous Waste, and Chapter 446d Solid Waste of the Connecticut General Statutes.
conduct work within wetlands or watercourses other than as specifically authorized, unless otherwise authorized in writing by the Commissioner. Tidal wetlands means "wetland" as defined by section 22a-29 and "freshwater wetlands and watercourses" means "wetlands" and "watercourses" as defined by section 22a-38.
Page 2 of6 General Conditions for L WRD Licenses
16. De Minimis Alteration. The Licensee shall not deviate from the authorized activity without prior written approval from the Commissioner. The Licensee may request a de minimis change
b. A change in the form of ownership of any structure authorized herein from a rental/lease commercial marina to a wholly-owned common interest community or dockominium may constitute a change in purpose as specified in paragraph (a) above.
15. Change of Use. (Applies only if a use is specified within the License "Project Description")
a. The work specified in the license is authorized solely for the purpose set forth in the license. No change in purpose or use of the authorized work or facilities as set forth in the license may occur without the prior written approval of the Commissioner. The Licensee shall, prior to undertaking or allowing any change in use or purpose from that which is authorized by this license, request permission from the Commissioner for such change. Said request shall be in writing and shall describe the proposed change and the reason for the change.
14. Inspection. The Licensee shall allow any representative of the Commissioner to inspect the project location at reasonable times to ensure that work is being or has been conducted in accordance with the terms and conditions of this license.
13. Work Site Restoration. Upon completion of any authorized work, the Licensee shall restore all areas temporarily impacted by construction, or used as a staging area or accessway in connection with such work, to their condition prior to the commencement of such work.
12. In-Water Work Vessel Staging and Storage. (for Structures Dredging & Fill, Tidal Wetlands, Certificate of Permission, and Long Island Sound General Permit Licenses only). For any barge, vessel, skiff or floating work platform ("work vessels") utilized in the execution of the work authorized herein, the Licensee shall ensure that such work vessels:
• do not rest on, or come in contact with, the substrate at any time, unless specifically authorized in the license.
• are not stored over intertidal flats, submerged aquatic vegetation or tidal wetland vegetation or in a location that interferes with navigation. In the event any work vessel is grounded, no dragging or prop dredging shall occur to free it.
11. Best Management Practices. The Licensee shall not cause or allow pollution of any wetlands or watercourses, including pollution resulting from sedimentation and erosion. In constructing or maintaining any authorized structure or facility or conducting any authorized activity, or in removing any such structure or facility, the Licensee shall employ best management practices to control storm water discharges, to prevent erosion and sedimentation, and to otherwise prevent pollution of wetlands and other waters of the State. For purposes of the license, "pollution" means "pollution" as that term is defined by CGS section 22a-423. Best Management Practices include, but are not limited, to practices identified in the Connecticut Guidelines for Soil Erosion and Sediment Control as revised, 2004 Connecticut Stormwater Quality Manual, Department of Transportation's ConnDOT Drainage Manual as revised, and the Department of Transportation Standard Specifications as revised.
managed in a manner which prevents additional impacts to wetlands and watercourses.
Page 3 of6 General Conditions for L WRD Licenses
2 The Work Commencement condition and the need for a Work Commencement Form is not applicable to Flood Management Certification approvals.
22. Document Submission. Any document required to be submitted to the Commissioner under the license or any contact required to be made with the Commissioner shall, unless otherwise specified in writing by the Commissioner, be directed to:
DEEP.LWRDRegulatory@ct.gov or
21. License Transfer. The license is not transferable without prior written authorization of the Commissioner. A request to transfer a license shall be submitted in writing and shall describe the proposed transfer and the reason for such transfer. The Licensee's obligations under the license shall not be affected by the passage of title to the license site to any other person or municipality until such time as a transfer is approved by the Commissioner.
20. No Work After License Expiration. Work conducted after the license expiration date is a violation of the license and may subject the licensee to enforcement action, including penalties, as provided by law.
19. Maintenance. The Licensee shall maintain all authorized structures or work in optimal condition or shall remove such structures or facility and restore the affected waters to their pre work condition. Any such maintenance or removal activity shall be conducted in accordance with applicable law and any additional approvals required by law.
18. Compliance Certification 2. Not later than 90 days after completion of the authorized work, the Licensee shall prepare and submit to DEEP.LWRDRegulatory@ct.gov, the attached Compliance Certification Form. Such Compliance Certification shall be completed, signed, and sealed by the Licensee and a Connecticut Licensed Design Professional. If non compliance is indicated on the form, or the Commissioner has reason to believe the activities and/or structures were conducted in non-compliance with the license, the Commissioner may require the Licensee to submit as-built plans as a condition of this license.
17. Extension Request. The Licensee may request an extension of the license expiration date.
Such request shall be in writing and shall be submitted to DEEP.LWRDRegulatory@ct.gov at least thirty (30) days prior to the license expiration. Such request shall describe the work done to date, what work still needs to be completed, and the reason for such extension. The Commissioner may extend the expiration date of this license for a period of up to one year, in order for the Licensee to complete the authorized activities. It shall be at the Commissioner's sole discretion to grant or deny such request. No more than three (3) one-year extensions will be granted under this license.
to any authorized structure, facility, or activity. A de minimis alteration means a change in the authorized design, construction or operation that individually and cumulatively has minimal additional environmental impact and does not substantively alter the project as authorized.
• For diversion activities authorized pursuant to 22a-377(c)-2 of the Regulations of Connecticut State Agencies, a de minimis alteration means an alteration which does not significantly increase the quantity of water diverted or significantly change the capacity to divert water.
Page 4 of6 General Conditions for L WRD Licenses
27. Reporting of Violations. In the event that the Licensee becomes aware that they did not or may not comply, or did not or may not comply on time, with any provision of this license or
26. Limits of Liability. In granting the license, the Commissioner has relied on all representations of the Licensee, including information and data provided in support of the Licensee's application. Neither the Licensee's representations nor the issuance of the license shall constitute an assurance by the Commissioner as to the structural integrity, the engineering feasibility or the efficacy of such design.
25. Accuracy of Documentation. In evaluating the application for the license, the Commissioner has relied on information and data provided by the Licensee and on the Licensee's representations concerning site conditions, design specifications and the proposed work, including but not limited to representations concerning the commercial, public or private nature of the work or structures, the water-dependency of said work or structures, its availability for access by the general public, and the ownership of regulated structures or filled areas. If such information proves to be false, deceptive, incomplete or inaccurate, the license may be modified, suspended or revoked, and any unauthorized activities may be subject to enforcement action.
24. Certification of Documents. Any document, including but not limited to any notice, which is required to be submitted to the Commissioner under the license shall be signed by the Licensee and by the individual or individuals responsible for actually preparing such document, each of whom shall certify in writing as follows: "I have personally examined and am familiar with the information submitted in this document and all attachments and certify that based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief, and I understand that any false statement made in this document or its attachments may be punishable as a criminal offense."
23. Date of Document Submission. The date of submission to the Commissioner of any document required by the license shall be the date such document is received by the Commissioner. The date of any notice by the Commissioner under the license, including but not limited to notice of approval or disapproval of any document or other action, shall be the date such notice is personally delivered or the date three (3) days after it is mailed by the Commissioner, whichever is earlier. Except as otherwise specified in the license, the word "day" as used in the license means calendar day. Any document or action which is required by the license to be submitted or performed by a date which falls on a Saturday, Sunday or a Connecticut or federal holiday shall be submitted or performed on or before the next day which is not a Saturday, Sunday, or a Connecticut or federal holiday.
Regulatory Section Land & Water Resources Division Department of Energy and Environmental Protection 79 Elm Street Hartford, Connecticut 06106-512 7 860-424-3019
Page 5 of6 General Conditions for L WRD Licenses
31. Condition Conflicts. In the case where a project specific special condition listed on the license differs from, or conflicts with, one of the general conditions listed herein, the project specific special condition language shall prevail. It is the licensee's responsibility to contact the agency contact person listed on the license for clarification if needed prior to conducting any further regulated activities.
30. Rights. The license is subject to and does not derogate any present or future property rights or powers of the State of Connecticut, and conveys no property rights in real estate or material nor any exclusive privileges, and is further subject to any and all public and private rights and to any federal, state or local laws or regulations pertinent to the property or activity affected hereby.
29. Other Required Approvals. License issuance does not relieve the Licensee of their obligations to obtain any other approvals required by applicable federal, state and local law.
28. Revocation/Suspension/Modification. The license may be revoked, suspended, or modified in accordance with applicable law.
If the violation occurs outside of normal business hours, the Licensee shall contact the Department of Energy and Environmental Protection Emergency Dispatch at 860-424-3333.
The Licensee shall comply with any dates which may be approved in writing by the Commissioner.
of any document incorporated into the license, the Licensee shall immediately notify the agency contact specified within the license and shall take all reasonable steps to ensure that any noncompliance or delay is avoided or, if unavoidable, is minimized to the greatest extent possible. In so notifying the agency contact, the Licensee shall provide, for the agency's review and written approval, a report including the following information:
a. the provision(s) of the license that has been violated;
b. the date and time the violation(s) was first observed and by whom;
c. the cause of the violation(s), if known;
d. if the violation(s) has ceased, the duration of the violation(s) and the exact date(s) and times(s) it was corrected;
e. if the violation(s) has not ceased, the anticipated date when it will be corrected;
f. steps taken and steps planned to prevent a reoccurrence of the violation(s) and the date(s) such steps were implemented or will be implemented; and
g. the signatures of the Licensee and of the individual( s) responsible for actually preparing such report.
Page 6 of6 General Conditions for L WRD Licenses
860.424.3000
*The Licensee shall file the Land Record Filing on the land records of the municipality in which the subject property is located not later than thirty (30) days after license issuance pursuant to Connecticut General Statutes (CGS) Section 22a- 363g. A copy of the Notice with a stamp or other such proof of filing with the municipality shall be submitted to the Commissioner no later than sixty (60) days after license issuance.
Laild & \llater Resourees Divisioll 8tate of Colllleetieut Departmellt of Energy & EllVironrneBtal Proteetioll 79 Elm 8treet Hartford, CT 06106 5127
Return to:
If you have any questions pertaining to this matter, please contact the Land & Water Resources Division at 860-424-3019.
LieeBse # Suhieet:
NOTE: Due to the electronic delivery of this license and the legal requirement to have a live signature on this document, the "Land Record Filing" as detailed in General Condition #1 will be sent to the Licensee via U.S. Mail for the Licensee to file with the city/town clerk.
Signature and
To: DO NOT FILE
Land Record Filing*
~ft. Connecticut L~ Department of Energy & c:;_:_p Environmental Protection
5-5-2025 JOB NO. 24-034 SHEET 1 OF 8
THE POINT, LLC & TOWN OF OLD SAYBROOK
145 & LOT #42-2 COLLEGE STREET
OLD SAYBROOK, CONNECTICUT
TITLE SHEET
BULKHEAD REPAIR & WALKWAY PROJECT
,---------COASTAL JURISDICTION LINE (CJL) =EL +2.9'
----MEAN HIGH WATER (MHW) =EL +1.3' ~t
--~----.,....---- NAVD88- PROJECT DATUM ~1
......_ __ MEAN LOW WATER (MLW) =EL -1.9'
GENERAL NOTES
1. THESE DRAWINGS WERE PREPARED FROM RECORDED RESEARCH, FIELD
OBSERVATIONS, DRAWINGS NOTED HEREON, AND OTHER SOURCES.
2. THESE DRAWINGS ARE FOR PLANNING AND PERMITTING PURPOSES ONLY AND NOT
INTENDED FOR STRUCTURAL DESIGN, BID DOCUMENTS, OR CONSTRUCTION.
3. THE FEMA FLOOD LINES ARE DIGITIZED FROM A REFERENCE MAP NOTED HEREON,
SHOWN TO SATISFY PERMIT REQUIREMENTS, AND NOT INTENDED FOR INSURANCE
OR ELEVATION CERTIFICATE PURPOSES. BASE FLOOD ELEVATIONS ARE IN NAVD88.
4. SITE MAY BE SUBJECT TO AND/OR TOGETHER WITH CERTAIN LITTORAL, RIPARIAN,
OR OTHER RIGHTS AS PER THE RECORD MAY APPEAR. ANY UNDERGROUND AND/OR
UNDERWATER UTILITY, STRUCTURE, AND FACILITY LOCATIONS DEPICTED AND/OR
NOTED HEREON MAY HAVE BEEN COMPILED, IN PART, FROM RECORD MAPPING
SUPPLIED BY THE RESPECTIVE UTILITY COMPANIES OR GOVERNMENTAL AGENCIES,
FROM PAROLE TESTIMONY AND FROM OTHER SOURCES. THESE LOCATIONS MUST
BE CONSIDERED AS APPROXIMATE IN NATURE. ADDITIONALLY, OTHER SUCH
FEATURES MAY EXIST ON THE SITE, THE LOCATIONS OF WHICH ARE UNKNOWN TO
COASTLINE CONSULTING & DEVELOPMENT, LLC. THE SIZE, LOCATION AND
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY
THE APPROPRIATE AUTHORITIES PRIOR TO ANY CONSTRUCTION. CALL BEFORE YOU ..---------------------------------~ DIG: 1-800-922-4455· Coastline Consulting & Development
TIDAL DATUM PLANE 57-B East Industrial Road, Branford, CT 06405
(203) 433-4486
PROJECT NOTES
1. REFERENCE IS MADE TO THE FOLLOWING:
A. "TOPOGRAPHIC SURVEY & HYDROGRAPHIC SURVEY, THE POINT, LLC & TOWN OF
OLD SAYBROOK PROPERTY, 145 & LOT 42-2 COLLEGE STREET, OLD SAYBROOK,
CONNECTICUT", DATED MAY 20, 2024, SCALE 1" = 30' AND PREPARED BY
COASTLINE CONSUL TING & DEVELOPMENT, LLC (TIMOTHY MCCARTHY CERTIFIED
HYDROGRAPHER, Cert No. 296) AND CERTIFIED TO CLASS T-2 STANDARDS OF
ACCURACY BY JAMES NAGLE, L.S., LIC. NO. 15195 (EXCLUSIVE OF SOUNDINGS).
2. BENCHMARK, TIDE LINES, UPLAND ELEVATIONS ARE REFERENCED TO THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD88). THE CJL (COASTAL JURISDICTION
LINE) ELEVATION OF 2.9' NAVD88 IS THE VALUE FOR OLD SAYBROOK, CT AS
ESTABLISHED BY THE CONNECTICUT DEPARTMENT OF ENERGY & ENVIRONMENTAL
PROTECTION.
DRAWING LIST
SHEET NO. SHEET TITLE ORIGINAL DATE REVISION DATE NOTES
1OF8 TITLE SHEET 5-5-2025
2 OF 8 USGS TOPOGRAPHIC QUADRANGLE MAP 5-5-2025
3 OF 8 GEOGRAPHIC INFORMATION SYSTEM MAP 5-5-2025
4 OF 8 EXISTING CONDITIONS PLAN 5-5-2025
5 OF 8 PROPOSED CONDITIONS PLAN 5-5-2025
6 OF 8 ELEVATION A 5-5-2025
7 OF 8 ELEVATION B 5-5-2025
8 OF 8 ELEVATION C 5-5-2025
BULKHEAD REPAIR & PEDESTRIAN WALKWAY PROJECT
145 & LOT #42-2 COLLEGE STREET, OLD SAYBROOK, CONNECTICUT
145 & LOT #42-2 COLLEGE STREET
NOTE: MAP TAKEN FROM TOPO, INC., 7.5 MINUTE USGS OLD SAYBROOK, CONNECTICUT
TOPOGRAPHIC MAPS OF THE OLD SAYBROOK, CONNECTICUT, .... ----------.------1
QUADRANGLE, 1960 (PHOTO INSPECTED 1976, PHOTO REVISED 1984). 5-5-2025 SCALE: 1 = 24,000 SHEET 2 OF 8
USGS TOPOGRAPHIC QUADRANGLE MAP
BULKHEAD REPAIR & WALKWAY PROJECT
Coastline Consulting & Development 57-B East Industrial Road, Branford, CT 06405
(203) 433-4486
Cove \ \\6
~SITE
Po
Pcvert.)'
South, Cove
'i.
5-5-2025 SCALE: 1" = 200' SHEET 3 OF 8 MAP TAKEN FROM OLD SAYBROOK, CT GIS MAPPING
200'
THE POINT, LLC & TOWN OF OLD SAYBROOK
145 & LOT #42-2 COLLEGE STREET
OLD SAYBROOK, CONNECTICUT
400' 0
GEOGRAPHIC INFORMA T/ON SYSTEM MAP
BULKHEAD REPAIR & WALKWAY PROJECT
Coastline Consulting & Development 57-B East Industrial Road, Branford, CT 06405
(203) 433-4486
ADJACENT WATERSIDE PROPERTY OWNERS
MAP# LOT# PROPERTY OWNER PROPERTY ADDRESS MAILING ADDRESS
OLD SAYBROOK 115 COLLEGE ST 302 MAIN ST 24 41 TOWN OF OLD SAYBROOK, CT 06475 OLD SAYBROOK, CT 06475
OLD SAYBROOK 155 COLLEGE ST 302 MAIN ST
24 42 TOWN OF OLD SAYBROOK, CT 06475 OLD SAYBROOK, CT 06475
CONNECTICUT
RIVER
SITE
SCALE: 1" = 80' SHEET 4 OF 8 5-5-2025
160' 80' 0
THE POINT, LLC & TOWN OF OLD SAYBROOK
145 & LOT #42-2 COLLEGE STREET
OLD SAYBROOK, CONNECTICUT
-17 0
-173 -16 1
-16 1 -15. 9
-17 4
-16. 9
-24 3
-23 8 -23 6
-220 -23 0
-21 5 -19 6
-18 7 -20 1
-17 9 -19 8
-17 7 -16. 0
-24 4 -24 3
-24 9
-24 3
-24 7 -24 2
-250
-24 3
-24 0
-240 -24 3
-241 l w >-- -c z o_ D:'.<'>
0°' oo o s w~ Z:;;
<l:w --'>-- n, (f) w >-
(f)
-23 7
-24 2
EXISTING CONDITIONS PLAN
BULKHEAD REPAIR & WALKWAY PROJECT
Coastline Consulting & Development 57-B East Industrial Road, Branford, CT 06405
(203) 433-4486
-14 7
-7 1 N!F
TOWN OF OLD SAYBROOK
155 COLLEGE STREET
-5 1
77 TOP
5.3
-131
TOP
4.6
-- APPROXIMATE -- 44
RETAIN PRE-1995 STONE BULKHEAD
I
I POLE
I I
MIW oM"~~O~~~~ \, \
MHW ~MEAN HIGH WATER
CJL ~COASTAL JURISDICTION LINE I I
HTL ~ HIGH TIDE LINE I
-4.2 ~SOUNDING \
8.9 ~SPOT ELEVATION \
N/F ~NOW/FORMERLY
TYP ~ TYPICAL
IP ~ IRON PIPE
-124
BITUMINOUS/
/ PARKING
FIXED PIER
PERMIT #2938
I I
-15 3
~' -10 9
PROPERTY OF
THE POINT, LLC
145 COLLEGE STREET
EDGE OF PAVEMENT
(TYP)
-10 8
GREEN/
/SPACE
• ·1 .I \ -22 7
• ~. \~/DETERIORATED
6 •\ FIXED
•• • PIER _,00
0 ·\ . •)
I
• 1 -98 -160 -178
~I: ~TIMBER
l_i . 1 PILE (TYP) 5\ i . 1
J I I I • ~
i. ' \L._J
I rn\J> J> -0 (/) -0 rn ;u go rn >< Z --1g c~ ii\ rn
RETAIN PRE-1995 TIMBER
DECK
TOP EL. 4.9
-4 3
-13 9 -7 0 -219
TOP
7.5
-5.3 FEMA ZONE VE/
EL. 15
FULL EXTENT
OF MAP
-19 5
1995 RIPRAP -3 9
(TYP)
-24 7
N!F fr TOWN OF OLD SAYBROOK
115 COLLEGE STREET
-22 0
-11 9 ~%Q, RETAIN PRE- <l>~\., -17 2 -243
-9 0
RETAIN PRE-1995
STONE BULKHEAD W/
PROPERTY OF CONCRETE WALL
TOWN OF OLD SAYBROOK ATOP
-20 0
-243 -3.2
GREEN/
/SPACE
-19. 7 -242 -3 5 -3 4 -6 9
-19 3 -4 9
CJL/HTL (2.9) &
MHW (1.3) ALONG
FACE OF
BULKHEAD
-4.1
Spartina patens/. \ ... · ·
(TYP) .· ..
(>,Yl:./~J 8" l2l PVC PIPE~TAIN Rl:~p 4 8
'~"'o'' \ ('Y')
]\'O 0 -0 ri\\~
~' I
I COLLEGE STREET LOT #42-2
-8.9 -23 1 -5 9 -9 0 -20 4
-23. 7 -7 9 -22 7 -84 -116
-14 7 -23 5 -5 6 -7 8
-6 5 -242 -82
-204 -23 7 -7.7
-4 4 -6.4 -9 9 -24 3
-5 7 -224 -7 8 -23 6
-4 3 -5.8 -82 -24 1 -48
-4 8 -5 9 -24 6 -5 0
-4 1 -19 2 -4.3 -241
_.) -8 3 -4 6 -246 -3.5
-4.3
-104
-23 0
-243
-240
-241
-24 2
-23 8
-24 0
-24 3 -23.6 w ~ z o_ Cl'.<'> 0 00 QO o s w~ Z:;;
:'.5~ (L (J) w >- ~Cl)
(J)
SCALE: 1" = 80' SHEET 5 OF 8 5-5-2025
160'
THE POINT, LLC & TOWN OF OLD SAYBROOK
145 & LOT #42-2 COLLEGE STREET
OLD SAYBROOK, CONNECTICUT
PROPOSED CONDITIONS PLAN
BULKHEAD REPAIR & WALKWAY PROJECT
I I
I I
I I
I I
TOP
5.3
Coastline Consulting & Development 57-B East Industrial Road, Branford, CT 06405
(203) 4334486
CJL/HTL (2.9), MHW (1.3) & MLW (-1.9)
ALONG FACE OF BULKHEAD ~
BITUMINOUS/
/PARKING
PROPERTY OF
THE POINT, LLC
145 COLLEGE STREET
EDGE OF PAVEMENT
(TYP)
-17 4
. l -10 8
I -21 5 t -19 6
• 1 -17 8
-9 8 l I -20 1 -21 6
-~r 1 -18 7
J__. I BULKHEAD REPAIR
1' 1 SECTION C -19.8 I J i 165 LINEAR FEET
1 i 1l~J -10 9 -160 -17. 7
-4.7 _ __I -14 3
-16. 9 -19 5
-17 4 -124 -15. 9
-16 1
-178
-104
TOP
4.6 -161
-13 1 -17 3
-17 0 -5 1 -7 1 -178
-20 0 -22 0 rn\:.- :» -0 (/) -0 rn ;o go m >< Z --1;:: c~ Iii rn
PROPOSE RESTACKING
OF STONES
SECTION B
ADD 10% NEW STONE
51 LINEAR FEET
PROPOSE REBUILD
PRE-1995 TIMBER DECK
IN KIND '-\ ~'
.\ . 1->
-24 4
-24 3 -5.3 FEMA ZONE VE /
EL. 15 __/
/ FULL EXTENT
/ OF MAP
-9.2 GREEN/
/SPACE
TOP
EL. 4.5
-24 9
-219 -13 9
-4 3
-19 5 -243 -3 9 -24 7 -3.6 -11. 9 -0.6
-24 7 -22 0
-25 0
-17.2 -3 5 RECONSTRUCT STONE BULKHEAD
REPLACE CONCRETE WALL IN KIND
TOP EL. 7.5 --- ~-------- ----------
-24 3 -9 0
-2.9
-243
-20. 0 -4.1 CJL/HTL (2.9) & MHW (1.3)
ALONG FACE OF BULKHEAD
-3.2 -24 3 -6.7 -3.7 -240 -19. 7
-242 -6 9
-241
-19.3 BULKHEAD REPAIR
SECTION A
369 LINEAR FEET
-24 2 -3 5 -24 6 > PROPERTY OF
TOWN OF OLD
SAYBROOK
COLLEGE STREET
LOT #42-2
-8 3 -241
-19 2 -23 9
-246 10'WIDE
PEDESTRIAN ACCESS
CONCRETE WALKWAY
TOP EL. 5.3
-24 1 -8 2 -4 3
-23 6 -7.8 -5 7 -224 \
-1'6
-9.9 -6.4 -4.4 -24 3 -7 7
80' 0
-23.7 -20 4 -8 2
-13 0 -234 -223 -8.9 -23 1
-23. 7 -216
-8.4 -11 6 -22 7
-14 7 -23 5 -78 -24 2 -226
MLW ~MEAN LOW WATER
MHW ~MEAN HIGH WATER
CJL ~COASTAL JURISDICTION LINE
HTL ~HIGH TIDE LINE
-4.2 ~ SOUNDING
8.9 ~SPOT ELEVATION
N/F ~ NOW/FORMERLY
TYP ~TYPICAL
IP ~IRON PIPE
LEGEND
N!F
TOWN OF OLD
SAYBROOK
115 COLLEGE STREET
;ol:» 0 -0 -0 -0 rn\;o ;o 0 ~\~ c~ Iii m
I I h-i I
I I
-01:.- ~.il -o~;o rn o ~'/$ -< g Cl~ z1rn rn\
I I
I I
I I
I ,, I I
I I
CJLfHTL;2_9,, •
8" 0 PVC PIPE'',,\\
INVERT=27~ / I <, 1
SCALE: 1" = 6' SHEET 6 OF 8 5-5-2025
145 & LOT #42-2 COLLEGE STREET
OLD SAYBROOK, CONNECTICUT
6' 0
ELEVATION A
BULKHEAD REPAIR & WALKWAY PROJECT
Coastline Consulting & Development 57-B East Industrial Road, Branford, CT 06405
(203) 4334486
12'
CRUSHED BEDDING STONE
APPROX. 125 cy
CONCRETE BACKFILL BEHIND BULKHEAD
APPROX. 175 cy
HEAVY DUTY FILTER FABRIC
(GEOTEXTLIE)
APPROX. 245 cy
MLW = -1.9
CJL/HTL = 2.9
RECONSTRUCT PRE-1995
STONE BULKHEAD
TOP EL 4.5'
APPROXIMATE LIMIT
OF TEMPORARY
EXCAVATION (TYP)
GRADE AS NECESSARY
REPLACE PRE-1995
CONCRETE WALL IN-KIND
TOP EL 7.5
10'
PEDESTRIAN
ACCESS
CONCRETE
WALKWAY
TOP EL 5.3'
0 EXISITING ELEVATION Ar-----.-~~~~ Scale: 1" = 6'
MLW = -1.9
MHW= 1.3
CJL/HTL = 2.9
PRE-1995 STONE BULKHEAD
TOP EL 4.2'±
CONCRETE
WALKWAY
TOP EL 7.5'±
PRE-1995 CONCRETE
WALL
MHW= 1.3
SCALE: 1" = 10' SHEET 7 OF 8 5-5-2025
20' 10'
THE POINT, LLC & TOWN OF OLD SAYBROOK
145 & LOT #42-2 COLLEGE STREET
OLD SAYBROOK, CONNECTICUT
ELEVATION B
BULKHEAD REPAIR & WALKWAY PROJECT
Coastline Consulting & Development 57-B East Industrial Road, Branford, CT 06405
(203) 4334486
TIMBER
PILE (TYP) ® PROPOSED ELEVATION B~~~~~
Scale: 1" = 10'
MLW = -1.9
MHW= 1.3
~CJ1fHTI- = 2 9
PROPOSED REBUILD PRE-1995
TIMBER DECK IN KIND
TOP EL 5.3'
PROPOSED RESTACK
PRE-1995 STONES
-ADD 10% NEW STONE
APPROX. 8 cy GRADE AS NECESSARY
TIMBER
PILE (TYP)
® EXISITING ELEVATION B~~~~~
Scale: 1" = 10'
PRE-1995 STONES (TYP)
MLW=-1.9
MHW= 1.3
CJL/HTL = 2.9
PRE-1995 TIMBER
DECK TOP EL 4.9'
CONCRETE FOOTING
TOP EL 4.4+/-
SCALE: 1" = 6' SHEET 8 OF 8 5-5-2025
145 & LOT #42-2 COLLEGE STREET
OLD SAYBROOK, CONNECTICUT
6' 0
ELEVATION C
BULKHEAD REPAIR & WALKWAY PROJECT
Coastline Consulting & Development 57-B East Industrial Road, Branford, CT 06405
(203) 4334486
12'
(r"j PROPOSED ELEVATION ~j Scale: 1" = 6'
CRUSHED BEDDING
APPROX. 55 cy
CONCRETE BACKFILL
BEHIND BULKHEAD
APPROX 78 cy
HEAVY DUTY FILTER FABRIC
(GEOTEXTLIE)
APPROX. 11 a cy
MLW=-1.9
TEMPORARY SILT FENCE
MHW= 1.3 - - - - - - - - - - - - - - - - - - - - - -
CJL/HTL = 2.9
RECONSTRUCT
PRE- 1995 STONE BULKHEAD
TOP EL. 4.5'
APPROXIMATE LIMIT
OF TEMPORARY
EXCAVATION (TYP)
RAILING
10'
PEDESTRIAN
I CONCRETE ~
ACCESS WALKWAY
TOP EL. 5.3'
GRADE & PAVE AS
NECESSARY
r>. EXISITING ELEVATION ~~~~~~~~~~Sc~a~le:~1~"~=~6'
WASHOUT BEHIND BULKHEAD
PRE-1995 STONE BULKHEAD
TOP EL. 4.4'±
CONCRETE
WALKWAY
HISTORIC GRADE LINE
TOP EL. 5.1'±
860.424.3000
(Date) (Signature)
LICENSEE:
EXPECTED DATE OF COMPLETION OF WORK:
EXPECTED DATE OF COMMENCEMENT OF WORK:
Date Contractor(s) received a copy of the license and approved plans:
# 3 Name:
Address:
# 2 Name:
Address:
Telephone: _ E-mail:
CONTRACTOR(s):
# 1 Name:
Address:
Telephone: _ E-mail:
DEEP License No(s): --------------~
Municipality in which the project is occurring:
Licensee Name:
To: DEEP.LWRDRegulatory@ct.gov or Regulatory Section Department of Energy and Environmental Protection Land & Water Resources Division 79 Elm Street Hartford, CT 06106-5127
LWRD Work Commencement Form
~'It. Connecticut c:;_:_p Environmental Protection
860.424.3000
1. Licensee Name:
DEEP License Number(s):
Municipality in which project is occurring:
2. Check one:
(a) D "I certify that the final site conditions and I or structures are in general conformance with the approved site plans". Identify and describe any deviations and attach to this form.
(b) D "The final site conditions and I or structures are not in general conformance with the approved site plans. The enclosed "as-built" plans note the modifications".
3. "I understand that any false statement in this certification is punishable as a criminal offence under section 53a- 157b of the General Statutes and under any other applicable law."
Signature of Licensee Date
Name of Licensee (print or type)
Signature of CT-Licensed Design Professional Date
Name of CT-Licensed Design Professional (print or type)
Professional License Number (if applicable) Affix Stamp Here
• As-built plans shall include: elevations or tidal datums, as applicable, and structures, including any proposed elevation views and cross sections included in the approved license plans. Such as-built plans shall be the original ones and be signed and sealed by an engineer, surveyor or architect, as applicable, who is licensed in the State of Connecticut.
• The Licensee will be notified by staff of the Land and Water Resources Division (LWRD) if further compliance review is necessary. Lack of response by LWRD staff does not imply compliance.
Submit this completed form to :
DEEP.LWRDRegulatorj'.@ct.gov or Regulatory Section Department of Energy and Environmental Protection Land & Water Resources Division 79 Elm Street Hartford, CT 06106-5127
The following certification must be signed by the licensee working in consultation with a Connecticut-licensed design professional and must be submitted to the address indicated at the end of this form within ninety (90) days of completion of the authorized work.
Compliance Certification Form
~~ Connecticut ~-4 Department of Energy & ~-"? Environmental Protection
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .