SATPC0042906 Tab 07 2 SOW_Redacted.pdf
PDF 135 KB Posted
- Attached to
- NASA NIOC Engineering Services
- Solicitation number
- 80NSSC27945244Q
About this file
This is a Statement of Work for NASA's modernization of the NASA Integrated Operations Center (NIOC) to enhance enterprise-level capabilities for network and security operations.
The contractor shall develop a scalable, secure, and efficient architecture supporting mission-critical operations aligned with NASA OCIO's modernization goals. The work encompasses 420 hours across five tasks: (1) Current-State Assessment for Workplace & Collaboration Services; (2) Current-State Assessment for Cloud & Computing Services; (3) Current-State Assessment for Application & Platform Services; (4) Development of Future-State Integrated NIOC Architecture and Modernization Roadmap; and (5) Phase 1 Initial Implementation, Demonstration, and Final Report. Tasks 1-3 require assessment of current operations, infrastructure, tooling, workflows, and visibility to identify gaps inhibiting coordinated operations and timely response, with deliverables being current-state assessment summaries including gap analyses and prioritized findings. Task 4 requires development of a modern integrated NIOC architecture and modernization roadmap addressing integrated tooling, monitoring enhancements, predictive/behavioral analytics, automation, scalability, and lessons learned. Task 5 requires leading implementation efforts for initial modernization capabilities, introducing automation for routine tasks and alerts, deploying or enhancing monitoring and analytics, preparing and executing a demonstration, defining expansion approaches, and providing a final report and briefing. All task due dates are to be determined. The period of performance is April 15, 2026 through April 14, 2027. Work shall be performed onsite at Marshall Space Flight Center, Huntsville, Alabama, with some travel required. NASA will furnish current state policies, procedures, drawings, diagrams, facility access, personnel access, and Government Furnished Equipment as necessary.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
NASA seeks to modernize and provide future state roadmap for the NASA Integrated
Operations Center (NIOC) to enhance enterprise-level capabilities for network and security operations. The objective is to implement a scalable, secure, and efficient architecture that supports mission-critical operations and aligns with NASA OCIO’s modernization goals.
2. Characteristics, Scope, and Specs
Description Hours
MITRE Task Order Work Plan 420
Task 1: Current-State Assessment (Workplace & Collaboration Services)
Key Activities
Assess current WCS operations and infrastructure;
document existing tooling, workflows, and visibility into networks/systems/threats; identify gaps inhibiting coordinated operations and timely response.
Key Deliverables Current-state assessment summary, including gap analysis and prioritized findings.
Due Date TBD
Task 2: Current-State Assessment (Cloud & Computing Services)
Assess current CCS operations and infrastructure;
document existing tooling, workflows, and visibility into networks/systems/threats; identify gaps inhibiting coordinated operations and timely response.
Key Deliverables Current-state assessment summary, including gap
Task 3: Current-State Assessment (Application & Platform Services)
Assess current APS operations and infrastructure;
document existing tooling, workflows, and visibility into networks/systems/threats; identify gaps inhibiting coordinated operations and timely response.
Current-state assessment summary, including gap
Task 4: Future-State Integrated NIOC Architecture + Modernization Roadmap
Develop modern integrated NIOC architecture and modernization roadmap addressing integrated tooling, monitoring enhancements, predictive/behavioral analytics, automation, scalability, and reach-back lessons learned.
Future-state NIOC architecture package and modernization roadmap.
Task 5: Phase 1 Initial Implementation + Demonstration and Final Report
· Lead implementation efforts for initial modernization capabilities; introduce automation for routine tasks/alerts; deploy or enhance monitoring/analytics;
prepare and execute demonstration.
· Define expansion approach beyond initial phase.
· Final report and briefing
Key Deliverables Phase 1 implementation results and demonstration outcomes (including success criteria results).
3. Government Furnished Equipment and/or Information
NASA will provide:
• Current state policies, procedures, drawings, diagrams, etc., for project baseline.
• Access to all facilities required for investigation.
• Access to personnel as needed for project performance.
• Access to GFE as deemed necessary.
• Work Location: Onsite at Marshall Space Flight Center, Huntsville, AL.
• Travel: Some travel required.
4. Period of Performance
04/15/2026 - 04/14/2027
5. NASA Technical Point of Contact
6. Place of Performance
Marshall Space Flight Center
4200 Rideout Road
Huntsville, AL 35803
File details come from the government source that posted it. Updated .