SATPC0042804 Tab 07 SOW PRINTED.pdf
PDF 137 KB Posted
- Attached to
- ION GUN REPLACEMENT
- Solicitation number
- 80NSSC269444272Q
About this file
This is a Statement of Work for the procurement of a replacement ion gun and controller system for an existing vacuum chamber.
The primary objective is to acquire an ion gun with identical capabilities to a previously damaged unit to enable testing and calibration of charged particle instrumentation. The ion gun and controller must produce ion beams with energies ranging from 30 volts to 20 kilovolts, provide adjustable beam flux capability, and be compatible with the existing vacuum chamber mounting configuration. The work will be performed at the contractor's facility with a performance period beginning approximately September 1, 2026, and extending 12 weeks from order receipt to delivery by approximately December 1, 2026. This timeline is critical as the charged particle instruments requiring this test capability must be delivered for flight missions within six months of the statement of work date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1 Objective:
We need to replace an ion gun on the vacuum chamber system that was damaged in moving. This ion gun has the same capabilities and specifications as the old ion gun. We need to have an ion gun on this chamber to be able to test and calibrate our charged particle instrumentation. We are currently working on several instruments that would need to be tested using this ion gun source. These must be delivered for flights in the next 6 months.
2 Characteristics and Specs
This gun and controller need to be able to:
- Produce an ion beam with energies from 30 V to 20 KV.
- Have the ability to vary the beam flux.
- It needs to be able to mount onto our existing vacuum chamber.
3. Place of Performance
The work shall be performed at the contractor's facility
4. Period of Performance
The period of performance will be from when the order is placed approximately (01 September 2026) until delivery 12 weeks after they receive the order, approximately 01 December 2026.