SATPC0042750 Tab 04 4 SOW.pdf
PDF 115 KB Posted
- Attached to
- HSDI Art-IV Phantom S980 Camera System
- Solicitation number
- 80NSSC26943906Q
About this file
This is a Statement of Work outlining procurement requirements for imaging and optical transmission equipment to be delivered to Kennedy Space Center (KSC). The purchase consists of four line items totaling specialized camera and networking components: one PHANTOM S980 camera with 8.3 megapixel resolution and dual optical fiber ports in RF-mount configuration; two CoaXPress-over-fiber frame grabbers manufactured by Euresys compatible with PHANTOM S980 and S991 cameras; four Cisco 40GBASE-SR4 QSFP+ optical transceivers operating at 850nm with 150-meter range for PHANTOM S991 systems; and two multimode optical cables with 12 fibers rated for 3 meters (10 feet) in length for PHANTOM S991 and S641 compatibility.
The period of performance is 30 days from Award and Receipt of Order (ARO), with all work to be performed at Kennedy Space Center. The statement specifies exact part numbers and technical specifications for each line item, indicating this is a direct procurement for specialized high-speed imaging and fiber optic transmission infrastructure rather than a competitive solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0042750 Tab 10 Open Market RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete this purchase.
2. Characteristics, Scope, and Specs
LINE PART NO. DESCRIPTION QTY.
1 VRI-S980-C-RF PHANTOM, S980 CAMERA, 8.3MPX, W/
DUAL OPTICAL FIBER PORTS, COLOR,
RF-MOUNT
2 VRI-MVF-FG-
EURESYSFIBER-COF
COAXPRESS-OVER-FIBER FRAME
GRABBER, EURESYS, FOR PHANTOM S980
& S991
3 VRI-MVF-QSFP-SR4-40G CISCO 40GBASE-SR4 QSFP+ 850NM 150M
OPTICAL TRANSCEIVER FOR PHANTOM
S991
4 VRI-MVF-MMODE-CBL-3M CABLE, MULTIMODE, 12 FIBERS, FOR
PHANTOM S991 AND S641, 3M (10 FT)
3. Place of Performance
Kennedy Space Center (KSC)
4. Period of Performance
30 days ARO
File details come from the government source that posted it. Updated .