This is a Statement of Work for a peer review project managed by NASA's Johnson Space Center Toxicology Group. The contractor, SciPinion LLC, is required to coordinate an external peer-review panel and generate recommendations for updates to NASA's guidelines for establishing Spacecraft Maximum Allowable Concentrations (SMACs) and Spacecraft Water Exposure Guidance (SWEGs), which govern safety standards for air and water quality in spaceflight environments.

The project is structured in two phases with specific deliverables and timelines. Phase I, due within 6 months of contract initiation, requires the contractor to coordinate a peer-review panel to assess current JSC Toxicology guidelines and policies. Phase II, due within 9 months of contract initiation, requires delivery of a comprehensive report to NASA containing specific reviewer recommendations for updates or modifications, including concrete examples and references to alternative approaches. Work performance is designated at SciPinion LLC's headquarters in Bozeman, Montana, with the contract period running from October 1, 2026 through July 1, 2027.

View the file

Other files

File Type Posted
SATPC0042597 Tab 07 Capability Statement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Project Title: Peer review of NASA Guidelines for Establishing SMACs and SWEGs and Evaluation of JSC Toxicology Policies.

1. Objective/Requirements

a. NASA’s Toxicology Group at Johnson Space Center engages experts in toxicology and risk assessment every 10 years to review the guidelines by which NASA sets safety standards for air and water quality in spaceflight. We seek external peer review of our existing guidelines to determine their appropriateness and to recommend specific updates that may be needed to ensure rigorous and appropriate limits.

2. Characteristics, Scope, and Specs

a. The contractor shall perform the following duties, by phase.

i. Phase I – Within 6 months of contract initiation, coordinate a peer-review panel to assess current JSC Toxicology guidelines and policies

ii. Phase II – Within 9 months of contract initiation, generate a report to NASA providing specific reviewer recommendations for updates or modifications to include specific examples and references to approaches.

3. Place of Performance

a. The work shall be performed at the headquarters of SciPinion LLC in Bozeman, Montana.

4. Period of Performance

a. The work shall be performed October 1, 2026 through July 1, 2027.

File details come from the government source that posted it. Updated .