About this file

This is a Statement of Work for printing and installation services at Kennedy Space Center. The contracting agency requires a local vendor to print and install five wall-scale vinyl murals, including work around fixtures and over elevator doors, plus one acrylic NASA sign. All materials and inks must be 3M certified for quality assurance, and all printing must be performed on fully calibrated, up-to-date machines. The acrylic NASA sign must comply with NASA Agency branding standards.

The scope of work consists of four full-wall vinyl murals with 3M certified materials and printing, one elevator wall vinyl with 3M certified materials and printing, and one acrylic NASA sign. Performance will take place at Building K6-1096 ("OSB I") at Kennedy Space Center, with a performance period of August through September 2026. No specific pricing terms, response dates, or award dates are provided in this document.

View the file

Other files

File Type Posted
2026 OSB I VINYL Graphics Updates.pdf PDF
SATPC0042483 Tab 10 Open Market RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements We require a local vendor to be able to print and install 5 wall scale vinyl murals including around fixtures, and over elevator doors in one instance. All materials and inks must be 3M certified for top quality and perfomed on fully calibrated up-to-date machines. And one acrylic NASA sign in compliance with NASA Agency branding standards.

2. Characteristics, Scope, and Specs

Quantity OEM Part # Product Description 4 Full Wall Vinyl Murals 3M Certified Materials & Printing 1 Elevator Wall Vinyl 3M Certified Materials & Printing 1 Acrylic NASA Sign

3. Place of Performance

Building K6-1096 (“OSB I”), Kennedy Space Center

4. Period of Performance Aug-Sept 2026

File details come from the government source that posted it. Updated .