SATPC0042362 Tab 04 4 SOW.pdf

PDF 210 KB Posted

Attached to
Matsusada Precision High Voltage Amplifiers.
Solicitation number
80NSSC26941393Q
Issued by

About this file

This is a Statement of Work for the procurement of high voltage amplifiers to support NASA's Artemis missions. The contractor shall deliver two AMJ-4B10-L1 amplifiers and two HOPH-5B1-L1 amplifiers. These amplifiers will directly support the Electrodynamic Dust Shield (EDS) technology, which is included on several upcoming Artemis missions. The place of performance is Charlotte, NC, and the period of performance extends from contract award through October 30, 2026. The amplifiers must be delivered to NASA's John F. Kennedy Space Center, located at Space Commerce Way, Kennedy Space Center, FL 32899.

View the file

Other files

File Type Posted
SATPC0042362 Tab 07 Capability Statement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

These will be used for upcoming Artemis missions, as the Electrodynamic Dust Shield

(EDS) technology that these high voltage amplifiers will directly support are included on several upcoming missions

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

• 2 AMJ-4B10-L1 amplifiers

• 2 HOPH-5B1-L1 amplifiers

3. Place of Performance

Charlotte, NC

4. Period of Performance

Build and ship shall be performed contract award through October 30, 2026.

Deliver To:

NASAJohn F. Kennedy Space Center Space Commerce Way Kennedy Space Center, FL 32899

File details come from the government source that posted it. Updated .