SATPC0042344 Tab 04 4 SOW.pdf
PDF 331 KB Posted
- Attached to
- Mircrotek NDT-2000 Film Digitizing System Federal contract opportunity
- Solicitation number
- 80NSSC26941282Q
About this file
Statement of Work Summary
This Statement of Work specifies the procurement of one Microtek NDT-2000 Film Digitizing System (Part No. RT-MI-NDT-2000-P+AFF) for Kennedy Space Center. The system is a high-resolution film scanning device with the following specifications: 1200 dpi/21 µm resolution, 16-bit depth, and high dynamic range capable of detecting optical density changes between 0.5 to 4.5. The equipment includes an optional auto film feeder, supports film sizes from 14" to 200", features self-calibration technology for consistent image quality, and is designed to prevent dust and dirt accumulation for use in harsh environments.
The system is intended for aerospace, petrochemical, military, and industrial testing applications at Kennedy Space Center. The period of performance is 3-4 weeks after receipt of order (ARO). No pricing information, response deadlines, award dates, or contract vehicle type are specified in this document.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete this purchase.
2. Characteristics, Scope, and Specs
LINE PART NO. DESCRIPTION QTY.
1 RT-MI-NDT-
2000-P+AFF
Microtek NDT-2000 Film Digitizing System
High Resolution: 1200 dpi / 21 µm, 16 bit High Dynamic Range: Able to detect changes between 0.5 to 4.5 optical density Optional Auto Film Feeder enhances working efficiency Supports all film sizes from 14" to 200" Self-Calibration ensures consistent image quality Designed to prevent dust and dirt buildup, great for tough environments Designed for aerospace, petrochemical, military and other industrial testing applications
3. Place of Performance
Kennedy Space Center (KSC)
4. Period of Performance
3-4 weeks ARO
File details come from the government source that posted it. Updated .