SATPC0042251 Tab 04 4 SOW_Redacted.pdf
PDF 102 KB Posted
- Attached to
- AiTech Boards Federal contract opportunity
- Solicitation number
- 80NSSC26940927Q
About this file
This Statement of Work outlines NASA Johnson Space Center's procurement requirements for Ai Tech S910 Boards and related components. The procurement includes four line items: two Series 100 Development Unit S910 3U cPCI Radiation Hardened MIL-STD-1553B boards (part number 1S910-R04-00) featuring conduction cooling, Aitech standard screening, and four-channel redundant 1553B ports; two Rear Transition modules for the S910 (part number RTM-S910 200-0389-01); one BSP S910 1553 Driver (part number 1553-VXW-910); and one Hardware and Software Support package (part number SP-VXW-Suppor) providing 40 hours of off-site technical phone and email support from US time zones within the first year of order delivery, with travel costs additional and annual support or 40 hours whichever comes first.
The work is to be performed at NASA Johnson Space Center, Building 29, Room 213, Houston, Texas 77058, with a period of performance of 4 months after receipt of order (ARO). The Statement of Work specifies the technical characteristics and quantities required but does not include pricing information, response deadlines, award dates, or contract vehicle details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0042251 Tab 07 Capability Statement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The NASA Johnson Space Center (JSC) requires the procurement of Ai Tech S910
Boards.
2. Characteristics, Scope, and Specs
LINE PART NO. DESCRIPTION QTY.
1 1S910-R04-00 Series 100 Development Unit
S910 3U cPCI Radiation
Hardened MIL-STD-1553B, conduction cooled, Aitech standard screening, Four
Channel / Redundant 1553B ports (with S911), standard configuration.
2 RTM-S910
200-0389-01
Rear Transition module for the
S910
3 1553-VXW-910 BSP S910 1553 Driver 1
4 SP-VXW-Suppor Hardware and Software Support per project per year (40 hours of off-site technical phone/email support from US time zones within the first year of order delivery.) Travel is additional.
Annual or 40 hours, whichever comes first.
3. Place of Performance
NASA Johnson Space Center
Building # 29, Room #213
Houston, Texas 77058
4. Period of Performance
4 months ARO.
File details come from the government source that posted it. Updated .