SATPC0042122 TAB 07 SOW PRINTED.pdf
PDF 282 KB Posted
- Attached to
- Phantom camera to support TE achievement Federal contract opportunity
- Solicitation number
- 80NSSC26940233Q
About this file
This is a Statement of Work for a Firm-Fixed-Price (FFP) Supply Order issued by NASA Marshall Space Flight Center (MSFC), Engineering Directorate (ER64).
The contractor shall supply and deliver advanced high-speed digital imaging equipment for use in the Nuclear Thermal Rocket Element Environmental Simulator (NTREES) facility to support in-situ, non-destructive examination processes. The specific deliverables include: (1) one PHANTOM VEO 640L high-speed camera core system with 36GB mono memory (Product ID: VRI-VEO-640L36G-M); (2) one ultra-high-speed data interface option adding 10GB Ethernet capability to the camera (Product ID: VRI-VEO-10GOPT); (3) one ruggedized Pelican 1535 Air field storage and transit case with custom foam for camera equipment (Product ID: VRI-CASE1535-KT); and (4) shipping services. All equipment must arrive factory-new, fully assembled, tested, and ready for immediate network integration. Delivery shall be executed under FOB Destination protocols with the vendor retaining risk of loss or damage until formal delivery to NASA Marshall Space Flight Center, 4631 Saturn Road, Building 4631, Huntsville, AL 35812. The lead time for delivery is 2 to 4 weeks after receipt of order.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Contract Type: Firm-Fixed-Price (FFP) Supply Order Requiring Office: NASA Marshall Space Flight Center (MSFC), ER64
1.0 INTRODUCTION AND PURPOSE
The purpose of this Statement of Work is to define the exact vendor requirements for supplying and delivering advanced high-speed digital imaging equipment to the National Aeronautics and Space Administration’s (NASA) Marshall Space Flight Center. This equipment suite will be utilized in the Nuclear Thermal Rocket Element Environmental Simulator (NTREES) resulting in establishing rigorous in-situ, non-destructive examination processes for articles being tested in this facility.
2.0 SCOPE OF WORK
The Contractor/Vendor shall provide all necessary personnel, manufacturing materials, services, and technical management processes to deliver the complete, commercial hardware suite and technical warranties outlined below.
3.0 TECHNICAL REQUIREMENTS & DELIVERABLES
The Contractor shall deliver the specific item quantities and part numbers listed in the table below:
ITEM # PRODUCT ID DESCRIPTION QTY
3.1 VRI-VEO-640L-
36G-M
High-Speed Camera Core System:
PHANTOM VEO 640L, MONO 36GB MEMORY 1
3.2 VRI-VEO-10G-
OPT
Ultra-High-Speed Data Interface Option:
OPTION, ADD 10GB ETHERNET TO PHANTOM VEO AND
VEO4K CAMERAS
3.3 VRI-CASE-
1535-KT
Ruggedized Field Storage & Transit Unit:
KIT, CASE PELICAN 1535 AIR WITH CUSTOM FOAM FOR
KT AND VEO CAMERAS
3.4 --- SHIPPING 1
4.0 PERIOD & PLACE OF PERFORMANCE
Place of Performance: NASA Marshall Space Flight Center, Lead Time: 2 to 4 weeks After Receipt of Order (A.R.O.)
5.0 DELIVERY & QUALITY ASSURANCE
Shipping Method: Deliveries shall be executed strictly under FOB Destination protocols. The vendor retains risk of loss or damage until formal delivery.
Delivery Location: NASA Marshall Space Flight Center 4631 Saturn Rd. BLDG 4631, Huntsville, AL 35812.
Condition: All equipment must arrive factory-new, fully assembled, tested, and ready for immediate network integration.