This is a specification document for cryogenic valve rebuild kits from CPC Cryolab, detailing the technical requirements for a shutoff valve assembly and associated actuator system. The valve model CV8-832-OWPG1A-001-TW is a 4-inch butt weld connection shutoff valve constructed of 316L stainless steel in a globe body style with automatic actuation capability. The valve is engineered for cryogenic fluid applications and operates across a temperature range of -456 to 300°F at pressures from 0 to 300 psig, with a flow coefficient of 182 and quick open flow characteristics.

The rebuild kit incorporates specialized materials selected for cryogenic service, including a Kel-F seat material, graphite stem packing, ethylene propylene redundant seal, and glass-filled Teflon gasket material. The accompanying actuator model VALTEK-100FC-LS-SLD provides automatic operation of the valve assembly. The specification indicates a delivery lead time of 14 to 16 weeks following contract award, establishing the procurement timeline for this specialized equipment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification for CPC Cryolab Cryogenic Valve Rebuild Kits Valve Model # CV8-832-OWPG1A-001-TW

Actuator Model #VALTEK-100FC-LS-SLD

Series: CV8

Type: Shutoff Valve

Body Style: Globe

Body Material: 316L Stainless Steel

Actuation Type: Automatic

Stem Packing: Graphite

Connection Type: Butt Weld, Pipe

Connection Size: 4 in

Fluid Media Type: Cryogenic

Flow Characteristics: Quick Open

Operating Pressure: 0 to 300 psig

Operating Temperature: -456 to 300 ºF

Seat Material: Kel-F

Redundant Seal: Ethylene Propylene

Gasket Material: Glass Filled Teflon®

Flow Coefficient (Cv): 182

Lead-time for delivery is 14 to 16 weeks after contract award.