SATPC0042043 Tab 04 4 SOW.pdf
PDF 126 KB Posted
- Attached to
- Radiography System Federal contract opportunity
- Solicitation number
- 80NSSC26939561Q
About this file
This is a Statement of Work for the acquisition of a Waygate Technologies Radiography System for NASA Marshall Space Flight Center (MSFC). The requirement is for one CRxFlex II based Computed Radiography System or equal, which must meet or exceed performance standards defined in ASTM E2445, ASTM E2446, and ASTM E2002, with performance demonstrated for final acceptance. The system includes a high-performance desktop computer with dual monitors (SVGA and 3-megapixel high-resolution), Rhythm Insight Acquire Software, Rhythm Review Software with Flash Image Enhancement Tool, CRxFlex II Phosphor Scanner, CRxFlex Insert Cassette, and Rhythm Review Premium Tool with Reference Radiographs. The delivery package includes two days of installation and training or equivalent.
The desktop configuration specifies an HP Z4G5TWR model (PN A09BXUP) with 32GB RAM, 2TB storage, NVIDIA T1000 graphics card, Intel Xeon W3-2423 processor, and various peripherals including dual monitors, keyboard, mouse, and networking equipment. Additional components include 3-year onsite hardware support and 1-year priority access support. The place of performance is Building 4705, Room B200A at Marshall Space Flight Center, with Benjamin "Daniel" Barrentine identified as the NASA LPV NDE Lead contact. The period of performance is 2–4 weeks after receipt of order (ARO). The statement indicates that equal or substitute products and configurations are acceptable to meet the specified requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0042043 Tab 04 4 SOW.pdf | ||
| SATPC0042043 Tab 10 Open Market RFQ.pdf | ||
| SATPC0042043 Tab 10 Open Market RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
This requirement is for the acquisition of the Waygate Technologies Radiography System for NASA Marshall Space Flight Center (MSFC). The information listed below or equal is required to complete this purchase.
2. Characteristics, Scope, and Specs
System shall be capable of providing system performance equal to or greater than the requirements defined in ASTM E2445, ASTM E2446, and ASTM E2002 and must be demonstrated for final acceptance of the installation.
QTY DESCRIPTION
1 CRxFlex II based Computed Radiography System or equal Consisting of the following:
• High Performance Desktop Computer with SVGA Monitor and High Resolution 3 megapixel Monitor
• Rhythm Insight Acquire Software
• Rhythm Review Software with Flash Image Enhancement Tool
• CRxFlex II Phosphor Scanner
• CRxFlex Insert Cassette
• Rhythm Review Premium Tool: Reference Radiographs (ASTM Disks Not Included)
1 2 Day installation & Training or equal
Desktop:
PN DESCRIPTION
A09BXUP HP Z4G5TWR W32423 32GB/2TB PC
with the following configuration or equal:
2PA21AV HP miniDP-to-DP Adapter (2-pack)
4YQ39AV#ABA OSLOC
57K35AV BU HP Z4 TWR G5 775W EPA90 RCTO
57K59AV GFX NVIDIA T1000 8GB 4mDP 57K68AV HDD 2TB 7200RPM SATA Ent 3.5in 57K69AV HDD 2TB 7200RPM SATA Ent 3.5in
2nd 57K96AV Operating System Load to M.2 57L19AV SSD ZTrb 512GB 2280 PCIe-4x4 TLC
M.2
57L30AV#ABA CKIT Z4
57M48AV CPU INTL Xeon W3-2423 6C 110W 57M56AV Ethernet Ntwk Adptr I I225-T1 2.5GbE
57M63AV MISC Packaging Sgl UN (TWR) 57M64AV Mouse HP 320M WRD 57M71AV ODD 9.5 BD Writer 1st ODD
57M81AV OST W11P6 WK6
57M94AV RAM 32GB (2x16GB) DDR5 4800 ECC
57N04AV#ABA HP USB 320K KB US
6Q1F4AV Entry Mod Type-A SprSpd
USB5GbpsFrntIOv2
6Y5A1AV#ABA WARR 1/1/1 US
73M38AV 2x Type-A USB 3.1 Gen1 7L570AV#ABA DT PWRCORD C13 1.83m
15AstCNVTL US
7M3Q2AV LBL 1/1/1 TWR US
U61CCE HP 3y Onsite Care WS Hardware Support U9DL9E HP 1y PriorityAccessPlusPC 1K+ seats
SVC
3. Place of Performance
Benjamin "Daniel" Barrentine NASA LPV NDE Lead ASNT NDT Level III 215708
AWS CWI 06030451 / AWS CRI 1503011N
Marshall Space Flight Center Bldg 4705 Rm B200A
4. Period of Performance
2 – 4 weeks ARO
File details come from the government source that posted it. Updated .