This is a Statement of Work for the refabrication of multi-layer insulation (MLI) blankets for a lunar lander mission. The work involves remaking thermal protection blankets that were originally designed for the MSolo-1 mission on an Astrobotic lander but were damaged during integration testing. The contractor shall execute a build-to-print effort based on previous Aerothreads order 1161, which serves as the design baseline.

The contractor's responsibilities include holding a System Requirements Review (SRR) and Test Critical Design Review (CDR), conducting flight testing of the blankets, and delivering and installing the completed blankets. Performance will be executed at the Aerothreads facility in Riverdale, Maryland, with all build and testing activities to be completed by October 30, 2027, commencing from contract award.

View the file

Other files for this federal contract opportunity

Other files attached to MLI blanket fabrication, newest first.
File Type Posted
SATPC0041920 Tab 07 Capability Statement.pdf PDF
SATPC0041920 Tab 06 RDSS..pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements This is a refabrication of the design that was fabricated for the MSolo-1 mission on Astrobotic. This has been remanifested on a new lander and due to the flight status, this needs to have the MLI remade as it was destroyed (dirty) in the testing when it was integrated on the Astrobotic lander

2. Characteristics, Scope, and Specs The contractor shall perform the following duties:

• build-to-print effort based upon previous Aerothreads order 1161

• hold a System Requirements Review (SRR)

• hold a Test Critical Design Review (CDR)

• flight test blankets

• delivery and installation of blankets

3. Place of Performance Aerothreads facility Riverdale, MD

4. Period of Performance Build and Testing shall be performed contract award through October 30, 2027.