SATPC0041885 Tab 04 4 SOW.pdf

PDF 47 KB Posted

Attached to
HIP Optimization Study for GRX-810 Federal contract opportunity
Solicitation number
80NSSC26938863Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This is a Statement of Work (SOW) for a HIP (Hot Isostatic Pressing) Study for NASA.

The vendor is required to perform 30 Hot Isostatic Pressing cycles on creep specimen blanks provided by NASA. The vendor must possess all necessary equipment and sensors in-house to conduct detailed reports required for the research study and demonstrate flexibility regarding HIP parameters and scheduling. HIP parameters are constrained to maximum specifications: 2000°C temperature, 200 MPa pressure, and a combined hold and cooling time not exceeding 8 hours total. Argon 4.5 must be used as the pressure medium. The vendor must provide comprehensive documentation to NASA for each HIP cycle performed. All 30 HIP cycles must be completed within 12 weeks following the award of the purchase order.

View the file

Other files for this federal contract opportunity

Other files attached to HIP Optimization Study for GRX-810, newest first.
File Type Posted
SATPC0041885 Tab 10 1 RFQ Open Market Template OTSB.pdf PDF
SATPC0041885 Tab 10 1 RFQ Open Market RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HIP Study SOW

30 creep specimen blanks will be provided by NASA.

Vendors must have all the necessary equipment and sensors in-house to perform the necessary detailed reports required for this research study. In addition. The vendor must be flexible on the HIP parameters and schedule.

HIP parameters will be within these maximums o Maximum temperature: 2000 °C o Maximum pressure: 200 MPa o Maximum hold and cooling time in total: 8 h

Pressure medium – Argon 4.5

Documentation must be provided to NASA for each HIP cycle performed.

30 HIP cycles in total will be performed.

HIP cycles must be completed 12 weeks after awarded PO

File details come from the government source that posted it. Updated .