SATPC0041722 Tab 04 4a SPECS.pdf
PDF 561 KB Posted
- Attached to
- Service contract for VersaProbe II (XPS) system Federal contract opportunity
- Solicitation number
- 80NSSC26937813Q
About this file
This document specifies requirements for a renewal maintenance service contract for a VersaProbe II H system at NASA Glenn Research Center (GRC). The Smart Sensing and Electronics System branch requires this maintenance contract to support surface analysis of materials used in silicon carbide integrated circuits and sensors development for aerospace applications.
The contract must be a one-year service agreement with the original equipment manufacturer (OEM) or an authorized representative. The contractor must provide one preventative maintenance visit during the contract period and cover repair of 52 specified system components and assemblies at no additional charge, including crystal heater control assemblies, power supplies, transfer rods, vacuum controllers, oven controls, analytical meters, X-ray sources, microscope components, electron beam power supplies, chamber assemblies, lenses, shutters, X-ray anodes, heating assemblies, rotary vane pumps, ion pumps, turbo pumps, power distribution and control modules, ion sources, hydraulic lifters, motor stages, cooling chillers, analyzer controls, software (MultiPak V9.9), data acquisition assemblies, and various cameras and optical components. The specification also references optional components including a 95mm sample holder, hydraulic lifter tool, upgrade kit to convert base VP to VP II system, and intro ion gauge. The estimated period of performance is one year.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications for VersaProbe II H system service contract
The Smart Sensing and Electronics System branch at NASA Glenn Research Center (GRC) at Lewis Field focuses on developing silicon carbide (SiC) integrated circuits (ICs) and sensors for aerospace applications. NASA GRC is requesting renewal for maintenance contract of a VersaProbe II H system for surface analyses of materials used in development of the ICs and sensors.
Requirements for contract:
1. Must be with the OEM or authorized representative
2. Must be for one (1) year
3. Must include one (1) preventative maintenance (PM) visit
4. Must cover repair of the following parts at no additional charge:
a. ASSY-XTAL HEATER CONTROL
b. SPM3V6A6D4, POWER-ONE SUPPLY
c. MAGNETIC TRANSFER ROD-23 INCH
d. ASSY-TSP CTRL,PHI VER,SIDE OUT
e. ASSY-SYSTEM VACUUM CONTROLLER
f. ASSY-OVEN/PNEU CNTRL,SEMI/CE
g. METER-PICOAM,AUTORANGE
h. QASSY, XRAY SOURCE, QUANTERA
i. ASSY-CARD RACK PWR SPLY,CE97
j. MOD 04-040 MICROSCOPE 83852MOD 11-425, E BEAM PWR SPLY, 110 VAC
k. CHAMBER VERSAPROBE, SUS
l. ASSY-SHUTTER,LENS,36-500
m. X-RAY ANODE W/COLLECTOR,36-500
n. ASSY-HTR,CERAMIC,BAKING,1KW,24
o. ASSY-HTR,CERAMIC,BAKING,1KW,24
p. ASSY-HTR,CERAMIC,BAKING,1KW,24
q. ASSY-HTR,CERAMIC,BAKING,1KW,24
r. ASSY-LENS CONTROL,VERSA
s. ASSY-LENS/ANALYZER,VERSA
t. PUMP-ROT V,GLD-136C,1PHA
u. PUMP-ROT V,GLD-136C,1PHA
v. ASSY-ION PUMP,240L/S,D-I,SC,TS
w. MOD 50-010 SYS PWR DISTRIBUTION
x. MOD 50-011 SYSTEM POWER CNTRL, VERSA
y. IASSY, 06-350E ION SOURCE, VP version
z. HYDRAULIC LIFTER,FXS-VERSA
aa. MOD 15-5000 MTR STAGE,;45/-45D
bb. PUMP-TURBO,HIPACE80 W/TC110
cc. KIT-UPDT,TURBN-PUMP,16-050A
dd. CAMERA-CMOS,COLOR USB DFK42AUC03
ee. CNTL,BRAX3400,W/O PWR
ff. CHILLER-AIR COOLED, 1.3KW, 3BAR, RKS402J-MV
gg. ASSY-ANALYZER CTRL,MOD20-376A,TESTED
hh. ASSY-GAUZE LENS CTRL,MOD20-450,TESTED
ii. SFTWR-MULTIPAK,V9.9
jj. ASSY-E-NEUT CTRL,MOD742A W/BRKT,TESTED
kk. CAMERA-acA4024-8gc
ll. LENS-STD,16MM,F2.0,Basler C23-1620-5M-P
mm. DIGITEL MPC-500MA,W/TSP OPT
nn. PS-TURBO,PFEIFFER,TPS110,ROHS
oo. ASSY-TERMINATOR,SCA,VP2
pp. ASSY-AMP/DISCRIMINATOR, 16CH, ROHS
qq. ASSY-STAGE CTRL,MODEL 921, TES
rr. ASSY-MOD 80A,BIAS PS,ROHS
ss. ASSY-NEUTRALIZER,VERSA (TANT)
tt. CMPTR, HP, Z4 G5, WIN11, ENG, ROHS
uu. ASSY-38-101A DATA ACQ,TESTED
vv. ASSY-MOD 20-068,ION GN CTL,L,BNDBLK,TSTD
ww. OPTION - 95MM SAMPLE
xx. OPTION - HYDRAULIC LIFTER TOOL
yy. KIT-UPGRADE,BASE VP TO VPll
zz. OPTION - INTRO ION GAUGE
The estimated period of performance is 1 year
File details come from the government source that posted it. Updated .