This is a Statement of Work (SOW) for NASA Langley Research Center's procurement of Original Equipment Manufacturer (OEM) spare parts for the 155L38 Axi compressor (Machine Reference 20925) used at the Transonic Dynamics Tunnel facility. The contractor shall manufacture, supply, and deliver five specific items: one gauge for oil level (Material Y23-048-001), one mechanical seal (Material 5561LR01001), two mechanical seals (Material 5561LR02001), two O-rings (Material 002-305-267), and two taper pins for timing gear (Material Y23-040-001). All parts must be compatible with the existing DR20925CL TCP - Axi L Line & H Line model 155L38 and packaged securely to prevent transit damage to NASA Langley Research Center located at 7 E Reid Street, Hampton, Virginia 23681.
The target delivery timeframe is two working weeks after receipt of order (ARO), though the government acknowledges that standard manufacturing lead times vary and extended delivery periods are acceptable, with up to 33 working weeks permitted for Item 30 and up to 15 weeks for other items. Partial shipments are permitted if items become available at different times. The contractor must comply with all applicable national and international export control regulations as noted in the referenced quotation number 20502949. The SOW does not specify pricing terms, response dates, award dates, or set-asides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0041649 Tab 07 Capability Statement Template.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1.0 Introduction/Background: NASA Langley Research Center requires critical spare parts to maintain and ensure the continued operational reliability of the 155L38 Axi compressor (Machine Ref: 20925). This requirement is for the procurement of specific mechanical seals, gauges, O-rings, and taper pins necessary for routine maintenance and repair of the compressor line.
2.0 Scope of Work: This Statement of Work covers the acquisition and delivery of Original Equipment Manufacturer (OEM) spare parts from Siemens Energy for the 155L38 Axi compressor.
3.0 Objectives: The objective of this procurement is to obtain the necessary replacement components to prevent prolonged downtime and maintain the operational readiness of the 155L38 Axi compressor for the Transonic Dynamics Tunnel facility.
4.0 Description of the Work/Contractor Tasks:
The Contractor shall manufacture, supply, and deliver the following specific parts as detailed in Quotation 20502949:
Item 10: One (1) Gauge for Oil Level - AXI (Material: Y23-048-001) Item 20: One (1) Mechanical Seal - 155L AXI (Material: 5561LR01001) Item 30: Two (2) Mechanical Seals - 155L AXI (Material: 5561LR02001) Item 40: Two (2) O-rings (Material: 002-305-267) Item 50: Two (2) Taper Pins for Timing Gear - 155L AXI (Material: Y23-040-001)
All parts must be compatible with the existing DR20925CL TCP - Axi L Line & H Line (Model number 155L38). The Contractor shall ensure all items are packaged securely to prevent damage during transit to NASA Langley Research Center.
5.0 Deliverables: The Contractor shall provide the following deliverables to NASA:
Hardware Delivery: All parts listed in Section 4.0 must be delivered to NASA Langley Research Center (7 E Reid St, Hampton VA 23681).
Delivery Schedule: The target delivery timeframe for all parts is two (2) working weeks after receipt of the order (ARO). However, the Government acknowledges that standard manufacturing lead times for these components vary. Extended delivery timeframes aligning with the manufacturer's standard delivery times (up to 33 working weeks for Item 30, and up to 15 weeks for other items) are acceptable. Partial shipments are permitted if some items are available sooner than others.
Other Considerations:
Applicable Documents/Background: The Contractor shall comply with all applicable national and international export control regulations as noted in the quotation.