This is a Statement of Work (SOW) for NASA Marshall Space Flight Center outlining the procurement of a cryocooler assembly. The Contractor will supply a complete cryocooler system comprising ten components: a Cryotel GT CT acceptor, a 48V GEN2 GT controller with RTD and ROHS compliance, a permanent water jacket, RTD assembly, GT balance absorber, permanent NW50 flange, cooler power cable, RS-232 serial communication cable, RS232 to USB adaptor, and legacy RTD cable. All items are detailed in Quote No Q-93940. The contract commences on June 16, 2026, with a completion date of 4-6 weeks following Authority to Proceed, contingent upon expedition agreement between the parties.
The deliverables consist of the cryocooler and accessories as specified in Quote No Q-93940. Payment terms indicate that NASA will compensate the Contractor for services provided, though the specific dollar amount is not specified in this document. The SOW references the associated quote for detailed pricing and technical specifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Introduction This Statement of Work (SOW) outlines the scope of work to be performed . (the "Contractor") for NASA Marshall Space Flight Center (the "Client") in relation to the procurement of the cryocooler assembly summarized in Quote No Q-93940.
Scope of Work The Contractor will supply the cryocooler assembly, including:
1. Cryotel GT: CT acceptor
2. Controller 48V, GEN2, GT, RTD, ROHS Compliant
3. Permanent Water Jacket – CT/GT
4. RTD Assembly
5. GT- Balance Absorber
6. Permanent NW50 Flange – CT/GT
7. Cooler Power Cable
8. RS-232 Serial Communication Cable
9. Adaptor, RS232 to USB
10. RTD Cable - Legacy
Deliverables The Contractor will deliver the following items to the Client: cryocooler and accessories detailed in Quote No Q- Q-93940.
Timeline The following timeline will be adhered to:
Start date: 2026-06-16
Completion date: Authority to Proceed plus 4-6 weeks, as agreed to for expedition.
Payment The Client agrees to pay the Contractor the sum of for the services provided.