This is a Recommendation and Determination to Solicit from One Source or Brand Name document from NASA's Shared Services Center, dated March 15, 2017.

NASA recommends negotiating exclusively with Sheldon Manufacturing Inc. to procure a thermal vacuum (TVAC) bake-out chamber for the Kennedy Space Center. The procurement is justified as a brand name acquisition under the rationale that competition is impractical. The estimated period of performance or lead-time for delivery is 9/30/2026, with a total estimated cost that is redacted in the document. The justification emphasizes that the required items and services must be procured from the suggested source due to unique characteristics essential for compatibility with existing hardware configurations currently in use at Kennedy Space Center. The TVAC chamber's specific dimensions, thermal cycling capability, vacuum performance, and control system architecture are uniquely tailored to the center's established test setups, fixture interfaces, and operational control systems. The document notes that these characteristics are not standardized across the broader market and that alternate chambers cannot be substituted without causing significant modifications to existing hardware. Market research confirmed that commercially available alternatives do not offer chambers with the specific configuration, interface requirements, and operational envelope required to support existing bake-out processes. The document identifies substantial cost, schedule, and compatibility impacts if any vendor other than the suggested source were used, including potential needs for redesigning fixtures, modifying support hardware, requalifying materials, conducting additional testing, and experiencing schedule delays that could affect mission integration timelines and critical path processing flows.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 2 V2.0 3-15-2017 additional qualification testing, and potential delays to downstream mission integration activities.

Schedule impacts could be substantial due to the need to rework hardware interfaces, revise test procedures, and completely new verifications before the hardware can be processed. Such delays could affect mission integration timelines, risk downstream milestone slips, and reduce available margin in critical path processing flows. Compatibility impacts are the most significant concern. Alternate vendors’ chambers do not match the geometries, interface points, vacuum port locations, thermal performance characteristics, or control system features required to safely and effectively conduct bake out operations for existing hardware. Any attempt to adapt alternate equipment could compromise test integrity, introduce risk to sensitive components, or result in noncompliance with established bake out requirements.

ADDITIONAL COMMENTS:

For these reasons, the use of any vendor other than the suggested source would introduce unacceptable technical, financial, and schedule risks to the government.