SATPC0041060 Tab 04 4 SOW..pdf

PDF 108 KB Posted

Attached to
PR STATION-HP GAS FACILITY - HPGF Pressurization Valves
Solicitation number
80NSSC26932119Q-1
Issued by

About this file

This is a Procurement Specification for pressure regulation and relief valve components to be supplied to Stennis Space Center in Mississippi. The procurement requires a complete bill of materials consisting of new Emerson parts from the TESCOM and Anderson Greenwood product lines, including pressure regulators, isolation valves, relief valves, check valves, repair kits, and associated documentation.

The technical requirements specify eight pressure regulator models with quantities ranging from 2 to 5 units, four isolation valve models in sizes from 1/4" to 1.5" with a total of 24 units, and five Anderson Greenwood relief valve models set at various pressure ratings (50 psi to 835 psi) with a combined total of 7 units. Additionally, four 1" check valves are required as estimated cost components, along with data plates for all components. All associated TESCOM repair kits must match the quoted part numbers. Quality and documentation requirements include Material Test Reports for all pressure-boundary components, Certificates of Conformance, and functional and proof test reports for items requiring testing. The vendor must ensure all hardware is traceable to original equipment manufacturer production, properly packaged to prevent damage, and compliant with applicable specifications. The lead time requirement is less than 20 weeks after award, with delivery to Stennis Space Center, MS 39529-6000.

View the file

Other files

File Type Posted
SATPC0041060 Tab 10 RFQ Open Market Template.pdf PDF
SATPC0041060 Tab 06 BNJ..pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Specification

1. Scope Provide the full bill of materials (regulators, isolation valves, repair kits, relief valves, and test reports) for use at Stennis Space Center. All components shall be new, Emerson (TESCOM/Anderson Greenwood) parts.

2. Technical Requirements

2.1 Pressure Regulators & Accessories

• Model 26-1065-74-893, spring-loaded, hand-operated, self-relieving, 316SS, 10,000 psi max inlet, 10–1500 psi outlet (Qty 5)

• Model 26-1161-782 reducing regulator (Qty 2)

• Model 26-1261-7161-040 reducing regulator (Qty 5)

• Model 26-1662-74-721 reducing regulator, 1/4", venting (Qty 4)

• Model 26-1661-74-721, spring-loaded, self-relieving, 316SS, 6000 psi inlet, 0–150 psi outlet (Qty 5)

• Air-loaded regulator DHA6AVGV9A669-21, 1" (Qty 5)

• Dome-loaded regulator DHD6DVGC9A669-21, 1" (Qty 2)

All associated TESCOM repair kits shall match the part numbers quoted.

2.2 Isolation Valves

• 1/4" Model 30-1101-704-180 (Qty 1)

• 3/4" Model 30-1201-712-002 (Qty 5)

• 1" Model 30-1201-716-002 (Qty 13)

• 1.5" Model 30-1401-724 (Qty 5)

2.3 Relief Valves (Anderson Greenwood)

• 81SF1624-H, 2" × 3", 2 units set at 600 psi, 2 units set at 50 psi (Qty 4)

• 81SF68-8, 3/4" × 1", set at 150 psi (Qty 1)

• 81SF68-6, 3/4" × 1", set at 250 psi (Qty 1)

• 81SF1216-G, 1.5" × 2", set at 810 psi (Qty 1)

• 81SF1216-F, 1.5" × 2", set at 835 psi (Qty 1)

2.4 Additional Components

• SSP CH16-16FAS-1-316 AS5202 1" check valve (Qty 4) – estimated cost component

• Data plates for all components

3. Quality & Documentation Requirements

• Material Test Reports (MTR) for all pressure-boundary components

• Certificate of Conformance (C of C)

• Functional and proof test reports for all items requiring testing

4. Lead Times

• Less than 20 weeks after award

5. General Requirements The Vendor shall ensure all hardware is traceable to OEM production, properly packaged to prevent damage, and compliant with all applicable specifications.

6. Delivery Components shall be delivered to the below address:

Stennis Space Center, MS 39529-6000

1. Scope
2. Technical Requirements
2.1 Pressure Regulators & Accessories
2.2 Isolation Valves
2.3 Relief Valves (Anderson Greenwood)
2.4 Additional Components
3. Quality & Documentation Requirements
4. Lead Times
5. General Requirements
6. Delivery

File details come from the government source that posted it. Updated .