About this file
Statement of Work Summary: ASTRAL Materials TechLeap Orbital Mission
This is a Statement of Work for a NASA contract supporting semiconductor manufacturing advancement under the CHIPS and Science Act of 2021. The contractor, who received a NASA SBIR IGNITE Phase II award, is tasked with developing a ground-based prototype of a microgravity-assisted crystal growth furnace to enable the first-ever on-orbit silicon crystal growth. The work supports the Space Technology Mission Directorate (STMD) and In-Space Production Applications (InSPA) Portfolio objectives to establish low-Earth orbit manufacturing capabilities leveraging International Space Station resources.
The primary objectives require the contractor to: verify that the specialized crystal-growth furnace design survives re-entry and recovery while protecting sample material integrity using the SpaceWorks capsule; support detailed post-mission evaluation of flight and terrestrial control samples; develop a terrestrial analog unit for ground-based testing and control specimen synthesis; compile results correlating process conditions with material quality; and arrange independent evaluation of pre- and post-flight silicon samples, with NASA retaining the option for additional evaluation. Deliverables include quarterly reports, a Flight-Unit Environmental Testing Report (60 days), Science Requirements Document (120 days), Test Plan (180 days), Initial Ground Qualification Samples (300 days), Mission Update Report with Optimized Samples (360 days), Post-Mission Summary Report (within 15 days of re-entry), and Final Report with Flight Samples (December 1, 2027). The period of performance extends from award through September 2028, with all work performed according to accepted industry practices. Shipping is directed to NASA Marshall Space Flight Center in Huntsville, Alabama.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASTRAL MATERIALS TECHLEAP ORBITAL MISSION
STATEMENT OF WORK
Advancement of semiconductor manufacturing techniques and materials consistent with the priorities of CHIPS for America under the CHIPS and Science Act of 2021 (https://www.nist.gov/chips) is essential to maintaining United States leadership in mance semiconductor technologies for both terrestrial and space applications. Within NASA, the Space Technology Mission Directorate (STMD) Enable Domain develops and ers, and other government agencies. As part of these efforts, the In-Space Manufacturing (ISM) development of the skills, processes, and institutional capacity necessary to integrate these In-Space
Production Applications (InSPA) Portfoli orbit (LEO) production opportunities that address national needs or provide public benefit by leveraging the resources of the International Space Station (ISS).
To advance these aligned goals, the contractor has received a NASA SBIR IGNITE Phase II award to develop a ground-based prototype of a microgravity-assisted crystal growth furnace capable of enabling the first-ever on-orbit silicon crystal growth. This award supports the development and evaluation of the necessary hardware to enable successful payload retrieval, post-flight materials evaluation and analysis, and reporting to the Government. This work strengthens integration between STMD and InSPA objectives and maximizes the mission impact of the resulting semiconductor technology and materials development.
This TechLeap demonstration reduces key technological and operational risks needed to enable
1. Objectives and Requirements
The main objectives of this purchase order are to:
-entry and recovery, protecting the integrity of the sample materials in the expected re-entry environment of the SpaceWorks capsule.
Support of the flight samples and terrestrial control samples.
and the synthesis of corresponding control specimens.
Compile results into a report correlating process conditions with material quality, selected by the contractor, with NASA retaining the option to perform additional evaluation.
a. Shipping information:
NASA Marshall Space Flight Center 4631 Saturn Road Central Receiving, Bldg. 4631 Huntsville, AL 35812
2. Specifications The contractor shall perform this activity in accordance with accepted industry practices. No NASA-specific specification applies.
4. Period of Performance: award through September 2028
5. Schedule and Milestone Payments The Estimated Completion Date (ECD) of milestones and payments shall be as follows:
Quarterly Reports will be provided by the contractor.
Milestone Description Due Date
1 Kickoff Meeting Authorization to Proceed + Fifteen (15) Days
Flight-Unit Environmental Testing Report
Authorization to Proceed + Sixty (60) Days
Science Requirements Document for the Ground Unit
Authorization to Proceed + One Hundred and Twenty (120) Days
Test Plan for Flight Samples and Terrestrial Control Samples (post-flight analysis)
Authorization to Proceed + One Hundred and Eighty (180) Days
Initial Ground Qualification Samples delivered to NASA
Authorization to Proceed + Three Hundred (300) Days
Mission Update Report & Optimized Ground Qualification Samples Delivered to NASA
Authorization to Proceed + Three Hundred and Sixty (360) Days
7 Post-Mission Summary Report Within Fifteen (15) Days Following Re-entry *
Final Report & Flight Sample(s) delivered to NASA for independent evaluation
December 1, 2027
* thirty (30) days may be applied to ensure adequate flexibility for unanticipated delays.